Skip to main content

Showing 1–19 of 19 results for author: Hanna, B

Searching in archive physics. Search in all archives.
.
  1. arXiv:2411.17096  [pdf

    physics.acc-ph

    Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat

    Authors: A. Sukhanov, C. Contreras-Martinez, C. Grimm, B. Hanna, B. Hansen, T. Khabiboulline, M. Parise, D. Passarelli, Y. Pischalnikov, D. Porwisiak, V. Roger, J. Subedi, A. Syed, P. Varghese, S. Wijethunga, V. Yakovlev

    Abstract: As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qua… ▽ More

    Submitted 25 November, 2024; originally announced November 2024.

    Comments: 32nd Linear Accelerator Conference (LINAC 2024)

    Report number: FERMILAB-CONF-24-0250-TD

  2. arXiv:2209.01283  [pdf

    physics.acc-ph

    Design, Manufacturing, Assembly, Testing, And Lessons Learned Of The Prototype 650 Mhz Couplers

    Authors: J. Helsper, S. Chandrasekaran, N. Solyak, S. Kazakov, K. Premo, G. Wu, F. Furuta, J. Ozelis, B. Hanna

    Abstract: Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning, and the lessons learned at each stage.

    Submitted 2 September, 2022; originally announced September 2022.

    Report number: FERMILAB-CONF-22-641-TD

  3. arXiv:2209.01227  [pdf

    physics.acc-ph

    Experience With Machine Protection Systems At PIP2IT

    Authors: PIP-II Collaboration, :, A. Warner, M. Austin, L. Carmichael, J. -P. Carneiro, B. Hanna, E. Harms, R. Neswold, L. Prost, R. Rivera, A. Shemyakin, M. Ibrahim, J. Wu

    Abstract: The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H$-$ beam to 16 MeV. To protect elements of the beam line, a Machine Protection System MPS was implemented and commissioned. T… ▽ More

    Submitted 8 September, 2022; v1 submitted 2 September, 2022; originally announced September 2022.

    Comments: 11th International Beam Instrumentation Conference (IBIC 2022)

    Report number: FERMILAB-CONF-22-644-AD-PPD-SCD

  4. arXiv:2208.11753  [pdf, other

    physics.acc-ph

    Beam Dynamics Studies at the PIP-II Injector Test Facility

    Authors: J. -P. Carneiro, B. Hanna, E. Podzeyev, L. Prost, A. Saini, A. Shemyakin

    Abstract: A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules… ▽ More

    Submitted 24 August, 2022; originally announced August 2022.

    Report number: FERMILAB-CONF-22-630-AD-PIP2

  5. arXiv:1912.03291  [pdf

    physics.acc-ph

    Measurements of a 2.1 MeV H$^-$ beam with an Allison scanner

    Authors: C. Richard, J. -P. Carneiro, B. Hanna, L. Prost, A. Saini, V. Scarpine, A. Shemyakin

    Abstract: Transverse 2D phase space distribution of a 2.1 MeV, 5 mA H$^-$ beam is measured at the PIPIT test accelerator at Fermilab with an Allison scanner. The paper describes the design, calibration, and performance of the scanner as well as the main results of the beam measurements. Analyses of the recorded phase portraits are performed primarily in action-phase coordinates; the stability of the action… ▽ More

    Submitted 6 December, 2019; originally announced December 2019.

  6. arXiv:1912.03180  [pdf

    physics.acc-ph

    Experience with Long-pulse Operation of the PIP2IT Warm Front End

    Authors: A. Shemyakin, J. -P. Carneiro, A. Chen, D. Frolov, B. Hanna, R. Neswold, L. Prost, G. Saewert, A. Saini, V. Scarpine, A. Warner, J. -Y. Wu, C. Richard

    Abstract: The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the prop… ▽ More

    Submitted 6 December, 2019; originally announced December 2019.

    Comments: 4 pages, NAPAC2019

    Report number: FERMILAB-CONF-19-439-AD

  7. arXiv:1808.08283  [pdf

    physics.acc-ph

    Experimental Study of Beam Dynamics In The PIP-II MEBT Prototype

    Authors: A. Shemyakin, J. -P. Carneiro, B. Hanna, V. Lebedev, L. Prost, A. Saini, V. Scarpine, V. L. S. Sista, C. Richard

    Abstract: The Proton Improvement Plan, Stage Two (PIP-II) is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototype of the PIP-II linac front end called PIP-II Injector Test (PIP2IT) is being built at Fermilab. As of now, a 15 mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a… ▽ More

    Submitted 24 August, 2018; originally announced August 2018.

    Comments: 6 pp

    Report number: Fermilab-Conf-18-228-AD

  8. arXiv:1806.05708  [pdf

    physics.acc-ph

    PIP-II Injector Test Warm Front End: Commissioning Update

    Authors: L. Prost, R. Andrews, C. Baffes, J. -P. Carneiro, B. Chase, A. Chen, E. Cullerton, P. F. Derwent, J. P. Edelen, J. Einstein-Curtis, D. Frolov, B. Hanna, D. Peterson, G. Saewert, A. Saini, V. Scarpine, A. Shemyakin, J. Steimel, D. Sun, A. Warner, C. Richard, V. L. S. Sista

    Abstract: The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status,… ▽ More

    Submitted 14 June, 2018; originally announced June 2018.

    Comments: 4 pp

    Report number: Fermilab-Conf-18-017-AD

  9. arXiv:1803.08940  [pdf

    physics.acc-ph

    Status of the warm front end of PIP-II injector test

    Authors: A. Shemyakin, M. Alvarez, R. Andrews, C. Baffes, J. -P. Carneiro, A. Chen, P. F. Derwent, J. P. Edelen, D. Frolov, B. Hanna, L. Prost, A. Saini, G. Saewert, V. Scarpine, V. L. S. Sista, J. Steimel, D. Sun, A. Warner

    Abstract: The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam T… ▽ More

    Submitted 23 March, 2018; originally announced March 2018.

    Comments: 4 pp. 8th International Particle Accelerator Conference (IPAC 2017) 14-19 May 2017. Copenhagen, Denmark

    Report number: Fermilab-Conf-17-146-AD

  10. arXiv:1710.09105  [pdf

    physics.flu-dyn

    Coarse-Grid Computational Fluid Dynamic (CG-CFD) Error Prediction using Machine Learning

    Authors: Botros N Hanna, Nam T. Dinh, Robert W. Youngblood, Igor A. Bolotnov

    Abstract: Despite the progress in high performance computing, Computational Fluid Dynamics (CFD) simulations are still computationally expensive for many practical engineering applications such as simulating large computational domains and highly turbulent flows. One of the major reasons of the high expense of CFD is the need for a fine grid to resolve phenomena at the relevant scale, and obtain a grid-inde… ▽ More

    Submitted 25 October, 2017; originally announced October 2017.

    Comments: WORKING PAPER (Submitted to Journal of Fluids Engineering, October 2017)

  11. arXiv:1709.07516  [pdf

    physics.acc-ph

    Characterization of the beam from the RFQ of the PIP-II Injector Test

    Authors: A. Shemyakin, J. -P. Carneiro, B. Hanna, L. Prost, A. Saini, V. Scarpine, V. L. S. Sista, J. Steimel

    Abstract: A 2.1 MeV, 10 mA CW RFQ has been installed and commissioned at Fermilab's test accelerator known as PIP-II Injector Test. This report describes the measurements of the beam properties after acceleration in the RFQ, including the energy and emittance.

    Submitted 21 September, 2017; originally announced September 2017.

    Comments: 4 pp. Submitted to IPAC 2017

    Report number: Fermilab-Conf-17-147-AD

  12. arXiv:1704.08744  [pdf

    physics.acc-ph

    PIP-II Injector Test's Low Energy Beam Transport: Commissioning and Selected Measurements

    Authors: A. Shemyakin, M. Alvarez, R. Andrews, J. -P. Carneiro, A. Chen, R. D'Arcy, B. Hanna, L. Prost, V. Scarpine, C. Wiesner

    Abstract: The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the LEBT design and summarizes the outcome of the commissioning activities.

    Submitted 27 April, 2017; originally announced April 2017.

    Comments: 11 p

    Report number: Fermilab-Conf-16-350-AD

  13. arXiv:1701.01078  [pdf

    physics.acc-ph

    Installation Progress At The PIP-II Injector Test At Fermilab

    Authors: C. Baffes, M. Alvarez, R. Andrews, A. Chen, J. Czajkowski, P. Derwent, J. Edelen, B. Hanna, B. Hartsell, K. Kendziora, D. Mitchell, L. Prost, V. Scarpine, A. Shemyakin, J. Steimel, T. Zuchnik, A. Edelen

    Abstract: A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadr… ▽ More

    Submitted 4 January, 2017; originally announced January 2017.

    Comments: 4 pp

    Report number: Fermilab-Conf-16-434-AD

  14. arXiv:1511.01479  [pdf

    physics.acc-ph

    Pxie low energy beam transport commissioning

    Authors: L. Prost, M. Alvarez, R. Andrews, J. -P. Carneiro, B. Hanna, V. Scarpine, A. Shemyakin, R. D'Arcy, C. Wiesner

    Abstract: The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator (a.k.a. PXIE) is under construction. It includes a 10 mA DC, 30 KeV H- ion source, a 2 m-long Low Energy Beam Transport (… ▽ More

    Submitted 4 November, 2015; originally announced November 2015.

    Comments: 3 pp

    Report number: FERMILAB-CONF-15-176-AD

  15. arXiv:1502.01703  [pdf

    physics.acc-ph

    Status of the warm front end of PXIE

    Authors: A. Shemyakin, M. Alvarez, R. Andrews, C. Baffes, A. Chen, B. Hanna, L. Prost, G. Saewert, V. Scarpine, J. Steimel, D. Sun, D. Li, R. D'Arcy

    Abstract: A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creati… ▽ More

    Submitted 5 February, 2015; originally announced February 2015.

    Comments: 3 pp

    Report number: FERMILAB-CONF-14-301-AD

  16. arXiv:1301.7698  [pdf

    physics.acc-ph

    Design of MEBT for the Project X Injector Experiment at Fermilab

    Authors: A. Shemyakin, C. Baffes, A. Chen, Y. Eidelman, B. Hanna, V. Lebedev, S. Nagaitsev, J. -F. Ostiguy, R. Pasquinelli, D. Peterson, L. Prost, G. Saewert, V. Scarpine, B. Shteynas, N. Solyak, D. Sun, M. Wendt, V. Yakovlev, T. Tang

    Abstract: The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary selected bunch pattern from the initially 5 mA 162.5 MHz CW train. The bunch selection will be made in the Medium Energy Beam Transport (MEBT) at 2.1 MeV by divert… ▽ More

    Submitted 31 January, 2013; originally announced January 2013.

    Comments: 3 pp

    Report number: FERMILAB-CONF-12-496-AD-APC-TD

  17. arXiv:1301.7039  [pdf

    physics.acc-ph

    The Six-Cavity Test - Demonstrated Acceleration of Beam with Multiple RF Cavities and a Single Klystron

    Authors: J. Steimel, J. -P. Carneiro, B. Chase, E. Cullerton, B. M. Hanna, R. L. Madrak, R. J. Pasquinelli, L. R. Prost, L. Ristori, V. E. Scarpine, P. Varghese, R. C. Webber, D. Wildman

    Abstract: The High Intensity Neutrino Source (HINS) Six-Cavity Test has demonstrated the use of high power RF vector modulators to control multiple RF cavities driven by a single high power klystron to accelerate a non-relativistic beam. Installation of 6 cavities in the existing HINS beamline has been completed and beam measurements have started. We present data showing the energy stability of the 7 mA pro… ▽ More

    Submitted 29 January, 2013; originally announced January 2013.

    Comments: 3 pp. 3rd International Particle Accelerator Conference (IPAC 2012) 20-25 May 2012, New Orleans, Louisiana

    Report number: FERMILAB-CONF-12-216-AD

  18. arXiv:1301.6774  [pdf

    physics.acc-ph

    Fermilab PXIE Beam Diagnostics Development and Testing at the HINS Beam Facility

    Authors: V. A. Lebedev, A. V. Shemyakin, J. Steimel, M. Wendt, B. M. Hanna, L. R. Prost, V. E. Scarpine

    Abstract: Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw RFQ and H- source, a broadband bunch-by-bunch beam chopper and a low-energy superconducting linac. The successful characterization and operation of such an acce… ▽ More

    Submitted 28 January, 2013; originally announced January 2013.

    Comments: 3 pp. 3rd International Particle Accelerator Conference (IPAC 2012) 20-25 May 2012, New Orleans, Louisiana

    Report number: FERMILAB-CONF-12-239-AD

  19. arXiv:nlin/0311059  [pdf, ps, other

    nlin.PS physics.optics

    Controlled generation and steering of spatial gap solitons

    Authors: Dragomir Neshev, Andrey A. Sukhorukov, Brendan Hanna, Wieslaw Krolikowski, Yuri S. Kivshar

    Abstract: We demonstrate the first fully controlled generation of immobile and slow spatial gap solitons in nonlinear periodic systems with band-gap spectra, and reveal the key features of gap solitons which distinguish them from conventional counterparts, including a dynamical transformation of gap solitons due to nonlinear inter-band coupling. We also predict theoretically and confirm experimentally the… ▽ More

    Submitted 23 March, 2004; v1 submitted 28 November, 2003; originally announced November 2003.

    Comments: 4 pages, 5 figures

    Journal ref: Phys. Rev. Lett. 93, 083905 (2004)