Initial Beam Dynamics Simulations of a High-Average-Current Field-Emission Electron Source in a Superconducting RadioFrequency Gun
Authors:
O. Mohsen,
I. Gonin,
R. Kephart,
T. Khabiboulline,
P. Piot,
N. Solyak,
J. C. Thangaraj,
V. Yakovlev
Abstract:
High-power electron beams are sought-after tools in support to a wide array of societal applications. This paper investigates the production of high-power electron beams by combining a high-current field-emission electron source to a superconducting radio-frequency (SRF) cavity. We especially carry out beam-dynamics simulations that demonstrate the viability of the scheme to form $\sim$ 300 kW ave…
▽ More
High-power electron beams are sought-after tools in support to a wide array of societal applications. This paper investigates the production of high-power electron beams by combining a high-current field-emission electron source to a superconducting radio-frequency (SRF) cavity. We especially carry out beam-dynamics simulations that demonstrate the viability of the scheme to form $\sim$ 300 kW average-power electron beam using a 1+1/2-cell SRF gun.
△ Less
Submitted 5 January, 2018;
originally announced January 2018.
-
Status and Opportunities at Project X: A Multi-MW Facility for Intensity Frontier Research
Authors:
S. D. Holmes,
M. Kaducak,
R. Kephart,
I. Kourbanis,
V. Lebedev,
S. Mishra,
S. Nagaitsev,
N. Solyak,
R. Tschirhart
Abstract:
Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility will support programs in elementary particle and nuclear physics, with the potential for broader applications in materials and energy research. Project X is in the development stage with a R&D program focused on front end and superconducting RF ac…
▽ More
Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility will support programs in elementary particle and nuclear physics, with the potential for broader applications in materials and energy research. Project X is in the development stage with a R&D program focused on front end and superconducting RF acceleration technologies, and with design concepts for a staged implementation. This paper will review the status of the Project X conceptual development and the associated R&D programs.
△ Less
Submitted 19 September, 2014;
originally announced September 2014.
-
The Project-x Injector Experiment: A Novel High Performance Front-end For A Future High Power Proton Facility At Fermilab
Authors:
S. Nagaitsev,
S. Holmes,
D. Johnson,
M. Kaducak,
R. Kephart,
V. Lebedev,
S. Mishra,
A. Shemyakin,
N. Solyak,
R. Stanek,
V. Yakovlev,
P. Ostroumov,
D. Li,
P. Singh,
M. Pande,
S. Malhotra
Abstract:
A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program…
▽ More
A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. PXIE is currently under construction at Fermilab and will be completed over the period FY12-17. PXIE will include an H- ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.
△ Less
Submitted 18 September, 2014;
originally announced September 2014.
-
Fermilab experience of post-annealing losses in SRF niobium cavities due to furnace contamination and the ways to its mitigation: a pathway to processing simplification and quality factor improvement
Authors:
A. Grassellino,
A. Romanenko,
A. Crawford,
O. Melnychuk,
A. Rowe,
M. Wong,
C. Cooper,
D. Sergatskov,
D. Bice,
Y. Trenikhina,
L. D. Cooley,
C. Ginsburg,
R. D. Kephart
Abstract:
We investigate the effect of high temperature treatments followed by only high-pressure water rinse (HPR) of superconducting radio frequency (SRF) niobium cavities. The objective is to provide a cost effective alternative to the typical cavity processing sequence, by eliminating the material removal step post furnace treatment while preserving or improving the RF performance. The studies have been…
▽ More
We investigate the effect of high temperature treatments followed by only high-pressure water rinse (HPR) of superconducting radio frequency (SRF) niobium cavities. The objective is to provide a cost effective alternative to the typical cavity processing sequence, by eliminating the material removal step post furnace treatment while preserving or improving the RF performance. The studies have been conducted in the temperature range 800-1000C for different conditions of the starting substrate: large grain and fine grain, electro-polished (EP) and centrifugal barrel polished (CBP) to mirror finish. An interesting effect of the grain size on the performances is found. Cavity results and samples characterization show that furnace contaminants cause poor cavity performance, and a practical solution is found to prevent surface contamination. Extraordinary values of residual resistances ~ 1 nOhm and below are then consistently achieved for the contamination-free cavities. These results lead to a more cost-effective processing and improved RF performance, and, in conjunction with CBP, open a potential pathway to acid-free processing.
△ Less
Submitted 16 May, 2013; v1 submitted 9 May, 2013;
originally announced May 2013.
-
PXIE: Project X Injector Experiment
Authors:
P. N. Ostroumov,
S. D. Holmes,
R. D. Kephart,
J. S. Kerby,
V. A. Lebedev,
C. S. Mishra,
S. Nagaitsev,
A. V. Shemyakin,
N. Solyak,
R. P. Stanek,
D. Li
Abstract:
A multi-MW proton facility, Project X has been proposed and is currently under development at Fermilab. As part of this development program, we are constructing a prototype of the front end of the Project X linac at Fermilab. The construction and successful operations of this facility will validate the concept for the Project X front end, thereby minimizing the primary technical risk element withi…
▽ More
A multi-MW proton facility, Project X has been proposed and is currently under development at Fermilab. As part of this development program, we are constructing a prototype of the front end of the Project X linac at Fermilab. The construction and successful operations of this facility will validate the concept for the Project X front end, thereby minimizing the primary technical risk element within the Project. The Project X Injector Experiment (PXIE) can be constructed over the period FY12-16 and will include an H- ion source, a CW 2.1-MeV RFQ and two SC cryomodules providing up to 30 MeV energy gain at an average beam current of 1 mA. Successful operations of the facility will demonstrate the viability of novel front end technologies that will find applications beyond Project X in the longer term.
△ Less
Submitted 30 January, 2013;
originally announced January 2013.
-
Project X functional requirements specification
Authors:
The Project X Collaboration,
S. D. Holmes,
S. D. Henderson,
R. Kephart,
J. Kerby,
I. Kourbanis,
V. Lebedev,
S. Mishra,
S. Nagaitsev,
N. Solyak,
R. Tschirhart
Abstract:
Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Projec…
▽ More
Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.
△ Less
Submitted 14 May, 2012;
originally announced May 2012.
-
Project X functional requirements specification
Authors:
S. D. Holmes,
S. D. Henderson,
R. Kephart,
J. Kerby,
S. Mishra,
S. Nagaitsev,
R. Tschirhart
Abstract:
Project X is a multi-megawatt proton facility being developed to support intensity frontier research in elementary particle physics, with possible applications to nuclear physics and nuclear energy research, at Fermilab. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions. This paper w…
▽ More
Project X is a multi-megawatt proton facility being developed to support intensity frontier research in elementary particle physics, with possible applications to nuclear physics and nuclear energy research, at Fermilab. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions. This paper will describe the Functional Requirements for the Project X facility and the rationale for these requirements.
△ Less
Submitted 17 February, 2012;
originally announced February 2012.