-
Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat
Authors:
A. Sukhanov,
C. Contreras-Martinez,
C. Grimm,
B. Hanna,
B. Hansen,
T. Khabiboulline,
M. Parise,
D. Passarelli,
Y. Pischalnikov,
D. Porwisiak,
V. Roger,
J. Subedi,
A. Syed,
P. Varghese,
S. Wijethunga,
V. Yakovlev
Abstract:
As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qua…
▽ More
As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.
△ Less
Submitted 25 November, 2024;
originally announced November 2024.
-
Design, Manufacturing, Assembly, Testing, And Lessons Learned Of The Prototype 650 Mhz Couplers
Authors:
J. Helsper,
S. Chandrasekaran,
N. Solyak,
S. Kazakov,
K. Premo,
G. Wu,
F. Furuta,
J. Ozelis,
B. Hanna
Abstract:
Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning, and the lessons learned at each stage.
Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning, and the lessons learned at each stage.
△ Less
Submitted 2 September, 2022;
originally announced September 2022.
-
Experience With Machine Protection Systems At PIP2IT
Authors:
PIP-II Collaboration,
:,
A. Warner,
M. Austin,
L. Carmichael,
J. -P. Carneiro,
B. Hanna,
E. Harms,
R. Neswold,
L. Prost,
R. Rivera,
A. Shemyakin,
M. Ibrahim,
J. Wu
Abstract:
The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H$-$ beam to 16 MeV. To protect elements of the beam line, a Machine Protection System MPS was implemented and commissioned. T…
▽ More
The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H$-$ beam to 16 MeV. To protect elements of the beam line, a Machine Protection System MPS was implemented and commissioned. The beam was interrupted faster than 10$μ$s when excessive beam loss was detected. The paper describes the MPS architecture, methods of the loss detection, procedure of the beam interruption, and operational experience at PIP2IT.
△ Less
Submitted 8 September, 2022; v1 submitted 2 September, 2022;
originally announced September 2022.
-
Beam Dynamics Studies at the PIP-II Injector Test Facility
Authors:
J. -P. Carneiro,
B. Hanna,
E. Podzeyev,
L. Prost,
A. Saini,
A. Shemyakin
Abstract:
A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules…
▽ More
A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules accelerating the beam to 16 MeV and a High-Energy Beam Transport (HEBT) bringing the beam to a dump. This paper presents beam dynamics - related measurements performed at PIP2IT such as the Twiss parameters with Allison scanners, beam envelopes along the injector, and transverse and longitudinal rms emittance reconstruction. These measurements are compared with predictions from the beam dynamics code Tracewin.
△ Less
Submitted 24 August, 2022;
originally announced August 2022.
-
Measurements of a 2.1 MeV H$^-$ beam with an Allison scanner
Authors:
C. Richard,
J. -P. Carneiro,
B. Hanna,
L. Prost,
A. Saini,
V. Scarpine,
A. Shemyakin
Abstract:
Transverse 2D phase space distribution of a 2.1 MeV, 5 mA H$^-$ beam is measured at the PIPIT test accelerator at Fermilab with an Allison scanner. The paper describes the design, calibration, and performance of the scanner as well as the main results of the beam measurements. Analyses of the recorded phase portraits are performed primarily in action-phase coordinates; the stability of the action…
▽ More
Transverse 2D phase space distribution of a 2.1 MeV, 5 mA H$^-$ beam is measured at the PIPIT test accelerator at Fermilab with an Allison scanner. The paper describes the design, calibration, and performance of the scanner as well as the main results of the beam measurements. Analyses of the recorded phase portraits are performed primarily in action-phase coordinates; the stability of the action under linear optics makes it easier to compare measurements taken with different beamline conditions, e.g. in various locations. The intensity of a single measured point (\pixel") is proportional to the phase density in the corresponding portion of the beam. When the Twiss parameters are calculated using only the high-phase density part of the beam, the pixel intensity in the beam core is found to be decreasing exponentially with action and to be phase-independent. Outside of the core, the intensities decrease with action at a significantly slower rate than in the core. This `tail' comprises 10-30% of the beam, with 0.1% of the total measured intensity extending beyond the action 10-20 times larger than the rms emittance. The transition from the core to the tail is accompanied by the appearance of a strong phase dependence, which is characterized in action-phase coordinates by two `branches' extending beyond the core. A set of selected measurements shows, in part, that there is no measurable emittance dilution along the beam line in the main portion of the beam; the beam parameters are practically constant over a 0.5 ms pulse; and scraping in various parts of the beam line is an effective way to decrease the transverse tails by removing the branches.
△ Less
Submitted 6 December, 2019;
originally announced December 2019.
-
Experience with Long-pulse Operation of the PIP2IT Warm Front End
Authors:
A. Shemyakin,
J. -P. Carneiro,
A. Chen,
D. Frolov,
B. Hanna,
R. Neswold,
L. Prost,
G. Saewert,
A. Saini,
V. Scarpine,
A. Warner,
J. -Y. Wu,
C. Richard
Abstract:
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the prop…
▽ More
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the proposed PIP-II accelera-tor, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encoun-tered and some of the solutions that were implemented.
△ Less
Submitted 6 December, 2019;
originally announced December 2019.
-
Experimental Study of Beam Dynamics In The PIP-II MEBT Prototype
Authors:
A. Shemyakin,
J. -P. Carneiro,
B. Hanna,
V. Lebedev,
L. Prost,
A. Saini,
V. Scarpine,
V. L. S. Sista,
C. Richard
Abstract:
The Proton Improvement Plan, Stage Two (PIP-II) is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototype of the PIP-II linac front end called PIP-II Injector Test (PIP2IT) is being built at Fermilab. As of now, a 15 mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a…
▽ More
The Proton Improvement Plan, Stage Two (PIP-II) is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototype of the PIP-II linac front end called PIP-II Injector Test (PIP2IT) is being built at Fermilab. As of now, a 15 mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a 10 m Medium Energy Beam Transport (MEBT) have been assembled and commissioned. The MEBT bunch-by-bunch chopping system and the requirement of a low uncontrolled beam loss put stringent limitations on the beam envelope and its variation. Measurements of transverse and longitudinal beam dynamics in the MEBT were performed in the range of 1-10 mA of the RFQ beam current. Almost all measurements are made with 10 μs beam pulses in order to avoid damage to the beam line. This report presents measurements of the transverse optics with differential trajectories, reconstruction of the beam envelope with scrapers and an Allison emittance scanner, as well as bunch length measurements with a Fast Faraday Cup.
△ Less
Submitted 24 August, 2018;
originally announced August 2018.
-
PIP-II Injector Test Warm Front End: Commissioning Update
Authors:
L. Prost,
R. Andrews,
C. Baffes,
J. -P. Carneiro,
B. Chase,
A. Chen,
E. Cullerton,
P. F. Derwent,
J. P. Edelen,
J. Einstein-Curtis,
D. Frolov,
B. Hanna,
D. Peterson,
G. Saewert,
A. Saini,
V. Scarpine,
A. Shemyakin,
J. Steimel,
D. Sun,
A. Warner,
C. Richard,
V. L. S. Sista
Abstract:
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status,…
▽ More
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.
△ Less
Submitted 14 June, 2018;
originally announced June 2018.
-
Status of the warm front end of PIP-II injector test
Authors:
A. Shemyakin,
M. Alvarez,
R. Andrews,
C. Baffes,
J. -P. Carneiro,
A. Chen,
P. F. Derwent,
J. P. Edelen,
D. Frolov,
B. Hanna,
L. Prost,
A. Saini,
G. Saewert,
V. Scarpine,
V. L. S. Sista,
J. Steimel,
D. Sun,
A. Warner
Abstract:
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam T…
▽ More
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CWRFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the warm front end.
△ Less
Submitted 23 March, 2018;
originally announced March 2018.
-
Coarse-Grid Computational Fluid Dynamic (CG-CFD) Error Prediction using Machine Learning
Authors:
Botros N Hanna,
Nam T. Dinh,
Robert W. Youngblood,
Igor A. Bolotnov
Abstract:
Despite the progress in high performance computing, Computational Fluid Dynamics (CFD) simulations are still computationally expensive for many practical engineering applications such as simulating large computational domains and highly turbulent flows. One of the major reasons of the high expense of CFD is the need for a fine grid to resolve phenomena at the relevant scale, and obtain a grid-inde…
▽ More
Despite the progress in high performance computing, Computational Fluid Dynamics (CFD) simulations are still computationally expensive for many practical engineering applications such as simulating large computational domains and highly turbulent flows. One of the major reasons of the high expense of CFD is the need for a fine grid to resolve phenomena at the relevant scale, and obtain a grid-independent solution. The fine grid requirements often drive the computational time step size down, which makes long transient problems prohibitively expensive. In the research presented, the feasibility of a Coarse Grid CFD (CG-CFD) approach is investigated by utilizing Machine Learning (ML) algorithms. Relying on coarse grids increases the discretization error. Hence, a method is suggested to produce a surrogate model that predicts the CG-CFD local errors to correct the variables of interest. Given high-fidelity data, a surrogate model is trained to predict the CG-CFD local errors as a function of the coarse grid local features. ML regression algorithms are utilized to construct a surrogate model that relates the local error and the coarse grid features. This method is applied to a three-dimensional flow in a lid driven cubic cavity domain. The performance of the method was assessed by training the surrogate model on the flow full field spatial data and tested on new data (from flows of different Reynolds number and/or computed by different grid sizes). The proposed method maximizes the benefit of the available data and shows potential for a good predictive capability.
△ Less
Submitted 25 October, 2017;
originally announced October 2017.
-
Characterization of the beam from the RFQ of the PIP-II Injector Test
Authors:
A. Shemyakin,
J. -P. Carneiro,
B. Hanna,
L. Prost,
A. Saini,
V. Scarpine,
V. L. S. Sista,
J. Steimel
Abstract:
A 2.1 MeV, 10 mA CW RFQ has been installed and commissioned at Fermilab's test accelerator known as PIP-II Injector Test. This report describes the measurements of the beam properties after acceleration in the RFQ, including the energy and emittance.
A 2.1 MeV, 10 mA CW RFQ has been installed and commissioned at Fermilab's test accelerator known as PIP-II Injector Test. This report describes the measurements of the beam properties after acceleration in the RFQ, including the energy and emittance.
△ Less
Submitted 21 September, 2017;
originally announced September 2017.
-
PIP-II Injector Test's Low Energy Beam Transport: Commissioning and Selected Measurements
Authors:
A. Shemyakin,
M. Alvarez,
R. Andrews,
J. -P. Carneiro,
A. Chen,
R. D'Arcy,
B. Hanna,
L. Prost,
V. Scarpine,
C. Wiesner
Abstract:
The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the LEBT design and summarizes the outcome of the commissioning activities.
The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the LEBT design and summarizes the outcome of the commissioning activities.
△ Less
Submitted 27 April, 2017;
originally announced April 2017.
-
Installation Progress At The PIP-II Injector Test At Fermilab
Authors:
C. Baffes,
M. Alvarez,
R. Andrews,
A. Chen,
J. Czajkowski,
P. Derwent,
J. Edelen,
B. Hanna,
B. Hartsell,
K. Kendziora,
D. Mitchell,
L. Prost,
V. Scarpine,
A. Shemyakin,
J. Steimel,
T. Zuchnik,
A. Edelen
Abstract:
A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadr…
▽ More
A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadrupole (RFQ) capable of operation in Continuous Wave (CW) mode, and a 10 m-long Medium Energy Beam Transport (MEBT). The paper will report on the installation of the RFQ and the first sections of the MEBT and related mechanical design considerations.
△ Less
Submitted 4 January, 2017;
originally announced January 2017.
-
Pxie low energy beam transport commissioning
Authors:
L. Prost,
M. Alvarez,
R. Andrews,
J. -P. Carneiro,
B. Hanna,
V. Scarpine,
A. Shemyakin,
R. D'Arcy,
C. Wiesner
Abstract:
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator (a.k.a. PXIE) is under construction. It includes a 10 mA DC, 30 KeV H- ion source, a 2 m-long Low Energy Beam Transport (…
▽ More
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator (a.k.a. PXIE) is under construction. It includes a 10 mA DC, 30 KeV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to ~25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source and LEBT, which includes 3 solenoids, several clearing electrodes/collimators and a chopping system, have been built, installed, and commissioned to full specification parameters. This report presents the outcome of our commissioning activities, including phase-space measurements at the end of the beam line under various neutralization schemes obtained by changing the electrodes' biases and chopper parameters.
△ Less
Submitted 4 November, 2015;
originally announced November 2015.
-
Status of the warm front end of PXIE
Authors:
A. Shemyakin,
M. Alvarez,
R. Andrews,
C. Baffes,
A. Chen,
B. Hanna,
L. Prost,
G. Saewert,
V. Scarpine,
J. Steimel,
D. Sun,
D. Li,
R. D'Arcy
Abstract:
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creati…
▽ More
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chopping system.
△ Less
Submitted 5 February, 2015;
originally announced February 2015.
-
Design of MEBT for the Project X Injector Experiment at Fermilab
Authors:
A. Shemyakin,
C. Baffes,
A. Chen,
Y. Eidelman,
B. Hanna,
V. Lebedev,
S. Nagaitsev,
J. -F. Ostiguy,
R. Pasquinelli,
D. Peterson,
L. Prost,
G. Saewert,
V. Scarpine,
B. Shteynas,
N. Solyak,
D. Sun,
M. Wendt,
V. Yakovlev,
T. Tang
Abstract:
The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary selected bunch pattern from the initially 5 mA 162.5 MHz CW train. The bunch selection will be made in the Medium Energy Beam Transport (MEBT) at 2.1 MeV by divert…
▽ More
The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary selected bunch pattern from the initially 5 mA 162.5 MHz CW train. The bunch selection will be made in the Medium Energy Beam Transport (MEBT) at 2.1 MeV by diverting undesired bunches to an absorber. This paper presents the MEBT scheme and describes development of its elements, including the kickers and absorber.
△ Less
Submitted 31 January, 2013;
originally announced January 2013.
-
The Six-Cavity Test - Demonstrated Acceleration of Beam with Multiple RF Cavities and a Single Klystron
Authors:
J. Steimel,
J. -P. Carneiro,
B. Chase,
E. Cullerton,
B. M. Hanna,
R. L. Madrak,
R. J. Pasquinelli,
L. R. Prost,
L. Ristori,
V. E. Scarpine,
P. Varghese,
R. C. Webber,
D. Wildman
Abstract:
The High Intensity Neutrino Source (HINS) Six-Cavity Test has demonstrated the use of high power RF vector modulators to control multiple RF cavities driven by a single high power klystron to accelerate a non-relativistic beam. Installation of 6 cavities in the existing HINS beamline has been completed and beam measurements have started. We present data showing the energy stability of the 7 mA pro…
▽ More
The High Intensity Neutrino Source (HINS) Six-Cavity Test has demonstrated the use of high power RF vector modulators to control multiple RF cavities driven by a single high power klystron to accelerate a non-relativistic beam. Installation of 6 cavities in the existing HINS beamline has been completed and beam measurements have started. We present data showing the energy stability of the 7 mA proton beam accelerated through the six cavities from 2.5 MeV to 3.4 MeV.
△ Less
Submitted 29 January, 2013;
originally announced January 2013.
-
Fermilab PXIE Beam Diagnostics Development and Testing at the HINS Beam Facility
Authors:
V. A. Lebedev,
A. V. Shemyakin,
J. Steimel,
M. Wendt,
B. M. Hanna,
L. R. Prost,
V. E. Scarpine
Abstract:
Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw RFQ and H- source, a broadband bunch-by-bunch beam chopper and a low-energy superconducting linac. The successful characterization and operation of such an acce…
▽ More
Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw RFQ and H- source, a broadband bunch-by-bunch beam chopper and a low-energy superconducting linac. The successful characterization and operation of such an accelerator places stringent requirements on beam line diagnostics. These crucial beam measurements include bunch currents, beam orbit, beam phase, bunch length, transverse profile and emittance, beam halo and tails, as well as the extinction performance of the broadband chopper. This paper presents PXIE beam measurement requirements and instrumentation development plans. Also presented are plans to test many of these instruments at the Fermilab High Intensity Neutrino Source (HINS) beam facility. Since HINS is already an operational accelerator, utilizing HINS for instrumentation testing allows for quicker development of the required PXIE diagnostics.
△ Less
Submitted 28 January, 2013;
originally announced January 2013.
-
Controlled generation and steering of spatial gap solitons
Authors:
Dragomir Neshev,
Andrey A. Sukhorukov,
Brendan Hanna,
Wieslaw Krolikowski,
Yuri S. Kivshar
Abstract:
We demonstrate the first fully controlled generation of immobile and slow spatial gap solitons in nonlinear periodic systems with band-gap spectra, and reveal the key features of gap solitons which distinguish them from conventional counterparts, including a dynamical transformation of gap solitons due to nonlinear inter-band coupling. We also predict theoretically and confirm experimentally the…
▽ More
We demonstrate the first fully controlled generation of immobile and slow spatial gap solitons in nonlinear periodic systems with band-gap spectra, and reveal the key features of gap solitons which distinguish them from conventional counterparts, including a dynamical transformation of gap solitons due to nonlinear inter-band coupling. We also predict theoretically and confirm experimentally the effect of anomalous steering of gap solitons in optically-induced photonic lattices.
△ Less
Submitted 23 March, 2004; v1 submitted 28 November, 2003;
originally announced November 2003.