2D electromagnetic simulations of RF heating via inductive coupling in the SPIDER device
Authors:
D. López-Bruna,
P. Jain,
M. Recchia,
B. Zaniol,
E. Sartori,
C. Poggi,
V. Candeloro,
G. Serianni,
P. Veltri
Abstract:
SPIDER is the prototype ion source of MITICA, the full-size neutral beam heating system conceived for the ITER tokamak. It includes eight drivers to heat and sustain the inductively coupled plasma (ICP). Owing to their near cylindrical symmetry, the coupling between the radio-frequency (RF) active currents and the source plasma is studied using a 2D electromagnetic approach with simplified express…
▽ More
SPIDER is the prototype ion source of MITICA, the full-size neutral beam heating system conceived for the ITER tokamak. It includes eight drivers to heat and sustain the inductively coupled plasma (ICP). Owing to their near cylindrical symmetry, the coupling between the radio-frequency (RF) active currents and the source plasma is studied using a 2D electromagnetic approach with simplified expressions for the plasma electrical conductivity taken from the literature. The power absorbed by the plasma and the effect of the induced plasma currents in lowering the inductance of the driver are based on data from the dedicated S16 experimental campaign (y.~2020) of SPIDER: plasma electron densities on the order of $10^{18}$ m$^{-3}$, electron temperatures $\sim 10$ eV; neutral gas pressure $\sim 0.3$ Pa and up to $50$ kW of net power per driver. It is found that the plasma conductivity cannot be explained by the friction forces associated to local collisional processes alone. The inclusion of an effective collisionality associated to non-local processes seems also insufficient to explain the experimental information. Only when the electrical conductivity is reduced where the RF magnetic field is more intense, can the heating power and driver inductance be acceptably reproduced. We present the first 2D electromagnetic ICP calculations in SPIDER for two types of plasma, without and with the addition of a static magnetic field. The power transfer efficiency to the plasma of the first drivers of SPIDER, in view of these models, is around 50%
△ Less
Submitted 16 May, 2023;
originally announced May 2023.
Lessons learned after three years of SPIDER operation and the first MITICA integrated tests
Authors:
D. Marcuzzi,
V. Toigo,
M. Boldrin,
G. Chitarin,
S. Dal Bello,
L. Grando,
A. Luchetta,
R. Pasqualotto,
M. Pavei,
G. Serianni,
L. Zanotto,
R. Agnello,
P. Agostinetti,
M. Agostini,
D. Aprile,
M. Barbisan,
M. Battistella,
G. Berton,
M. Bigi,
M. Brombin,
V. Candela,
V. Candeloro,
A. Canton,
R. Casagrande,
C. Cavallini
, et al. (117 additional authors not shown)
Abstract:
ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system. The 16.5 MW expected neutral beam power per injector is several notches higher than worldwide existing facilities. A Neutral Beam Test Facility (NBTF) was established at Consorzio RFX, exploiting the synergy of two test beds, SPIDER and MITICA. SPIDER is dedi…
▽ More
ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system. The 16.5 MW expected neutral beam power per injector is several notches higher than worldwide existing facilities. A Neutral Beam Test Facility (NBTF) was established at Consorzio RFX, exploiting the synergy of two test beds, SPIDER and MITICA. SPIDER is dedicated to developing and characterizing large efficient negative ion sources at relevant parameters in ITER-like conditions: source and accelerator located in the same vacuum where the beam propagates, immunity to electromagnetic interferences of multiple radio-frequency (RF) antennas, avoidance of RF-induced discharges on the outside of the source. Three years of experiments on SPIDER have addressed to the necessary design modifications to enable full performances. The source is presently under a long shut-down phase to incorporate learnings from the experimental campaign. Parallelly, developments on MITICA, the full-scale prototype of the ITER NBI featuring a 1 MV accelerator and ion neutralization, are underway including manufacturing of in-vessel components, while power supplies and auxiliary plants are already under final testing and commissioning. Integration, commissioning and tests of the 1MV power supplies are essential for this first-of-kind system, unparalleled both in research and industry field. The integrated test to confirm 1MV output by combining invertor systems, DC generators and transmission lines extracted errors/accidents in some components. To realize a concrete system for ITER, solutions for the repair and the improvement of the system were developed. Hence, NBTF is emerging as a necessary facility, due to the large gap with existing injectors, effectively dedicated to identify issues and find solutions to enable successful ITER NBI operations in a time bound fashion.
△ Less
Submitted 4 April, 2023;
originally announced April 2023.