Commissioning of a compact multibend achromat lattice: A new 3 GeV synchrotron radiation facility
Authors:
Shuhei Obara,
Kota Ueshima,
Takao Asaka,
Yuji Hosaka,
Koichi Kan,
Nobuyuki Nishimori,
Toshitaka Aoki,
Hiroyuki Asano,
Koichi Haga,
Yuto Iba,
Akira Ihara,
Katsumasa Ito,
Taiki Iwashita,
Masaya Kadowaki,
Rento Kanahama,
Hajime Kobayashi,
Hideki Kobayashi,
Hideo Nishihara,
Masaaki Nishikawa,
Haruhiko Oikawa,
Ryota Saida,
Keisuke Sakuraba,
Kento Sugimoto,
Masahiro Suzuki,
Kouki Takahashi
, et al. (57 additional authors not shown)
Abstract:
NanoTerasu, a new 3 GeV synchrotron light source in Japan, began user operation in April 2024. It provides high-brilliance soft to tender X-rays and covers a wide spectral range from ultraviolet to tender X-rays. Its compact storage ring with a circumference of 349 m is based on a four-bend achromat lattice to provide two straight sections in each cell for insertion devices with a natural horizont…
▽ More
NanoTerasu, a new 3 GeV synchrotron light source in Japan, began user operation in April 2024. It provides high-brilliance soft to tender X-rays and covers a wide spectral range from ultraviolet to tender X-rays. Its compact storage ring with a circumference of 349 m is based on a four-bend achromat lattice to provide two straight sections in each cell for insertion devices with a natural horizontal emittance of 1.14 nm rad, which is small enough for soft X-rays users. The NanoTerasu accelerator incorporates several innovative technologies, including a full-energy injector C-band linear accelerator with a length of 110 m, an in-vacuum off-axis injection system, a four-bend achromat with B-Q combined bending magnets, and a TM020 mode accelerating cavity with built-in higher-order-mode dampers in the storage ring. This paper presents the accelerator machine commissioning over a half-year period and our model-consistent ring optics correction. The first user operation with a stored beam current of 160 mA is also reported. We summarize the storage ring parameters obtained from the commissioning. This is helpful for estimating the effective optical properties of synchrotron radiation at NanoTerasu.
△ Less
Submitted 11 July, 2024;
originally announced July 2024.
Upgrade of Linac Control System with New Vme Controllers at Spring-8
Authors:
T. Masuda,
T. Ohata,
T. Asaka,
H. Dewa,
T. Fukui,
H. Hanaki,
N. Hosoda,
T. Kobayashi,
M. Kodera,
A. Mizuno,
S. Nakajima,
S. Suzuki,
M. Takao,
R. Tanaka,
T. Taniuchi,
Y. Taniuchi,
H. Tomizawa,
A. Yamashita,
K. Yanagida
Abstract:
We integrated an injector linac control system to the SPring-8 standard system on September 2000. As a result of this integration, the SPring-8 accelerator complex was controlled by one unified system. Because the linac was continuously running as the electron beam injector not only for the SPring-8 storage ring but also for New SUBARU, we had to minimize the hardware modification to reduce the…
▽ More
We integrated an injector linac control system to the SPring-8 standard system on September 2000. As a result of this integration, the SPring-8 accelerator complex was controlled by one unified system. Because the linac was continuously running as the electron beam injector not only for the SPring-8 storage ring but also for New SUBARU, we had to minimize the hardware modification to reduce the time for the development and testing of the new control system. The integration method was almost the same as that of the integration of the booster synchrotron. We report here on the integration of the linac control system with emphasis on the upgrade of the VMEbus controllers and software involving the operating system Solaris 7 as the real-time OS.
△ Less
Submitted 14 December, 2001; v1 submitted 15 November, 2001;
originally announced November 2001.