-
Operation of the CESR-TA vertical beam size monitor at $E_{\rm b}$=4 GeV
Authors:
J. P. Alexander,
C. Conolly,
E. Edwards,
J. W. Flanagan,
E. Fontes,
B. K. Heltsley,
A. Lyndaker,
D. P. Peterson,
N. T. Rider,
D. L. Rubin,
R. Seeley,
J. Shanks
Abstract:
We describe operation of the CESR-TA vertical beam size monitor (xBSM) with $e^\pm$ beams with $E_{\rm b}$=4 GeV. The xBSM measures vertical beam size by imaging synchrotron radiation x-rays through an optical element onto a detector array of 32 InGaAs photodiodes with 50 $μ$m pitch. The device has previously been successfully used to measure vertical beam sizes of 10-100 $μ$m on a bunch-by-bunch,…
▽ More
We describe operation of the CESR-TA vertical beam size monitor (xBSM) with $e^\pm$ beams with $E_{\rm b}$=4 GeV. The xBSM measures vertical beam size by imaging synchrotron radiation x-rays through an optical element onto a detector array of 32 InGaAs photodiodes with 50 $μ$m pitch. The device has previously been successfully used to measure vertical beam sizes of 10-100 $μ$m on a bunch-by-bunch, turn-by-turn basis at $e^\pm$ beam energies of $\sim$2 GeV and source magnetic fields below 2.8 kG, for which the detector required calibration for incident x-rays of 1-5 keV. At $E_{\rm b}=4.0$ GeV and $B$=4.5 kG, however, the incident synchrotron radiation spectrum extends to $\sim$20 keV, requiring calibration of detector response in that regime. Such a calibration is described and then used to analyze data taken with several different thicknesses of filters in front of the detector. We obtain a relative precision of better than 4% on beam size measurement from 15-100 $μ$m over several different ranges of x-ray energy, including both 1-12 keV and 6-17 keV. The response of an identical detector, but tilted vertically by 60$^\circ$ in order to increase magnfication without a longer beamline, is measured and shown to improve x-ray detection above 4 keV without compromising sensitivity to beam size. We also investigate operation of a coded aperture using gold masking backed by synthetic diamond.
△ Less
Submitted 5 August, 2015; v1 submitted 9 July, 2015;
originally announced July 2015.
-
Design and performance of coded aperture optical elements for the CESR-TA x-ray beam size monitor
Authors:
J. P. Alexander,
A. Chatterjee,
C. Conolly,
E. Edwards,
M. P. Ehrlichman,
J. W. Flanagan,
E. Fontes,
B. K. Heltsley,
A. Lyndaker,
D. P. Peterson,
N. T. Rider,
D. L. Rubin,
R. Seeley,
J. Shanks
Abstract:
We describe the design and performance of optical elements for an x-ray beam size monitor (xBSM), a device measuring $e^+$ and $e^-$ beam sizes in the CESR-TA storage ring. The device can measure vertical beam sizes of $10-100~μ$m on a turn-by-turn, bunch-by-bunch basis at $e^\pm$ beam energies of $\sim2-5~$GeV. X-rays produced by a hard-bend magnet pass through a single- or multiple-slit (coded a…
▽ More
We describe the design and performance of optical elements for an x-ray beam size monitor (xBSM), a device measuring $e^+$ and $e^-$ beam sizes in the CESR-TA storage ring. The device can measure vertical beam sizes of $10-100~μ$m on a turn-by-turn, bunch-by-bunch basis at $e^\pm$ beam energies of $\sim2-5~$GeV. X-rays produced by a hard-bend magnet pass through a single- or multiple-slit (coded aperture) optical element onto a detector. The coded aperture slit pattern and thickness of masking material forming that pattern can both be tuned for optimal resolving power. We describe several such optical elements and show how well predictions of simple models track measured performances.
△ Less
Submitted 14 August, 2014;
originally announced August 2014.
-
Vertical beam size measurement in the CESR-TA $e^+e^-$ storage ring using x-rays from synchrotron radiation
Authors:
J. P. Alexander,
A. Chatterjee,
C. Conolly,
E. Edwards,
M. P. Ehrlichman,
E. Fontes,
B. K. Heltsley,
W. Hopkins,
A. Lyndaker,
D. P. Peterson,
N. T. Rider,
D. L. Rubin,
J. Savino,
R. Seeley,
J. Shanks,
J. W. Flanagan
Abstract:
We describe the construction and operation of an x-ray beam size monitor (xBSM), a device measuring $e^+$ and $e^-$ beam sizes in the CESR-TA storage ring using synchrotron radiation. The device can measure vertical beam sizes of $10-100~μ$m on a turn-by-turn, bunch-by-bunch basis at $e^\pm$ beam energies of $\sim2~$GeV. At such beam energies the xBSM images x-rays of $ε\approx$1-10$~$keV (…
▽ More
We describe the construction and operation of an x-ray beam size monitor (xBSM), a device measuring $e^+$ and $e^-$ beam sizes in the CESR-TA storage ring using synchrotron radiation. The device can measure vertical beam sizes of $10-100~μ$m on a turn-by-turn, bunch-by-bunch basis at $e^\pm$ beam energies of $\sim2~$GeV. At such beam energies the xBSM images x-rays of $ε\approx$1-10$~$keV ($λ\approx 0.1-1$ nm) that emerge from a hard-bend magnet through a single- or multiple-slit (coded aperture) optical element onto an array of 32 InGaAs photodiodes with 50$~μ$m pitch. Beamlines and detectors are entirely in-vacuum, enabling single-shot beam size measurement down to below 0.1$~$mA ($2.5\times10^9$ particles) per bunch and inter-bunch spacing of as little as 4$~$ns. At $E_{\rm b}=2.1 $GeV, systematic precision of $\sim 1~μ$m is achieved for a beam size of $\sim12~μ$m; this is expected to scale as $\propto 1/σ_{\rm b}$ and $\propto 1/E_{\rm b}$. Achieving this precision requires comprehensive alignment and calibration of the detector, optical elements, and x-ray beam. Data from the xBSM have been used to extract characteristics of beam oscillations on long and short timescales, and to make detailed studies of low-emittance tuning, intra-beam scattering, electron cloud effects, and multi-bunch instabilities.
△ Less
Submitted 3 March, 2014; v1 submitted 26 November, 2013;
originally announced November 2013.
-
Observation of Vertical Betatron Sideband due to Electron Clouds in the KEKB LER
Authors:
J. W. Flanagan,
K. Ohmi,
H. Fukuma,
S. Hiramatsu,
M. Tobiyama,
E. Perevedentsev
Abstract:
The effects of electron clouds on positively-charged beams have been an active area of research in recent years at particle accelerators around the world. Transverse beam-size blow-up due to electron clouds has been observed in some machines, and is considered to be a major limiting factor in the development of higher-current, higher-luminosity electron-positron colliders. The leading proposed m…
▽ More
The effects of electron clouds on positively-charged beams have been an active area of research in recent years at particle accelerators around the world. Transverse beam-size blow-up due to electron clouds has been observed in some machines, and is considered to be a major limiting factor in the development of higher-current, higher-luminosity electron-positron colliders. The leading proposed mechanism for beam blow-up is the excitation of a fast head-tail instability due to short-range wakes within the electron cloud. We present here observations of betatron oscillation sidebands in bunch-by-bunch spectra that may provide direct evidence of such head-tail motion in a positron beam.
△ Less
Submitted 19 January, 2005; v1 submitted 29 July, 2004;
originally announced July 2004.
-
Negative Momentum Compaction at KEKB
Authors:
H. Ikeda,
J. W. Flanagan,
H. Fukuma,
S. Hiramatsu,
T. Ieiri,
H. Koiso,
T. Mimashi,
T. Mitsuhashi
Abstract:
KEKB is a high luminosity e+e- collider for studying B mesons and has achieved the design luminosity of 1034cm-2s-1 in 2003. In order to get higher luminosity, we tested negative momentum compaction optics in the summer of 2003. We measured the bunch length using three methods at 0.7mA to 1.17mA bunch current and confirmed the length was shortened with the negative momentum compaction optics.
KEKB is a high luminosity e+e- collider for studying B mesons and has achieved the design luminosity of 1034cm-2s-1 in 2003. In order to get higher luminosity, we tested negative momentum compaction optics in the summer of 2003. We measured the bunch length using three methods at 0.7mA to 1.17mA bunch current and confirmed the length was shortened with the negative momentum compaction optics.
△ Less
Submitted 28 January, 2004;
originally announced January 2004.