Development of a real-time beam profile monitor for GeV photons and its application in accelerator facilities
Authors:
Ryoko Kino,
Sho Nagao,
Takeru Akiyama,
Hiroyuki Fujioka,
Tomomasa Fujiwara,
Tatsuhiro Ishige,
Kosuke Itabashi,
Shunsuke Kajikawa,
Masashi Kaneta,
Masaya Mizuno,
Satoshi N. Nakamura,
Kotaro Nishi,
Ken Nishida,
Kazuki Okuyama,
Fumiya Oura,
Koga Tachibana,
Yuichi Toyama,
Daigo Watanabe
Abstract:
A real-time beam profile monitoring system is proposed for GeV photon beams at the BM4 beamline of the Mikamine site, Research Center for Accelerator and Radioisotope Science (RARiS; previously known as ELPH) at Tohoku University. This monitoring system enhances the capability to monitor the entire beamline by incorporating newly developed beam profile monitors (BPMs) for upstream and midstream se…
▽ More
A real-time beam profile monitoring system is proposed for GeV photon beams at the BM4 beamline of the Mikamine site, Research Center for Accelerator and Radioisotope Science (RARiS; previously known as ELPH) at Tohoku University. This monitoring system enhances the capability to monitor the entire beamline by incorporating newly developed beam profile monitors (BPMs) for upstream and midstream sections, in addition to the existing high-speed BPM used for downstream monitoring. This paper reports on the detection mechanisms of the newly developed BPMs and the actual measurement results obtained using the integrated beam monitoring system. The new BPMs are composed of plastic scintillation fibers and silicon photomultipliers, enabling high-precision, real-time measurements. Data acquisition utilizes streaming TDC, a firmware commonly employed in the J-PARC Hadron-hall, allowing real-time detection of high-intensity photon beams with count rates reaching several tens of MHz. With sufficient statistical data, the BPM achieved a 1-s beam-profiling accuracy of 10 μm. The proposed BPM system serves as a valuable resource for future physics experiments at the BM4 photon beamline and will significantly contribute to ongoing accelerator research endeavors.
△ Less
Submitted 2 November, 2024; v1 submitted 28 May, 2024;
originally announced May 2024.
Data acquisition system in Run-0a for the J-PARC E16 experiment
Authors:
Tomonori Takahashi,
Kazuya Aoki,
Sakiko Ashikaga,
Wen-Chen Chang,
Eitaro Hamada,
Ryotaro Honda,
Masaya Ichikawa,
Masahiro Ikeno,
Shunsuke Kajikawa,
Koki Kanno,
Daisuke Kawama,
Takehito Kondo,
Che-Sheng Lin,
Chih-Hsun Lin,
Yuhei Morino,
Tomoki Murakami,
Wataru Nakai,
Satomi Nakasuga,
Megumi Naruki,
Yuki Obara,
Kyoichiro Ozawa,
Hiroyuki Sako,
Susumu Sato,
Hiroshi Sendai,
Kazuki Suzuki
, et al. (4 additional authors not shown)
Abstract:
J-PARC E16 is an experiment to examine the origin of hadron mass through a systematic measurement of spectral changes of vector mesons in nuclei. The measurement of $e^{+}e^{-}$ pairs from the decay of vector mesons will provide the information of the partial restoration of the chiral symmetry in a normal nuclear density. To resolve a pulse pile-up and achieve good discrimination of $e^{\pm}$ from…
▽ More
J-PARC E16 is an experiment to examine the origin of hadron mass through a systematic measurement of spectral changes of vector mesons in nuclei. The measurement of $e^{+}e^{-}$ pairs from the decay of vector mesons will provide the information of the partial restoration of the chiral symmetry in a normal nuclear density. To resolve a pulse pile-up and achieve good discrimination of $e^{\pm}$ from the background of a reaction rate of an order of 10 MHz, the data acquisition (DAQ) system uses waveform sampling chips of APV25 and DRS4. The trigger rate and data rate are expected to be 1 kHz and 130--330 MiB/s, respectively. The DAQ system for readout of APV25 and DRS4 were developed, where events were synchronized by common trigger and tag data. The first commissioning in beam, called Run-0a, was performed in June 2020 with about 1/4 of the designed setup. The DAQ worked with a trigger rate of 300 Hz in the Run-0a and the main bottleneck was a large data size of APV25. Further optimization of the DAQ system will improve the performance.
△ Less
Submitted 31 October, 2020;
originally announced November 2020.