-
Study of space charge in the ICARUS T600 detector
Authors:
M. Antonello,
B. Baibussinov,
V. Bellini,
F. Boffelli,
M. Bonesini,
A. Bubak,
S. Centro,
K. Cieslik,
A. G. Cocco,
A. Dabrowska,
A. Dermenev,
A. Falcone,
C. Farnese,
A. Fava,
A. Ferrari,
D. Gibin,
S. Gninenko,
A. Guglielmi,
M. Haranczyk,
J. Holeczek,
M. Kirsanov,
J. Kisiel,
I. Kochanek,
J. Lagoda,
A. Menegolli
, et al. (23 additional authors not shown)
Abstract:
The accumulation of positive ions, produced by ionizing particles crossing Liquid Argon Time Projection Chambers (LAr-TPCs), may generate distortions of the electric drift field affecting the track reconstruction of the ionizing events. These effects could become relevant for large LAr-TPCs operating at surface or at shallow depth, where the detectors are exposed to a copious flux of cosmic rays.…
▽ More
The accumulation of positive ions, produced by ionizing particles crossing Liquid Argon Time Projection Chambers (LAr-TPCs), may generate distortions of the electric drift field affecting the track reconstruction of the ionizing events. These effects could become relevant for large LAr-TPCs operating at surface or at shallow depth, where the detectors are exposed to a copious flux of cosmic rays. A detailed study of such possible field distortions in the ICARUS T600 LAr-TPC has been performed analyzing a sample of cosmic muon tracks recorded with one T600 module operated at surface in 2001. The maximum track distortion turns out to be of few mm in good agreement with the prediction by a numerical calculation. As a cross-check, the same analysis has been performed on a cosmic muon sample recorded during the ICARUS T600 run at the LNGS underground laboratory, where the cosmic ray flux was suppressed by a factor $\sim 10^6$ by 3400 m water equivalent shielding. No appreciable distortion has been observed, confirming that the effects measured on surface are actually due to ion space charge.
△ Less
Submitted 28 May, 2020; v1 submitted 24 January, 2020;
originally announced January 2020.
-
Muon momentum measurement in ICARUS-T600 LAr-TPC via multiple scattering in few-GeV range
Authors:
Maddalena Antonello,
Bagdat Baibussinov,
Vincenzo Bellini,
Pietro Angelo Benetti,
Fabrizio Boffelli,
Arkadiusz Bubak,
Elio Calligarich,
Sandro Centro,
Tommaso Cervi,
Alessandra Cesana,
Krzysztof Cieslik,
Alfredo G. Cocco,
Anna Dabrowska,
Alexander Dermenev,
Andrea Falcone,
Christian Farnese,
Angela Fava,
Alfredo Ferrari,
Daniele Gibin,
Sergei Gninenko,
Alberto Guglielmi,
Malgorzata Haranczyk,
Jacek Holeczek,
Michal Janik,
Mikhail Kirsanov
, et al. (32 additional authors not shown)
Abstract:
The measurement of muon momentum by Multiple Coulomb Scattering is a crucial ingredient to the reconstruction of νμ CC events in the ICARUS-T600 liquid argon TPC in absence of magnetic field, as in the search for sterile neutrinos at Fermilab where ICARUS will be exposed to ~1 GeV Booster neutrino beam. A sample of ~1000 stopping muons produced by charged current interactions of CNGS νμ in the sur…
▽ More
The measurement of muon momentum by Multiple Coulomb Scattering is a crucial ingredient to the reconstruction of νμ CC events in the ICARUS-T600 liquid argon TPC in absence of magnetic field, as in the search for sterile neutrinos at Fermilab where ICARUS will be exposed to ~1 GeV Booster neutrino beam. A sample of ~1000 stopping muons produced by charged current interactions of CNGS νμ in the surrounding rock at the INFN Gran Sasso underground Laboratory provides an ideal benchmark in the few-GeV range since their momentum can be directly and independently obtained by the calorimetric measurement. Stopping muon momentum in the 0.5- 4.5 GeV/c range has been reconstructed via Multiple Coulomb Scattering with resolution ranging from 10 to 25 % depending on muon energy, track length and uniformity of the electric field in the drift volume.
△ Less
Submitted 28 February, 2017; v1 submitted 22 December, 2016;
originally announced December 2016.
-
Operation and performance of the ICARUS-T600 cryogenic plant at Gran Sasso underground Laboratory
Authors:
M. Antonello,
P. Aprili,
B. Baibussinov,
F. Boffelli,
A. Bubak,
E. Calligarich,
N. Canci,
S. Centro,
A. Cesana,
K. Cieślik,
D. B. Cline,
A. G. Cocco,
A. Dabrowski,
A. Dermenev,
J. M. Disdier,
A. Falcone,
C. Farnese,
A. Fava,
A. Ferrari,
D. Gibin,
S. Gninenko,
A. Guglielmi,
M. Haranczyk,
J. Holeczek,
A. Ivashkin
, et al. (33 additional authors not shown)
Abstract:
ICARUS T600 liquid argon time projection chamber is the first large mass electronic detector of a new generation able to combine the imaging capabilities of the old bubble chambers with the excellent calorimetric energy measurement. After the three months demonstration run on surface in Pavia during 2001, the T600 cryogenic plant was significantly revised, in terms of reliability and safety, in vi…
▽ More
ICARUS T600 liquid argon time projection chamber is the first large mass electronic detector of a new generation able to combine the imaging capabilities of the old bubble chambers with the excellent calorimetric energy measurement. After the three months demonstration run on surface in Pavia during 2001, the T600 cryogenic plant was significantly revised, in terms of reliability and safety, in view of its long-term operation in an underground environment. The T600 detector was activated in Hall B of the INFN Gran Sasso Laboratory during Spring 2010, where it was operated without interruption for about three years, taking data exposed to the CERN to Gran Sasso long baseline neutrino beam and cosmic rays. In this paper the T600 cryogenic plant is described in detail together with the commissioning procedures that lead to the successful operation of the detector shortly after the end of the filling with liquid Argon. Overall plant performance and stability during the long-term underground operation are discussed. Finally, the decommissioning procedures, carried out about six months after the end of the CNGS neutrino beam operation, are reported.
△ Less
Submitted 22 April, 2015; v1 submitted 7 April, 2015;
originally announced April 2015.
-
Some conclusive considerations on the comparison of the ICARUS nu_mu to nu_e oscillation search with the MiniBooNE low-energy event excess
Authors:
M. Antonello,
B. Baibussinov,
P. Benetti,
F. Boffelli,
A. Bubak,
E. Calligarich,
S. Centro,
A. Cesana,
K. Cieslik,
D. B. Cline,
A. G. Cocco,
A. Dabrowska,
A. Dermenev,
A. Falcone,
C. Farnese,
A. Fava,
A. Ferrari,
D. Gibin,
S. Gninenko,
A. Guglielmi,
M. Haranczyk,
J. Holeczek,
M. Kirsanov,
J. Kisiel,
I. Kochanek
, et al. (29 additional authors not shown)
Abstract:
A sensitive search for anomalous LSND-like nu_mu to nu_e oscillations has been performed by the ICARUS Collaboration exposing the T600 LAr-TPC to the CERN to Gran Sasso (CNGS) neutrino beam. The result is compatible with the absence of additional anomalous contributions giving a limit to oscillation probability of 3.4E-3 and 7.6E-3 at 90% and 99% confidence levels respectively showing a tension be…
▽ More
A sensitive search for anomalous LSND-like nu_mu to nu_e oscillations has been performed by the ICARUS Collaboration exposing the T600 LAr-TPC to the CERN to Gran Sasso (CNGS) neutrino beam. The result is compatible with the absence of additional anomalous contributions giving a limit to oscillation probability of 3.4E-3 and 7.6E-3 at 90% and 99% confidence levels respectively showing a tension between these new limits and the low-energy event excess (200 < E_nu QE < 475 MeV) reported by MiniBooNE Collaboration. A more detailed comparison of the ICARUS data with the MiniBooNE low-energy excess has been performed, including the energy resolution as obtained from the official MiniBooNE data release. As a result the previously reported tension is confirmed at 90% C.L., suggesting an unexplained nature or an otherwise instrumental effect for the MiniBooNE low energy event excess
△ Less
Submitted 17 February, 2015;
originally announced February 2015.
-
Experimental observation of an extremely high electron lifetime with the ICARUS-T600 LAr-TPC
Authors:
M. Antonello,
B. Baibussinov,
P. Benetti,
F. Boffelli,
A. Bubak,
E. Calligarich,
S. Centro,
A. Cesana,
K. Cieslik,
D. B. Cline,
A. G. Cocco,
A. Dabrowska,
A. Dermenev,
R. Dolfini,
A. Falcone,
C. Farnese,
A. Fava,
A. Ferrari,
G. Fiorillo,
D. Gibin,
S. Gninenko,
A. Guglielmi,
M. Haranczyk,
J. Holeczek,
M. Kirsanov
, et al. (32 additional authors not shown)
Abstract:
The ICARUS T600 detector, the largest liquid Argon Time Projection Chamber (LAr-TPC) realized after many years of RD activities, was installed and successfully operated for 3 years at the INFN Gran Sasso underground Laboratory. One of the most important issues was the need of an extremely low residual electronegative impurity content in the liquid Argon, in order to transport the free electrons cr…
▽ More
The ICARUS T600 detector, the largest liquid Argon Time Projection Chamber (LAr-TPC) realized after many years of RD activities, was installed and successfully operated for 3 years at the INFN Gran Sasso underground Laboratory. One of the most important issues was the need of an extremely low residual electronegative impurity content in the liquid Argon, in order to transport the free electrons created by the ionizing particles with a very small attenuation along the drift path. The solutions adopted for the Argon re-circulation and purification systems have permitted to reach impressive results in terms of Argon purity and a free electron lifetime exceeding 15 ms, corresponding to about 20 parts per trillion of equivalent O2 contamination, a milestone for any future project involving LAr-TPC's and the development of higher detector mass scales.
△ Less
Submitted 12 January, 2015; v1 submitted 19 September, 2014;
originally announced September 2014.
-
The trigger system of the ICARUS experiment for the CNGS beam
Authors:
M. Antonello,
B. Baibussinov,
P. Benetti,
F. Boffelli,
A. Bubak,
E. Calligarich,
S. Centro,
A. Cesana,
K. Cieslik,
D. B. Cline,
A. G. Cocco,
A. Dabrowska,
D. Dequal,
A. Dermenev,
R. Dolfini,
A. Falcone,
C. Farnese,
A. Fava,
A. Ferrari,
G. Fiorillo,
D. Gibin,
S. Gninenko,
A. Guglielmi,
M. Haranczyk,
J. Holeczek
, et al. (34 additional authors not shown)
Abstract:
The ICARUS T600 detector, with its 470 tons of active mass, is the largest liquid Argon TPC ever built. Operated for three years in the LNGS underground laboratory, it has collected thousands of CNGS neutrino beam interactions and cosmic ray events with energy spanning from tens of MeV to tens of GeV, with a trigger system based on scintillation light, charge signal on TPC wires and time informati…
▽ More
The ICARUS T600 detector, with its 470 tons of active mass, is the largest liquid Argon TPC ever built. Operated for three years in the LNGS underground laboratory, it has collected thousands of CNGS neutrino beam interactions and cosmic ray events with energy spanning from tens of MeV to tens of GeV, with a trigger system based on scintillation light, charge signal on TPC wires and time information (for beam related events only). The performance of trigger system in terms of efficiency, background and live-time as a function of the event energy for the CNGS data taking is presented.
△ Less
Submitted 8 August, 2014; v1 submitted 29 May, 2014;
originally announced May 2014.
-
Search for anomalies in the νe appearance from a νμ beam
Authors:
M. Antonello,
B. Baibussinov,
P. Benetti,
F. Boffelli,
A. Bubak,
E. Calligarich,
N. Canci,
S. Centro,
A. Cesana,
K. Cieslik,
D. B. Cline,
A. G. Cocco,
A. Dabrowska,
D. Dequal,
A. Dermenev,
R. Dolfini,
A. Falcone,
C. Farnese,
A. Fava,
A. Ferrari,
G. Fiorillo,
D. Gibin,
S. Gninenko,
A. Guglielmi,
M. Haranczyk
, et al. (35 additional authors not shown)
Abstract:
We report an updated result from the ICARUS experiment on the search for νμ ->νe anomalies with the CNGS beam, produced at CERN with an average energy of 20 GeV and travelling 730 km to the Gran Sasso Laboratory. The present analysis is based on a total sample of 1995 events of CNGS neutrino interactions, which corresponds to an almost doubled sample with respect to the previously published result…
▽ More
We report an updated result from the ICARUS experiment on the search for νμ ->νe anomalies with the CNGS beam, produced at CERN with an average energy of 20 GeV and travelling 730 km to the Gran Sasso Laboratory. The present analysis is based on a total sample of 1995 events of CNGS neutrino interactions, which corresponds to an almost doubled sample with respect to the previously published result. Four clear νe events have been visually identified over the full sample, compared with an expectation of 6.4 +- 0.9 events from conventional sources. The result is compatible with the absence of additional anomalous contributions. At 90% and 99% confidence levels the limits to possible oscillated events are 3.7 and 8.3 respectively. The corresponding limit to oscillation probability becomes consequently 3.4 x 10-3 and 7.6 x 10-3 respectively. The present result confirms, with an improved sensitivity, the early result already published by the ICARUS collaboration.
△ Less
Submitted 7 August, 2013; v1 submitted 17 July, 2013;
originally announced July 2013.
-
Precise 3D track reconstruction algorithm for the ICARUS T600 liquid argon time projection chamber detector
Authors:
M. Antonello,
B. Baibussinov,
P. Benetti,
E. Calligarich,
N. Canci,
S. Centro,
A. Cesana,
K. Cieslik,
D. B. Cline,
A. G. Cocco,
A. Dabrowska,
D. Dequal,
A. Dermenev,
R. Dolfini,
C. Farnese,
A. Fava,
A. Ferrari,
G. Fiorillo,
D. Gibin,
S. Gninenko,
A. Guglielmi,
M. Haranczyk,
J. Holeczek,
A. Ivashkin,
J. Kisiel
, et al. (31 additional authors not shown)
Abstract:
Liquid Argon Time Projection Chamber (LAr TPC) detectors offer charged particle imaging capability with remarkable spatial resolution. Precise event reconstruction procedures are critical in order to fully exploit the potential of this technology. In this paper we present a new, general approach of three-dimensional reconstruction for the LAr TPC with a practical application to track reconstructio…
▽ More
Liquid Argon Time Projection Chamber (LAr TPC) detectors offer charged particle imaging capability with remarkable spatial resolution. Precise event reconstruction procedures are critical in order to fully exploit the potential of this technology. In this paper we present a new, general approach of three-dimensional reconstruction for the LAr TPC with a practical application to track reconstruction. The efficiency of the method is evaluated on a sample of simulated tracks. We present also the application of the method to the analysis of real data tracks collected during the ICARUS T600 detector operation with the CNGS neutrino beam.
△ Less
Submitted 11 January, 2013; v1 submitted 18 October, 2012;
originally announced October 2012.
-
Measurement of the neutrino velocity with the ICARUS detector at the CNGS beam
Authors:
M. Antonello,
P. Aprili,
B. Baibussinov,
M. Baldo Ceolin,
P. Benetti,
E. Calligarich,
N. Canci,
F. Carbonara,
S. Centro,
A. Cesana,
K. Cieslik,
D. B. Cline,
A. G. Cocco,
A. Dabrowska,
D. Dequal,
A. Dermenev,
R. Dolfini,
C. Farnese,
A. Fava,
A. Ferrari,
G. Fiorillo,
D. Gibin,
A. Gigli Berzolari,
S. Gninenko,
A. Guglielmi
, et al. (40 additional authors not shown)
Abstract:
The CERN-SPS accelerator has been briefly operated in a new, lower intensity neutrino mode with ~10^12 p.o.t. /pulse and with a beam structure made of four LHC-like extractions, each with a narrow width of 3 ns, separated by 524 ns. This very tightly bunched beam structure represents a substantial progress with respect to the ordinary operation of the CNGS beam, since it allows a very accurate tim…
▽ More
The CERN-SPS accelerator has been briefly operated in a new, lower intensity neutrino mode with ~10^12 p.o.t. /pulse and with a beam structure made of four LHC-like extractions, each with a narrow width of 3 ns, separated by 524 ns. This very tightly bunched beam structure represents a substantial progress with respect to the ordinary operation of the CNGS beam, since it allows a very accurate time-of-flight measurement of neutrinos from CERN to LNGS on an event-to-event basis. The ICARUS T600 detector has collected 7 beam-associated events, consistent with the CNGS delivered neutrino flux of 2.2 10^16 p.o.t. and in agreement with the well known characteristics of neutrino events in the LAr-TPC. The time of flight difference between the speed of light and the arriving neutrino LAr-TPC events has been analysed. The result is compatible with the simultaneous arrival of all events with equal speed, the one of light. This is in a striking difference with the reported result of OPERA that claimed that high energy neutrinos from CERN should arrive at LNGS about 60 ns earlier than expected from luminal speed.
△ Less
Submitted 29 March, 2012; v1 submitted 15 March, 2012;
originally announced March 2012.
-
The LAGUNA design study- towards giant liquid based underground detectors for neutrino physics and astrophysics and proton decay searches
Authors:
LAGUNA Collaboration,
D. Angus,
A. Ariga,
D. Autiero,
A. Apostu,
A. Badertscher,
T. Bennet,
G. Bertola,
P. F. Bertola,
O. Besida,
A. Bettini,
C. Booth,
J. L. Borne,
I. Brancus,
W. Bujakowsky,
J. E. Campagne,
G. Cata Danil,
F. Chipesiu,
M. Chorowski,
J. Cripps,
A. Curioni,
S. Davidson,
Y. Declais,
U. Drost,
O. Duliu
, et al. (99 additional authors not shown)
Abstract:
The feasibility of a next generation neutrino observatory in Europe is being considered within the LAGUNA design study. To accommodate giant neutrino detectors and shield them from cosmic rays, a new very large underground infrastructure is required. Seven potential candidate sites in different parts of Europe and at several distances from CERN are being studied: Boulby (UK), Canfranc (Spain), F…
▽ More
The feasibility of a next generation neutrino observatory in Europe is being considered within the LAGUNA design study. To accommodate giant neutrino detectors and shield them from cosmic rays, a new very large underground infrastructure is required. Seven potential candidate sites in different parts of Europe and at several distances from CERN are being studied: Boulby (UK), Canfranc (Spain), Fréjus (France/Italy), Pyhäsalmi (Finland), Polkowice-Sieroszowice (Poland), Slanic (Romania) and Umbria (Italy). The design study aims at the comprehensive and coordinated technical assessment of each site, at a coherent cost estimation, and at a prioritization of the sites within the summer 2010.
△ Less
Submitted 30 December, 2009;
originally announced January 2010.