-
Study of the decay and production properties of $D_{s1}(2536)$ and $D_{s2}^*(2573)$
Authors:
M. Ablikim,
M. N. Achasov,
P. Adlarson,
O. Afedulidis,
X. C. Ai,
R. Aliberti,
A. Amoroso,
Q. An,
Y. Bai,
O. Bakina,
I. Balossino,
Y. Ban,
H. -R. Bao,
V. Batozskaya,
K. Begzsuren,
N. Berger,
M. Berlowski,
M. Bertani,
D. Bettoni,
F. Bianchi,
E. Bianco,
A. Bortone,
I. Boyko,
R. A. Briere,
A. Brueggemann
, et al. (645 additional authors not shown)
Abstract:
The $e^+e^-\rightarrow D_s^+D_{s1}(2536)^-$ and $e^+e^-\rightarrow D_s^+D^*_{s2}(2573)^-$ processes are studied using data samples collected with the BESIII detector at center-of-mass energies from 4.530 to 4.946~GeV. The absolute branching fractions of $D_{s1}(2536)^- \rightarrow \bar{D}^{*0}K^-$ and $D_{s2}^*(2573)^- \rightarrow \bar{D}^0K^-$ are measured for the first time to be…
▽ More
The $e^+e^-\rightarrow D_s^+D_{s1}(2536)^-$ and $e^+e^-\rightarrow D_s^+D^*_{s2}(2573)^-$ processes are studied using data samples collected with the BESIII detector at center-of-mass energies from 4.530 to 4.946~GeV. The absolute branching fractions of $D_{s1}(2536)^- \rightarrow \bar{D}^{*0}K^-$ and $D_{s2}^*(2573)^- \rightarrow \bar{D}^0K^-$ are measured for the first time to be $(35.9\pm 4.8\pm 3.5)\%$ and $(37.4\pm 3.1\pm 4.6)\%$, respectively. The measurements are in tension with predictions based on the assumption that the $D_{s1}(2536)$ and $D_{s2}^*(2573)$ are dominated by a bare $c\bar{s}$ component. The $e^+e^-\rightarrow D_s^+D_{s1}(2536)^-$ and $e^+e^-\rightarrow D_s^+D^*_{s2}(2573)^-$ cross sections are measured, and a resonant structure at around 4.6~GeV with a width of 50~MeV is observed for the first time with a statistical significance of $15σ$ in the $e^+e^-\rightarrow D_s^+D^*_{s2}(2573)^-$ process. It could be the $Y(4626)$ found by the Belle collaboration in the $D_s^+D_{s1}(2536)^{-}$ final state, since they have similar masses and widths. There is also evidence for a structure at around 4.75~GeV in both processes.
△ Less
Submitted 10 July, 2024;
originally announced July 2024.
-
Design study for a 500 MeV positron beam at the Mainz Microtron MAMI
Authors:
H. Backe,
W. Lauth,
P. Drexler,
P. Heil,
P. Klag,
B. Ledroit,
F. Stieler
Abstract:
A design study has been performed for a positron beam with an energy of 500 MeV to be realized at the applied physics area of the Mainz Microtron MAMI. Positrons will be created after pair conversion of bremsstrahlung, produced by the 855 MeV electron beam af MAMI in a tungsten converter target. From the two conceivable geometries (i) pair conversion in the bremsstrahlung converter target itself,…
▽ More
A design study has been performed for a positron beam with an energy of 500 MeV to be realized at the applied physics area of the Mainz Microtron MAMI. Positrons will be created after pair conversion of bremsstrahlung, produced by the 855 MeV electron beam af MAMI in a tungsten converter target. From the two conceivable geometries (i) pair conversion in the bremsstrahlung converter target itself, and (ii) bremsstrahlung pair conversion in a separated lead foil, the former was considered in detail. Positrons will be energy selected within an outside open electron beam-line bending magnet, and bent back by an additional sector magnet. Magnetic focusing elements in between are designed to prepare in a well shielded positron target chamber about 6 m away from the target a beam with horizontal and vertical emittances of epsilon_v = 0.055 pi mm mrad (1 sigma), and epsilon_h = 0.12 pi mm mrad (1 sigma), respectively, for a 10 micro m thick amorphous tungsten target and negligible momentum spread. At an accepted positron band width of 1 MeV, spots are expected vertically with an angular spread of 0.064 mrad and a size of 5.0 mm (FWHM), and horizontally with an angular spread of 0.64 mrad and a size of 7.7 mm (FWHM). The positron yield amounts to 13.1 per second, 1 MeV positron energy band width, and 1 nA electron beam current.
△ Less
Submitted 25 May, 2022;
originally announced May 2022.
-
Performance of the large scale HV-CMOS pixel sensor MuPix8
Authors:
H. Augustin,
N. Berger,
C. Blattgerste,
S. Dittmeier,
F. Ehrler,
C Grzesik,
J. Hammerich. A. Herkert,
L. Huth,
D. Immig,
A. Kozlinskiy,
M. Köppel,
J. Kröger,
F. Meier,
A. Meneses Gonzales,
M. Müller,
L. Noehte,
I. Perić,
M. Prathapan,
T. Rudzki,
R. Schimassek,
A. Schöning,
I. Sorokin,
F. Stieler,
A. Tyukin,
T. Wagner
, et al. (4 additional authors not shown)
Abstract:
The Mu3e experiment is searching for the charged lepton flavour violating decay $ μ^+\rightarrow e^+ e^- e^+ $, aiming for an ultimate sensitivity of one in $10^{16}$ decays. In an environment of up to $10^9$ muon decays per second the detector needs to provide precise vertex, time and momentum information to suppress accidental and physics background. The detector consists of cylindrical layers o…
▽ More
The Mu3e experiment is searching for the charged lepton flavour violating decay $ μ^+\rightarrow e^+ e^- e^+ $, aiming for an ultimate sensitivity of one in $10^{16}$ decays. In an environment of up to $10^9$ muon decays per second the detector needs to provide precise vertex, time and momentum information to suppress accidental and physics background. The detector consists of cylindrical layers of $50\, μ\text{m}$ thin High Voltage Monolithic Active Pixel Sensors (HV-MAPS) placed in a $1\,\text{T}$ magnetic field. The measurement of the trajectories of the decay particles allows for a precise vertex and momentum reconstruction. Additional layers of fast scintillating fibre and tile detectors provide sub-nanosecond time resolution. The MuPix8 chip is the first large scale prototype, proving the scalability of the HV-MAPS technology. It is produced in the AMS aH18 $180\, \text{nm}$ HV-CMOS process. It consists of three sub-matrices, each providing an untriggered datastream of more than $10\,\text{MHits}/\text{s}$. The latest results from laboratory and testbeam characterisation are presented, showing an excellent performance with efficiencies $>99.6\,\text{\%}$ and a time resolution better than $10\, \text{ns}$ achieved with time walk correction.
△ Less
Submitted 22 May, 2019;
originally announced May 2019.