close this message
arXiv smileybones

arXiv Is Hiring a DevOps Engineer

Work on one of the world's most important websites and make an impact on open science.

View Jobs
Skip to main content
Cornell University

arXiv Is Hiring a DevOps Engineer

View Jobs
We gratefully acknowledge support from the Simons Foundation, member institutions, and all contributors. Donate
arxiv logo > q-fin > arXiv:1303.6654

Help | Advanced Search

arXiv logo
Cornell University Logo

quick links

  • Login
  • Help Pages
  • About

Quantitative Finance > General Finance

arXiv:1303.6654 (q-fin)
[Submitted on 20 Mar 2013]

Title:How (In)accurate Are Demand Forecasts in Public Works Projects? The Case of Transportation

Authors:Bent Flyvbjerg, Mette Skamris Holm, Søren L. Buhl
View a PDF of the paper titled How (In)accurate Are Demand Forecasts in Public Works Projects? The Case of Transportation, by Bent Flyvbjerg and 2 other authors
View PDF
Abstract:This article presents results from the first statistically significant study of traffic forecasts in transportation infrastructure projects. The sample used is the largest of its kind, covering 210 projects in 14 nations worth US$59 billion. The study shows with very high statistical significance that forecasters generally do a poor job of estimating the demand for transportation infrastructure projects. The result is substantial downside financial and economic risks. Such risks are typically ignored or downplayed by planners and decision makers, to the detriment of social and economic welfare. For nine out of ten rail projects passenger forecasts are overestimated; average overestimation is 106 percent. This results in large benefit shortfalls for rail projects. For half of all road projects the difference between actual and forecasted traffic is more than plus/minus 20 percent. Forecasts have not become more accurate over the 30-year period studied. If techniques and skills for arriving at accurate demand forecasts have improved over time, as often claimed by forecasters, this does not show in the data. The causes of inaccuracy in forecasts are different for rail and road projects, with political causes playing a larger role for rail than for road. The cure is transparency, accountability, and new forecasting methods. The challenge is to change the governance structures for forecasting and project development. The article shows how planners may help achieve this.
Comments: arXiv admin note: text overlap with arXiv:1302.2544, arXiv:1303.6571, arXiv:1302.3642
Subjects: General Finance (q-fin.GN)
Cite as: arXiv:1303.6654 [q-fin.GN]
  (or arXiv:1303.6654v1 [q-fin.GN] for this version)
  https://doi.org/10.48550/arXiv.1303.6654
arXiv-issued DOI via DataCite
Journal reference: Journal of the American Planning Association, vol. 71, no. 2, Spring 2005, 131-146

Submission history

From: Bent Flyvbjerg [view email]
[v1] Wed, 20 Mar 2013 12:14:55 UTC (404 KB)
Full-text links:

Access Paper:

    View a PDF of the paper titled How (In)accurate Are Demand Forecasts in Public Works Projects? The Case of Transportation, by Bent Flyvbjerg and 2 other authors
  • View PDF
  • Other Formats
view license
Current browse context:
q-fin.GN
< prev   |   next >
new | recent | 2013-03
Change to browse by:
q-fin

References & Citations

  • NASA ADS
  • Google Scholar
  • Semantic Scholar
a export BibTeX citation Loading...

BibTeX formatted citation

×
Data provided by:

Bookmark

BibSonomy logo Reddit logo

Bibliographic and Citation Tools

Bibliographic Explorer (What is the Explorer?)
Connected Papers (What is Connected Papers?)
Litmaps (What is Litmaps?)
scite Smart Citations (What are Smart Citations?)

Code, Data and Media Associated with this Article

alphaXiv (What is alphaXiv?)
CatalyzeX Code Finder for Papers (What is CatalyzeX?)
DagsHub (What is DagsHub?)
Gotit.pub (What is GotitPub?)
Hugging Face (What is Huggingface?)
Papers with Code (What is Papers with Code?)
ScienceCast (What is ScienceCast?)

Demos

Replicate (What is Replicate?)
Hugging Face Spaces (What is Spaces?)
TXYZ.AI (What is TXYZ.AI?)

Recommenders and Search Tools

Influence Flower (What are Influence Flowers?)
CORE Recommender (What is CORE?)
  • Author
  • Venue
  • Institution
  • Topic

arXivLabs: experimental projects with community collaborators

arXivLabs is a framework that allows collaborators to develop and share new arXiv features directly on our website.

Both individuals and organizations that work with arXivLabs have embraced and accepted our values of openness, community, excellence, and user data privacy. arXiv is committed to these values and only works with partners that adhere to them.

Have an idea for a project that will add value for arXiv's community? Learn more about arXivLabs.

Which authors of this paper are endorsers? | Disable MathJax (What is MathJax?)
  • About
  • Help
  • contact arXivClick here to contact arXiv Contact
  • subscribe to arXiv mailingsClick here to subscribe Subscribe
  • Copyright
  • Privacy Policy
  • Web Accessibility Assistance
  • arXiv Operational Status
    Get status notifications via email or slack