Skip to main content

Showing 1–3 of 3 results for author: Xiao, O

Searching in archive physics. Search in all archives.
.
  1. arXiv:1705.05068  [pdf

    physics.acc-ph

    Commissioning of te China-ADS injector-I testing facility

    Authors: Fang Yan, Huiping Geng, Cai Meng, Yaliang Zhao, Huafu Ouyang, Shilun Pei, Rong Liu, Feisi He, Tongming Huang, Rui Ge, Yanfeng Sui, Qiang Ye, Xiaoping Jing, Fengli Long, Jungang Li, Quanling Peng, Dizhou Guo, Zusheng Zhou, Haiyin Lin, Xinpeng Ma, Qunyao Wang, Guangwei Wang, Hua Shi, Gang Wu, Shengchang Wang , et al. (36 additional authors not shown)

    Abstract: The 10 MeV accelerator-driven subcritical system (ADS) Injector-I test stand at Institute of High Energy Physics (IHEP) is a testing facility dedicated to demonstrate one of the two injector design schemes [Injector Scheme-I, which works at 325 MHz], for the ADS project in China. The Injector adopted a four vane copper structure RFQ with output energy of 3.2 MeV and a superconducting (SC) section… ▽ More

    Submitted 15 May, 2017; originally announced May 2017.

    Comments: 11 pages,27 figures

  2. arXiv:1505.07528  [pdf

    physics.acc-ph hep-ex

    RF modulation studies on the S band pulse compressor

    Authors: G. Shu, F. Zhao, S. Pei, O. Xiao

    Abstract: An S band SLED-type pulse compressor has been manufactured by IHEP to challenge the 100 MW maximum input power, which means the output peak power is about 500 MW at the phase reversal time. In order to deal with the RF breakdown problem, the dual side-wall coupling irises model was used. To further improve the reliability at very high power, amplitude modulation and phase modulation with flat-top… ▽ More

    Submitted 27 May, 2015; originally announced May 2015.

  3. Impedance Measurements of the Extraction Kicker System for the Rapid Cycling Synchrotron of China Spallation Neutron Source

    Authors: Liangsheng Huang, Sheng Wang, Yudong Liu, Yong Li, Renhong Liu, Ouzheng Xiao

    Abstract: The fast extraction kicker system is one of the most important accelerator components, whose inner structure will be the main source of the impedance in the RCS. It is necessary to understand the kicker impedance before its installation into the tunnel. The conventional and improved wire methods are employed for the benchmarking impedance measurement results. The simulation and measurements confir… ▽ More

    Submitted 7 April, 2015; originally announced April 2015.

    Comments: 19 piges, 17 figures