-
Decommissioning and Post-Irradiation Examination of the LHC Beam Dumps
Authors:
N. Solieri,
A. Lund,
A. -P. Bernardes,
L. R. Buonocore,
A. Cherif,
S. De Man,
M. Di Castro,
S. Di Giovannantonio,
G. Dumont,
S. El-Idrissi,
E. Farina,
D. Grenier,
E. Grenier-Boley,
M. Himmerlich,
A. Infantino,
A. Lechner,
R. Mouret,
D. Pazem,
A. T. Perez-Fontenla,
E. Romagnoli,
S. Sgobba,
C. Tromel,
C. Veiga Almagro,
M. Calviani
Abstract:
The LHC beam dumps are responsible for the safe absorption of the Large Hadron Collider (LHC) particle beams. In 2018, the two 6.4-tonne beam dumps that had been in operation since the LHC's startup in 2008 were removed and replaced with upgraded versions. Endoscopic inspections of these beam dumps and experimental high-intensity proton-beam irradiation of material samples raised concerns about th…
▽ More
The LHC beam dumps are responsible for the safe absorption of the Large Hadron Collider (LHC) particle beams. In 2018, the two 6.4-tonne beam dumps that had been in operation since the LHC's startup in 2008 were removed and replaced with upgraded versions. Endoscopic inspections of these beam dumps and experimental high-intensity proton-beam irradiation of material samples raised concerns about the structural integrity of the carbon-based materials in their cores. It was therefore decided to undertake an accelerated project of dismantling and post-irradiation examination of the removed dumps as part of a wider program of work to ensure the safe operation of the LHC beam dumps in the coming years. This paper describes the decommissioning process for the two beam dumps carried out at CERN between 2021 and 2023, covering the preparatory studies, practical challenges encountered, and solutions implemented. It details the establishment of an operational framework, including the preparation of the working environment, the development of a method for cutting the irradiated 12-mm-thick duplex stainless-steel vessel, and the cut sequencing. Additionally, the paper presents the findings derived from the post-irradiation examination of the different carbon-based core materials subjected to deposited energy densities up to 1.5 kJ/g. The extruded graphite plates within the vessel exhibited a cracking pattern, which was likely due to the dynamic response of the device upon beam impact, and their retaining rings were found to be displaced. Despite minor signs of surface deterioration, the expanded graphite sheets were intact, and the isostatic graphite blocks showed no evidence of material degradation.
△ Less
Submitted 7 May, 2025;
originally announced May 2025.
-
Future Circular Collider Feasibility Study Report: Volume 2, Accelerators, Technical Infrastructure and Safety
Authors:
M. Benedikt,
F. Zimmermann,
B. Auchmann,
W. Bartmann,
J. P. Burnet,
C. Carli,
A. Chancé,
P. Craievich,
M. Giovannozzi,
C. Grojean,
J. Gutleber,
K. Hanke,
A. Henriques,
P. Janot,
C. Lourenço,
M. Mangano,
T. Otto,
J. Poole,
S. Rajagopalan,
T. Raubenheimer,
E. Todesco,
L. Ulrici,
T. Watson,
G. Wilkinson,
A. Abada
, et al. (1439 additional authors not shown)
Abstract:
In response to the 2020 Update of the European Strategy for Particle Physics, the Future Circular Collider (FCC) Feasibility Study was launched as an international collaboration hosted by CERN. This report describes the FCC integrated programme, which consists of two stages: an electron-positron collider (FCC-ee) in the first phase, serving as a high-luminosity Higgs, top, and electroweak factory;…
▽ More
In response to the 2020 Update of the European Strategy for Particle Physics, the Future Circular Collider (FCC) Feasibility Study was launched as an international collaboration hosted by CERN. This report describes the FCC integrated programme, which consists of two stages: an electron-positron collider (FCC-ee) in the first phase, serving as a high-luminosity Higgs, top, and electroweak factory; followed by a proton-proton collider (FCC-hh) at the energy frontier in the second phase.
FCC-ee is designed to operate at four key centre-of-mass energies: the Z pole, the WW production threshold, the ZH production peak, and the top/anti-top production threshold - delivering the highest possible luminosities to four experiments. Over 15 years of operation, FCC-ee will produce more than 6 trillion Z bosons, 200 million WW pairs, nearly 3 million Higgs bosons, and 2 million top anti-top pairs. Precise energy calibration at the Z pole and WW threshold will be achieved through frequent resonant depolarisation of pilot bunches. The sequence of operation modes remains flexible.
FCC-hh will operate at a centre-of-mass energy of approximately 85 TeV - nearly an order of magnitude higher than the LHC - and is designed to deliver 5 to 10 times the integrated luminosity of the HL-LHC. Its mass reach for direct discovery extends to several tens of TeV. In addition to proton-proton collisions, FCC-hh is capable of supporting ion-ion, ion-proton, and lepton-hadron collision modes.
This second volume of the Feasibility Study Report presents the complete design of the FCC-ee collider, its operation and staging strategy, the full-energy booster and injector complex, required accelerator technologies, safety concepts, and technical infrastructure. It also includes the design of the FCC-hh hadron collider, development of high-field magnets, hadron injector options, and key technical systems for FCC-hh.
△ Less
Submitted 25 April, 2025;
originally announced May 2025.
-
Future Circular Collider Feasibility Study Report: Volume 3, Civil Engineering, Implementation and Sustainability
Authors:
M. Benedikt,
F. Zimmermann,
B. Auchmann,
W. Bartmann,
J. P. Burnet,
C. Carli,
A. Chancé,
P. Craievich,
M. Giovannozzi,
C. Grojean,
J. Gutleber,
K. Hanke,
A. Henriques,
P. Janot,
C. Lourenço,
M. Mangano,
T. Otto,
J. Poole,
S. Rajagopalan,
T. Raubenheimer,
E. Todesco,
L. Ulrici,
T. Watson,
G. Wilkinson,
P. Azzi
, et al. (1439 additional authors not shown)
Abstract:
Volume 3 of the FCC Feasibility Report presents studies related to civil engineering, the development of a project implementation scenario, and environmental and sustainability aspects. The report details the iterative improvements made to the civil engineering concepts since 2018, taking into account subsurface conditions, accelerator and experiment requirements, and territorial considerations. I…
▽ More
Volume 3 of the FCC Feasibility Report presents studies related to civil engineering, the development of a project implementation scenario, and environmental and sustainability aspects. The report details the iterative improvements made to the civil engineering concepts since 2018, taking into account subsurface conditions, accelerator and experiment requirements, and territorial considerations. It outlines a technically feasible and economically viable civil engineering configuration that serves as the baseline for detailed subsurface investigations, construction design, cost estimation, and project implementation planning. Additionally, the report highlights ongoing subsurface investigations in key areas to support the development of an improved 3D subsurface model of the region.
The report describes development of the project scenario based on the 'avoid-reduce-compensate' iterative optimisation approach. The reference scenario balances optimal physics performance with territorial compatibility, implementation risks, and costs. Environmental field investigations covering almost 600 hectares of terrain - including numerous urban, economic, social, and technical aspects - confirmed the project's technical feasibility and contributed to the preparation of essential input documents for the formal project authorisation phase. The summary also highlights the initiation of public dialogue as part of the authorisation process. The results of a comprehensive socio-economic impact assessment, which included significant environmental effects, are presented. Even under the most conservative and stringent conditions, a positive benefit-cost ratio for the FCC-ee is obtained. Finally, the report provides a concise summary of the studies conducted to document the current state of the environment.
△ Less
Submitted 25 April, 2025;
originally announced May 2025.
-
Future Circular Collider Feasibility Study Report: Volume 1, Physics, Experiments, Detectors
Authors:
M. Benedikt,
F. Zimmermann,
B. Auchmann,
W. Bartmann,
J. P. Burnet,
C. Carli,
A. Chancé,
P. Craievich,
M. Giovannozzi,
C. Grojean,
J. Gutleber,
K. Hanke,
A. Henriques,
P. Janot,
C. Lourenço,
M. Mangano,
T. Otto,
J. Poole,
S. Rajagopalan,
T. Raubenheimer,
E. Todesco,
L. Ulrici,
T. Watson,
G. Wilkinson,
P. Azzi
, et al. (1439 additional authors not shown)
Abstract:
Volume 1 of the FCC Feasibility Report presents an overview of the physics case, experimental programme, and detector concepts for the Future Circular Collider (FCC). This volume outlines how FCC would address some of the most profound open questions in particle physics, from precision studies of the Higgs and EW bosons and of the top quark, to the exploration of physics beyond the Standard Model.…
▽ More
Volume 1 of the FCC Feasibility Report presents an overview of the physics case, experimental programme, and detector concepts for the Future Circular Collider (FCC). This volume outlines how FCC would address some of the most profound open questions in particle physics, from precision studies of the Higgs and EW bosons and of the top quark, to the exploration of physics beyond the Standard Model. The report reviews the experimental opportunities offered by the staged implementation of FCC, beginning with an electron-positron collider (FCC-ee), operating at several centre-of-mass energies, followed by a hadron collider (FCC-hh). Benchmark examples are given of the expected physics performance, in terms of precision and sensitivity to new phenomena, of each collider stage. Detector requirements and conceptual designs for FCC-ee experiments are discussed, as are the specific demands that the physics programme imposes on the accelerator in the domains of the calibration of the collision energy, and the interface region between the accelerator and the detector. The report also highlights advances in detector, software and computing technologies, as well as the theoretical tools /reconstruction techniques that will enable the precision measurements and discovery potential of the FCC experimental programme. This volume reflects the outcome of a global collaborative effort involving hundreds of scientists and institutions, aided by a dedicated community-building coordination, and provides a targeted assessment of the scientific opportunities and experimental foundations of the FCC programme.
△ Less
Submitted 25 April, 2025;
originally announced May 2025.
-
The Muon Collider
Authors:
Carlotta Accettura,
Simon Adrian,
Rohit Agarwal,
Claudia Ahdida,
Chiara Aime',
Avni Aksoy,
Gian Luigi Alberghi,
Siobhan Alden,
Luca Alfonso,
Muhammad Ali,
Anna Rita Altamura,
Nicola Amapane,
Kathleen Amm,
David Amorim,
Paolo Andreetto,
Fabio Anulli,
Ludovica Aperio Bella,
Rob Appleby,
Artur Apresyan,
Pouya Asadi,
Mohammed Attia Mahmoud,
Bernhard Auchmann,
John Back,
Anthony Badea,
Kyu Jung Bae
, et al. (433 additional authors not shown)
Abstract:
Muons offer a unique opportunity to build a compact high-energy electroweak collider at the 10 TeV scale. A Muon Collider enables direct access to the underlying simplicity of the Standard Model and unparalleled reach beyond it. It will be a paradigm-shifting tool for particle physics representing the first collider to combine the high-energy reach of a proton collider and the high precision of an…
▽ More
Muons offer a unique opportunity to build a compact high-energy electroweak collider at the 10 TeV scale. A Muon Collider enables direct access to the underlying simplicity of the Standard Model and unparalleled reach beyond it. It will be a paradigm-shifting tool for particle physics representing the first collider to combine the high-energy reach of a proton collider and the high precision of an electron-positron collider, yielding a physics potential significantly greater than the sum of its individual parts. A high-energy muon collider is the natural next step in the exploration of fundamental physics after the HL-LHC and a natural complement to a future low-energy Higgs factory. Such a facility would significantly broaden the scope of particle colliders, engaging the many frontiers of the high energy community.
The last European Strategy for Particle Physics Update and later the Particle Physics Project Prioritisation Panel in the US requested a study of the muon collider, which is being carried on by the International Muon Collider Collaboration. In this comprehensive document we present the physics case, the state of the work on accelerator design and technology, and propose an R\&D project that can make the muon collider a reality.
△ Less
Submitted 30 April, 2025;
originally announced April 2025.
-
HEP High Power Targetry Roadmap -- Workshop Report
Authors:
F. Pellemoine,
K. Ammigan,
C. Barbier,
S. Bidhar,
A. Casella,
M. Calviani,
C. Densham,
P. Hurh,
D. Kim,
D. Liu,
K. Lynch,
S. Makimura,
D. Senor,
V. Shiltsev,
D. Stratakis,
J. Terry,
K. Yonehara
Abstract:
Designing a reliable target is already a challenge for MW-class facilities today and has led several major accelerator facilities to operate at lower than design power due to target concerns. With present plans to increase beam power for next generation accelerator facilities in the next decade, timely R and D in support of robust high power targets is critical to secure the full physics benefits…
▽ More
Designing a reliable target is already a challenge for MW-class facilities today and has led several major accelerator facilities to operate at lower than design power due to target concerns. With present plans to increase beam power for next generation accelerator facilities in the next decade, timely R and D in support of robust high power targets is critical to secure the full physics benefits of ambitious accelerator power upgrades. A comprehensive R and D program must be implemented to address the many complex challenges faced by multi MW beam intercepting devices. This roadmap is envisioned to be helpful to the DOE-OHEP office when planning and prioritizing future R and D activities as well as leveraging synergies across the Office of Science. The roadmap will be extremely beneficial to the broader (external to DOE HEP) HPT community by communicating OHEP s high level strategy and objectives for HPT R and D and highlighting possible opportunities for collaboration.
△ Less
Submitted 5 February, 2025;
originally announced February 2025.
-
The ENUBET monitored neutrino beam and its implementation at CERN
Authors:
ENUBET collaboration,
L. Halić,
F. Acerbi,
I. Angelis,
L. Bomben,
M. Bonesini,
F. Bramati,
A. Branca,
C. Brizzolari,
G. Brunetti,
M. Calviani,
S. Capelli,
M. Capitani,
S. Carturan,
M. G. Catanesi,
S. Cecchini,
N. Charitonidis,
F. Cindolo,
G. Cogo,
G. Collazuol,
F. Dal Corso,
C. Delogu,
G. De Rosa,
A. Falcone,
B. Goddard
, et al. (52 additional authors not shown)
Abstract:
The ENUBET project recently concluded the R&D for a site independent design of a monitored neutrino beam for high precision cross section measurements, in which the neutrino flux is inferred from the measurement of charged leptons in an instrumented decay tunnel. In this phase three fundamental results were obtained and will be discussed here: 1) a beamline not requiring a horn and relying on stat…
▽ More
The ENUBET project recently concluded the R&D for a site independent design of a monitored neutrino beam for high precision cross section measurements, in which the neutrino flux is inferred from the measurement of charged leptons in an instrumented decay tunnel. In this phase three fundamental results were obtained and will be discussed here: 1) a beamline not requiring a horn and relying on static focusing elements allows to perform a $ν_e$ cross section measurement in the DUNE energy range with 1% statistical uncertainty employing $10^{20}$ 400 GeV protons on target (pot) and a neutrino detector of the size of ProtoDUNE; 2) the instrumentation of the decay tunnel, based on a cost effective sampling calorimeter solution, has been tested with a large scale prototype achieving the performance required to identify positrons and muons from kaon decays with high signal-to-noise ratio; 3) the systematics budget on the neutrino flux is constrained at the 1% level by fitting the charged leptons observables measured in the decay tunnel. Based on these successful results ENUBET is now pursuing a study for a site dependent implementation at CERN in the framework of Physics Beyond Colliders. In this context a new beamline, able to enrich the neutrino flux at the energy of HK and to reduce by more than a factor 3 the needed pot, has been designed and is being optimized. The civil engineering and radioprotection studies for the siting of ENUBET in the North Area towards the two ProtoDUNEs are also in the scope of this work, with the goal of proposing a neutrino cross section experiment in 2026. The combined use of both the neutrino detectors and of the improved beamline would allow to perform cross section measurements with unprecedented precision in about 5 years with a proton request compatible with the needs of other users after CERN Long Shutdown 3.
△ Less
Submitted 8 January, 2025;
originally announced January 2025.
-
Towards a new generation of solid total-energy detectors for neutron-capture time-of-flight experiments with intense neutron beams
Authors:
J. Balibrea-Correa,
V. Babiano-Suarez,
J. Lerendegui-Marco,
C. Domingo-Pardo,
I. Ladarescu,
A. Tarifeño-Saldivia,
G. de la Fuente-Rosales,
B. Gameiro,
N. Zaitseva,
V. Alcayne,
D. Cano-Ott,
E. González-Romero,
T. Martínez,
E. Mendoza,
A. Pérez de Rada,
J. Plaza del Olmo,
A. Sánchez-Caballero,
A. Casanovas,
F. Calviño,
S. Valenta,
O. Aberle,
S. Altieri,
S. Amaducci,
J. Andrzejewski,
M. Bacak
, et al. (112 additional authors not shown)
Abstract:
Challenging neutron-capture cross-section measurements of small cross sections and samples with a very limited number of atoms require high-flux time-of-flight facilities. In turn, such facilities need innovative detection setups that are fast, have low sensitivity to neutrons, can quickly recover from the so-called $γ$-flash, and offer the highest possible detection sensitivity. In this paper, we…
▽ More
Challenging neutron-capture cross-section measurements of small cross sections and samples with a very limited number of atoms require high-flux time-of-flight facilities. In turn, such facilities need innovative detection setups that are fast, have low sensitivity to neutrons, can quickly recover from the so-called $γ$-flash, and offer the highest possible detection sensitivity. In this paper, we present several steps toward such advanced systems. Specifically, we describe the performance of a high-sensitivity experimental setup at CERN n\_TOF EAR2. It consists of nine sTED detector modules in a compact cylindrical configuration, two conventional used large-volume C$_{6}$D$_{6}$ detectors, and one LaCl$_{3}$(Ce) detector. The performance of these detection systems is compared using $^{93}$Nb($n$,$γ$) data. We also developed a detailed \textsc{Geant4} Monte Carlo model of the experimental EAR2 setup, which allows for a better understanding of the detector features, including their efficiency determination. This Monte Carlo model has been used for further optimization, thus leading to a new conceptual design of a $γ$ detector array, STAR, based on a deuterated-stilbene crystal array. Finally, the suitability of deuterated-stilbene crystals for the future STAR array is investigaged experimentally utilizing a small stilbene-d12 prototype. The results suggest a similar or superior performance of STAR with respect to other setups based on liquid-scintillators, and allow for additional features such as neutron-gamma discrimination and a higher level of customization capability.
△ Less
Submitted 28 November, 2024;
originally announced November 2024.
-
MuCol Milestone Report No. 5: Preliminary Parameters
Authors:
Carlotta Accettura,
Simon Adrian,
Rohit Agarwal,
Claudia Ahdida,
Chiara Aimé,
Avni Aksoy,
Gian Luigi Alberghi,
Siobhan Alden,
Luca Alfonso,
Nicola Amapane,
David Amorim,
Paolo Andreetto,
Fabio Anulli,
Rob Appleby,
Artur Apresyan,
Pouya Asadi,
Mohammed Attia Mahmoud,
Bernhard Auchmann,
John Back,
Anthony Badea,
Kyu Jung Bae,
E. J. Bahng,
Lorenzo Balconi,
Fabrice Balli,
Laura Bandiera
, et al. (369 additional authors not shown)
Abstract:
This document is comprised of a collection of updated preliminary parameters for the key parts of the muon collider. The updated preliminary parameters follow on from the October 2023 Tentative Parameters Report. Particular attention has been given to regions of the facility that are believed to hold greater technical uncertainty in their design and that have a strong impact on the cost and power…
▽ More
This document is comprised of a collection of updated preliminary parameters for the key parts of the muon collider. The updated preliminary parameters follow on from the October 2023 Tentative Parameters Report. Particular attention has been given to regions of the facility that are believed to hold greater technical uncertainty in their design and that have a strong impact on the cost and power consumption of the facility. The data is collected from a collaborative spreadsheet and transferred to overleaf.
△ Less
Submitted 5 November, 2024;
originally announced November 2024.
-
Exploring diffusion bonding of niobium and its alloys with tungsten and a molybdenum alloy for high-energy particle target applications
Authors:
Tina Griesemer,
Rui Franqueira Ximenes,
Claudia Ahdida,
Gonzalo Arnau Izquierdo,
Ignacio Aviles Santillana,
Jack Callaghan,
Gerald Dumont,
Thomas Dutilleul,
Adria Gallifa Terricabras,
Stefan Höll,
Richard Jacobsson,
William Kyffin,
Abdullah Al Mamun,
Giuseppe Mazzola,
Ana Teresa Pérez Fontenla,
Oscar Sacristan De Frutos,
Luigi Salvatore Esposito,
Stefano Sgobba,
Marco Calviani
Abstract:
Particle-producing targets in high-energy research facilities are often made from refractory metals, and they typically require dedicated cooling systems due to the challenging thermomechanical conditions they experience. However, direct contact of water with target blocks can induce erosion, corrosion, and embrittlement, especially of tungsten (W). One approach to overcoming this problem is cladd…
▽ More
Particle-producing targets in high-energy research facilities are often made from refractory metals, and they typically require dedicated cooling systems due to the challenging thermomechanical conditions they experience. However, direct contact of water with target blocks can induce erosion, corrosion, and embrittlement, especially of tungsten (W). One approach to overcoming this problem is cladding the blocks with tantalum (Ta). Unfortunately, Ta generates high decay heat when irradiated, raising safety concerns in the event of a loss-of-cooling accident. This study explored the capacity of niobium (Nb) and its alloys to form diffusion bonds with W and TZM (a molybdenum alloy with titanium and zirconium). This is because the Beam Dump Facility (BDF), a planned new fixed-target installation in CERN's North Area, uses these target materials. The bonding quality of pure Nb, Nb1Zr, and C103 (a Nb alloy with 10% hafnium and 1% titanium) with TZM and W obtained using hot isostatic pressing (HIP) was evaluated. The effects of different HIP temperatures and the introduction of a Ta interlayer were examined. Optical microscopy indicated promising bonding interfaces, which were further characterized using tensile tests and thermal-diffusivity measurements. Their performance under high-energy beam impact was validated using thermomechanical simulations. C103 exhibited higher interface strengths and safety factors than Ta2.5W, positioning it as a potential alternative cladding material for the BDF production target. The findings highlight the viability of Nb-based materials, particularly C103, for improving operational safety and efficiency in fixed-target physics experiments; however, considerations regarding the long half-life of 94Nb require further attention.
△ Less
Submitted 2 October, 2024;
originally announced October 2024.
-
Post-irradiation examination of a prototype tantalum-clad target for the Beam Dump Facility at CERN
Authors:
Tina Griesemer,
Rui Franqueira Ximenes,
Gonzalo Arnau Izquierdo,
Ignacio Aviles Santillana,
Thomas Brehm,
Adria Gallifa Terricabras,
Stefan Höll,
Richard Jacobsson,
Marco Kaiser,
Roman Kuchar,
Ana Teresa Pérez Fontenla,
Alexey Rempel,
Oscar Sacristan De Frutos,
Marcel Schienbein,
Stefano Sgobba,
Marco Calviani
Abstract:
The Beam Dump Facility (BDF) is a planned fixed-target installation in CERN's North Area, set to start operating in 2031. A proton beam of 400 GeV/c will be delivered in 1 s pulses of 4e13 protons every 7.2 s, amounting to 4e19 protons on target (PoT) per year, with an average thermal power deposition of 305 kW. The experiment requires high-Z and high-density materials and involves challenging the…
▽ More
The Beam Dump Facility (BDF) is a planned fixed-target installation in CERN's North Area, set to start operating in 2031. A proton beam of 400 GeV/c will be delivered in 1 s pulses of 4e13 protons every 7.2 s, amounting to 4e19 protons on target (PoT) per year, with an average thermal power deposition of 305 kW. The experiment requires high-Z and high-density materials and involves challenging thermomechanical conditions; hence, a water-cooled refractory metal core is proposed. To prevent corrosion and erosion, the target materials - tungsten and a molybdenum-based alloy, TZM-, are clad with a tantalum alloy using hot isostatic pressing. To verify the reliability of the target design and manufacturing process, a reduced-scale prototype target was manufactured and irradiated with 2.4e16 PoT in 2018. This paper presents the findings of the post-irradiation examination (PIE) conducted 2.5 years later. The PIE consisted of non-destructive and destructive activities, including film imaging, microscopy, metrology, ultrasonic testing, microstructural analysis, and mechanical and thermal characterization. No irradiation effects resulting from thermal stresses, such as geometrical changes or cracks in the cladding, were observed, and it was determined that the bonding between the core and cladding materials was robust. Moreover, no changes were detected in the microstructures or mechanical properties of the bulk materials. In conclusion, the robustness of the target baseline design and manufacturing process was confirmed, validating its suitability for operating under the desired conditions. Nonetheless, the observed brittleness of sintered tungsten indicates a potential area for improvement to enhance the lifetime of the BDF target. Overall, the examinations provided valuable insights into the performance of the prototype and indicated potential refinements for the future BDF target complex.
△ Less
Submitted 2 October, 2024;
originally announced October 2024.
-
Design, development, and construction of the new beam stoppers for CERN's injector complex
Authors:
D. Baillard,
E. Grenier-Boley,
M. Dole,
F. Deslande,
R. Froeschl,
T. Lorenzon,
P. Moyret,
R. Peron,
A. Pilan Zanoni,
C. Sharp,
M. Timmins,
M. Calviani
Abstract:
Beam stoppers are installed in the transfer lines of the CERN accelerator complex; these components are used as part of the access safety system, which guarantees the safety of workers in the accelerators. They are designed to stop one or at most a few pulses of the beam, where "stop" means the partial or complete absorption of the primary beam in such a way that the remaining unabsorbed primary o…
▽ More
Beam stoppers are installed in the transfer lines of the CERN accelerator complex; these components are used as part of the access safety system, which guarantees the safety of workers in the accelerators. They are designed to stop one or at most a few pulses of the beam, where "stop" means the partial or complete absorption of the primary beam in such a way that the remaining unabsorbed primary or secondary beam remains below a specified threshold, as defined by the needs of radiation protection. Prior to Long Shutdown 2 (LS2; 2018--2021), beam stoppers in the injector complex were dimensioned for beam-pulse energies between 9.0 and 30~kJ. The upgrade of the accelerator complex in the framework of the LHC Injectors Upgrade (LIU) project involves beam-pulse energies of up to 92.5~kJ, meaning that these beam stoppers are not able to fulfill the new functional specifications. To cope with the LIU beam parameters and fulfil requirements for safety, maintainability, efficiency, and reliability, a new generation of 28 beam stoppers has been designed, built, and installed. The aim of this paper is to demonstrate the requirements-driven design of these new beam stoppers, outlining the main requirements along with a description of the design and structural assessments. This document presents the implementation and integration of a standardized but adaptable design using a unique 564-mm-long stopper core with a CuCr1Zr absorber and an Inconel~718 diluter, taking into account radiological and infrastructure challenges. The installation process is also described, and the first operational feedback received since LS2 is presented.
△ Less
Submitted 2 August, 2024;
originally announced August 2024.
-
Interim report for the International Muon Collider Collaboration (IMCC)
Authors:
C. Accettura,
S. Adrian,
R. Agarwal,
C. Ahdida,
C. Aimé,
A. Aksoy,
G. L. Alberghi,
S. Alden,
N. Amapane,
D. Amorim,
P. Andreetto,
F. Anulli,
R. Appleby,
A. Apresyan,
P. Asadi,
M. Attia Mahmoud,
B. Auchmann,
J. Back,
A. Badea,
K. J. Bae,
E. J. Bahng,
L. Balconi,
F. Balli,
L. Bandiera,
C. Barbagallo
, et al. (362 additional authors not shown)
Abstract:
The International Muon Collider Collaboration (IMCC) [1] was established in 2020 following the recommendations of the European Strategy for Particle Physics (ESPP) and the implementation of the European Strategy for Particle Physics-Accelerator R&D Roadmap by the Laboratory Directors Group [2], hereinafter referred to as the the European LDG roadmap. The Muon Collider Study (MuC) covers the accele…
▽ More
The International Muon Collider Collaboration (IMCC) [1] was established in 2020 following the recommendations of the European Strategy for Particle Physics (ESPP) and the implementation of the European Strategy for Particle Physics-Accelerator R&D Roadmap by the Laboratory Directors Group [2], hereinafter referred to as the the European LDG roadmap. The Muon Collider Study (MuC) covers the accelerator complex, detectors and physics for a future muon collider. In 2023, European Commission support was obtained for a design study of a muon collider (MuCol) [3]. This project started on 1st March 2023, with work-packages aligned with the overall muon collider studies. In preparation of and during the 2021-22 U.S. Snowmass process, the muon collider project parameters, technical studies and physics performance studies were performed and presented in great detail. Recently, the P5 panel [4] in the U.S. recommended a muon collider R&D, proposed to join the IMCC and envisages that the U.S. should prepare to host a muon collider, calling this their "muon shot". In the past, the U.S. Muon Accelerator Programme (MAP) [5] has been instrumental in studies of concepts and technologies for a muon collider.
△ Less
Submitted 28 January, 2025; v1 submitted 17 July, 2024;
originally announced July 2024.
-
Design and early operation of a new-generation internal beam dump for CERN's Super Proton Synchrotron
Authors:
A. Romero Francia,
A. Perillo Marcone,
S. Pianese,
K. Andersen,
G. Arnau Izquierdo,
J. A. Briz,
D. Carbajo Perez,
E. Carlier,
T. Coiffet,
L. S. Esposito,
J. L. Grenard,
D. Grenier,
J. Humbert,
K. Kershaw,
J. Lendaro,
A. Ortega Rolo,
K. Scibor,
D. Senajova,
S. Sgobba,
C. Sharp,
D. Steyaert,
F. M. Velotti,
H. Vincke,
V. Vlachoudis,
M. Calviani
Abstract:
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN's Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams with…
▽ More
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN's Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function. The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to 450~GeV/$c$ and an average beam power up to $\sim$270~kW. This paper presents the technical details of a new design of SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019--2020 shutdown of CERN's accelerator complex. This new beam dump has been in operation since May 2021, and it is foreseen that it will operate with a lifetime of 20~years. The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated -- to avoid overheating and damage to the beam dump itself -- and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation. The design process therefore included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system's response to normal operation and worst-case scenarios for beam dumping. To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process. A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback.
△ Less
Submitted 27 December, 2023; v1 submitted 24 December, 2023;
originally announced December 2023.
-
Pushing the high count rate limits of scintillation detectors for challenging neutron-capture experiments
Authors:
J. Balibrea Correa,
J. Lerendegui-Marco,
V. Babiano-Suarez,
C. Domingo-Pardo,
I. Ladarescu,
A. Tarifeño-Saldivia,
V. Alcayne,
D. Cano-Ott,
E. González-Romero,
T. Martínez,
E. Mendoza,
A. Pérez de Rada,
J. Plaza del Olmo,
A. Sánchez-Caballero,
A. Casanovas,
F. Calviño,
S. Valenta,
O. Aberle,
S. Altieri,
S. Amaducci,
J. Andrzejewski,
M. Bacak,
C. Beltrami,
S. Bennett,
A. P. Bernardes
, et al. (109 additional authors not shown)
Abstract:
One of the critical aspects for the accurate determination of neutron capture cross sections when combining time-of-flight and total energy detector techniques is the characterization and control of systematic uncertainties associated to the measuring devices. In this work we explore the most conspicuous effects associated to harsh count rate conditions: dead-time and pile-up effects. Both effects…
▽ More
One of the critical aspects for the accurate determination of neutron capture cross sections when combining time-of-flight and total energy detector techniques is the characterization and control of systematic uncertainties associated to the measuring devices. In this work we explore the most conspicuous effects associated to harsh count rate conditions: dead-time and pile-up effects. Both effects, when not properly treated, can lead to large systematic uncertainties and bias in the determination of neutron cross sections. In the majority of neutron capture measurements carried out at the CERN n\_TOF facility, the detectors of choice are the C$_{6}$D$_{6}$ liquid-based either in form of large-volume cells or recently commissioned sTED detector array, consisting of much smaller-volume modules. To account for the aforementioned effects, we introduce a Monte Carlo model for these detectors mimicking harsh count rate conditions similar to those happening at the CERN n\_TOF 20~m fligth path vertical measuring station. The model parameters are extracted by comparison with the experimental data taken at the same facility during 2022 experimental campaign. We propose a novel methodology to consider both, dead-time and pile-up effects simultaneously for these fast detectors and check the applicability to experimental data from $^{197}$Au($n$,$γ$), including the saturated 4.9~eV resonance which is an important component of normalization for neutron cross section measurements.
△ Less
Submitted 2 November, 2023;
originally announced November 2023.
-
Design and performance of the ENUBET monitored neutrino beam
Authors:
F. Acerbi,
I. Angelis,
L. Bomben,
M. Bonesini,
F. Bramati,
A. Branca,
C. Brizzolari,
G. Brunetti,
M. Calviani,
S. Capelli,
S. Carturan,
M. G. Catanesi,
S. Cecchini,
N. Charitonidis,
F. Cindolo,
G. Cogo,
G. Collazuol,
F. Dal Corso,
C. Delogu,
G. De Rosa,
A. Falcone,
B. Goddard,
A. Gola,
D. Guffanti,
L. Halić
, et al. (47 additional authors not shown)
Abstract:
The ENUBET project is aimed at designing and experimentally demonstrating the concept of monitored neutrino beams. These novel beams are enhanced by an instrumented decay tunnel, whose detectors reconstruct large-angle charged leptons produced in the tunnel and give a direct estimate of the neutrino flux at the source. These facilities are thus the ideal tool for high-precision neutrino cross-sect…
▽ More
The ENUBET project is aimed at designing and experimentally demonstrating the concept of monitored neutrino beams. These novel beams are enhanced by an instrumented decay tunnel, whose detectors reconstruct large-angle charged leptons produced in the tunnel and give a direct estimate of the neutrino flux at the source. These facilities are thus the ideal tool for high-precision neutrino cross-section measurements at the GeV scale because they offer superior control of beam systematics with respect to existing facilities. In this paper, we present the first end-to-end design of a monitored neutrino beam capable of monitoring lepton production at the single particle level. This goal is achieved by a new focusing system without magnetic horns, a 20 m normal-conducting transfer line for charge and momentum selection, and a 40 m tunnel instrumented with cost-effective particle detectors. Employing such a design, we show that percent precision in cross-section measurements can be achieved at the CERN SPS complex with existing neutrino detectors.
△ Less
Submitted 18 August, 2023;
originally announced August 2023.
-
FIB-SEM investigation and uniaxial compression of flexible graphite
Authors:
Emanuele Solfiti,
Di Wan,
Ambra Celotto,
Nicola Solieri,
Pablo Andreu Munoz,
Rui Franqueira Ximenes,
Jorge Maestre Heredia,
Claudio Leopoldo Torregrosa Martin,
Antonio Perillo Marcone Francois-Xavier Nuiry,
Antonio Alvaro,
Filippo Berto,
Marco Calviani
Abstract:
Flexible graphite (FG) with 1 - 1.2 g/cm$^3$ density is employed as beam energy absorber material in the CERN's Large Hadron Collider (LHC) beam dumping system. However, the increase of energy deposited expected for new HL-LHC (High-Luminosity LHC) design demanded for an improvement in reliability and safety of beam dumping devices, and the need for a calibrated material model suitable for high-le…
▽ More
Flexible graphite (FG) with 1 - 1.2 g/cm$^3$ density is employed as beam energy absorber material in the CERN's Large Hadron Collider (LHC) beam dumping system. However, the increase of energy deposited expected for new HL-LHC (High-Luminosity LHC) design demanded for an improvement in reliability and safety of beam dumping devices, and the need for a calibrated material model suitable for high-level FE simulations has been prioritized. This work sets the basic knowledge to develop a material model for FG suitable to this aim. A review of the FG properties available in literature is first given, followed by FIB-SEM (Focused Ion Beam - Scanning Electron Microscopy) microstructure investigation and monotonic and cyclic uniaxial compression tests. Similarities with other well-known groups of materials such as crushable foams, crumpled materials and compacted powders have been discussed. A simple 1D phenomenological model has been used to fit the experimental stress-strain curves and the accuracy of the result supports the assumptions that the graphite-like microstructure and the crumpled meso-structure play the major role under out-of-plane uniaxial compression.
△ Less
Submitted 8 April, 2023;
originally announced April 2023.
-
Towards a Muon Collider
Authors:
Carlotta Accettura,
Dean Adams,
Rohit Agarwal,
Claudia Ahdida,
Chiara Aimè,
Nicola Amapane,
David Amorim,
Paolo Andreetto,
Fabio Anulli,
Robert Appleby,
Artur Apresyan,
Aram Apyan,
Sergey Arsenyev,
Pouya Asadi,
Mohammed Attia Mahmoud,
Aleksandr Azatov,
John Back,
Lorenzo Balconi,
Laura Bandiera,
Roger Barlow,
Nazar Bartosik,
Emanuela Barzi,
Fabian Batsch,
Matteo Bauce,
J. Scott Berg
, et al. (272 additional authors not shown)
Abstract:
A muon collider would enable the big jump ahead in energy reach that is needed for a fruitful exploration of fundamental interactions. The challenges of producing muon collisions at high luminosity and 10 TeV centre of mass energy are being investigated by the recently-formed International Muon Collider Collaboration. This Review summarises the status and the recent advances on muon colliders desi…
▽ More
A muon collider would enable the big jump ahead in energy reach that is needed for a fruitful exploration of fundamental interactions. The challenges of producing muon collisions at high luminosity and 10 TeV centre of mass energy are being investigated by the recently-formed International Muon Collider Collaboration. This Review summarises the status and the recent advances on muon colliders design, physics and detector studies. The aim is to provide a global perspective of the field and to outline directions for future work.
△ Less
Submitted 27 November, 2023; v1 submitted 15 March, 2023;
originally announced March 2023.
-
The CERN n TOF NEAR station for astrophysics- and application-related neutron activation measurements
Authors:
N. Patronis,
A. Mengoni,
N. Colonna,
M. Cecchetto,
C. Domingo-Pardo,
O. Aberle,
J. Lerendegui-Marco,
G. Gervino,
M. E. Stamati,
S. Goula,
A. P. Bernardes,
M. Mastromarco,
A. Manna,
R. Vlastou,
C. Massimi,
M. Calviani,
V. Alcayne,
S. Altieri,
S. Amaducci,
J. Andrzejewski,
V. Babiano-Suarez,
M. Bacak,
J. Balibrea,
C. Beltrami,
S. Bennett
, et al. (108 additional authors not shown)
Abstract:
A new experimental area, the NEAR station, has recently been built at the CERN n TOF facility, at a short distance from the spallation target (1.5 m). The new area, characterized by a neutron beam of very high flux, has been designed with the purpose of performing activation measurements of interest for astrophysics and various applications. The beam is transported from the spallation target to th…
▽ More
A new experimental area, the NEAR station, has recently been built at the CERN n TOF facility, at a short distance from the spallation target (1.5 m). The new area, characterized by a neutron beam of very high flux, has been designed with the purpose of performing activation measurements of interest for astrophysics and various applications. The beam is transported from the spallation target to the NEAR station through a hole in the shielding wall of the target, inside which a collimator is inserted. The new area is complemented with a γ-ray spectroscopy laboratory, the GEAR station, equipped with a high efficiency HPGe detector, for the measurement of the activity resulting from irradiation of a sample in the NEAR station. The use of a moderator/filter assembly is envisaged, in order to produce a neutron beam of Maxwellian shape at different thermal energies, necessary for the measurement of Maxwellian Averaged Cross Sections of astrophysical interest. A new fast-cycling activation technique is also being investigated, for measurements of reactions leading to isotopes of very short half life.
△ Less
Submitted 5 September, 2022;
originally announced September 2022.
-
Study of alternative locations for the SPS Beam Dump Facility
Authors:
Oliver Aberle,
Claudia Ahdida,
Pablo Arrutia,
Kincso Balazs,
Johannes Bernhard,
Markus Brugger,
Marco Calviani,
Yann Dutheil,
Rui Franqueira Ximenes,
Matthew Fraser,
Frederic Galleazzi,
Simone Gilardoni,
Jean-Louis Grenard,
Tina Griesemer,
Richard Jacobsson,
Verena Kain,
Damien Lafarge,
Simon Marsh,
Jose Maria Martin Ruiz,
Ramiro Francisco Mena Andrade,
Yvon Muttoni,
Angel Navascues Cornago,
Pierre Ninin,
John Osborne,
Rebecca Ramjiawan
, et al. (4 additional authors not shown)
Abstract:
As part of the main focus of the BDF Working Group in 2021, this document reports on the study of alternative locations and possible optimisation that may accompany the reuse of existing facilities with the aim of significantly reducing the costs of the facility. Building on the BDF/SHiP Comprehensive Design Study (CDS), the assessment rests on the generic requirements and constraints that allow p…
▽ More
As part of the main focus of the BDF Working Group in 2021, this document reports on the study of alternative locations and possible optimisation that may accompany the reuse of existing facilities with the aim of significantly reducing the costs of the facility. Building on the BDF/SHiP Comprehensive Design Study (CDS), the assessment rests on the generic requirements and constraints that allow preserving the physics reach of the facility by making use of the $4\times 10^{19}$ protons per year at 400\,GeV that are currently not exploited at the SPS and for which no existing facility is compatible. The options considered involve the underground areas TCC4, TNC, and ECN3. Recent improvements of the BDF design at the current location (referred to as `TT90-TCC9-ECN4') are also mentioned together with ideas for yet further improvements. The assessments of the alternative locations compiled the large amount of information that is already available together with a set of conceptual studies that were performed during 2021.
The document concludes with a qualitative comparison of the options, summarising the associated benefits and challenges of each option, such that a recommendation can be made about which location is to be pursued. The most critical location-specific studies required to specify the implementation and cost for each option are identified so that the detailed investigation of the retained option can be completed before the end of 2022.
△ Less
Submitted 7 April, 2022;
originally announced April 2022.
-
Novel Materials and Concepts for Next-Generation High Power Target Applications
Authors:
Kavin Ammigan,
Sujit Bidhar,
Frederique Pellemoine,
Vitaly Pronskikh,
David Pushka,
Katsuya Yonehara,
Robert Zwaska,
Adrien Couet,
Michael Moorehead,
Taku Ishida,
Shunsuke Makimura,
Christopher Densham,
Michael Fitton,
Eric Harvey-Fishenden,
Tristan Davenne,
David Jenkins,
Peter Loveridge,
Joe O'Dell,
Chris Rogers,
Dan Wilcox,
Marco Calviani,
Simone Gilardoni,
Francois-Xavier Nuiry,
Antonio Perillo-Marcone,
Nathan Bultman
, et al. (14 additional authors not shown)
Abstract:
Novel beam-intercepting materials and targetry concepts are essential to improve the performance, reliability and operation lifetimes of next generation multi-megawatt (multi-MW) accelerator target facilities. The beam-intercepting materials and components must sustain an order-of-magnitude increase in particle beam intensities and are beyond the current state-of-the-art. With conventional materia…
▽ More
Novel beam-intercepting materials and targetry concepts are essential to improve the performance, reliability and operation lifetimes of next generation multi-megawatt (multi-MW) accelerator target facilities. The beam-intercepting materials and components must sustain an order-of-magnitude increase in particle beam intensities and are beyond the current state-of-the-art. With conventional materials already limiting the scope of experiments, it is crucial to investigate novel target materials, technologies and concepts that will satisfy the requirements and maximize the physics benefits of future energy and intensity frontier experiments. This paper provides an overview of the related targetry R&D required over the next 10 years to support and enable future high-power accelerator target facilities.
△ Less
Submitted 15 March, 2022;
originally announced March 2022.
-
Irradiation Facilities and Irradiation Methods for High Power Target
Authors:
F. Pellemoine,
C. Barbier,
Y. Sun,
K. Ammigan,
S. Bidhar,
B. Zwaska,
D. McClintock,
S. Taller,
D. Winder,
C. S. Cutler,
D. Kim,
Y. Chiu,
M. Freer,
C. Wheldon,
A. Gottberg,
F. Boix Pamies,
M. Calviani,
N. Charitonidis,
R. Garcia Alia,
F. Ravotti,
S. Danzeca,
A. P. Bernardes,
N. Moncoffre,
S. Meigo,
T. Ishida
, et al. (16 additional authors not shown)
Abstract:
High Power Target systems are key elements in future neutrino and other rare particle production in accelerators. These systems transform an intense source of protons into secondary particles of interest to enable new scientific discoveries. As beam intensity and energies increase, target systems face significant challenges. Radiation damages and thermal shocks in target materials were identified…
▽ More
High Power Target systems are key elements in future neutrino and other rare particle production in accelerators. These systems transform an intense source of protons into secondary particles of interest to enable new scientific discoveries. As beam intensity and energies increase, target systems face significant challenges. Radiation damages and thermal shocks in target materials were identified as the leading cross-cutting challenges of high-power target facilities. Target material R&D to address these challenges are essential to enable and ensure reliable operation of future-generation accelerators. Irradiation facilities and alternative methods are critical to provide a full support of material R&D and better address these critical challenges.
△ Less
Submitted 14 December, 2022; v1 submitted 15 March, 2022;
originally announced March 2022.
-
Modeling Needs for High Power Target
Authors:
Charlotte Barbier,
Sujit Bidhar,
Marco Calviani,
Jeff Dooling,
Jian Gao,
Aaron Jacques,
Wei Lu,
Roberto Li Voti,
Frederique Pellemoine,
Justin Mach,
David Senor,
Fernando Sordo,
Izabela Szlufarska,
Joseph Tipton,
Dan Wilcox,
Drew Winder
Abstract:
The next generation of high power targets will use more complex geometries, novel materials, and new concepts (like flowing granular materials); however, the current numerical approaches will not be sufficient to converge towards a reliable target design that satisfies the physical requirements. We will discuss what can be improved in the next 10 years in target modeling to support high power (MW…
▽ More
The next generation of high power targets will use more complex geometries, novel materials, and new concepts (like flowing granular materials); however, the current numerical approaches will not be sufficient to converge towards a reliable target design that satisfies the physical requirements. We will discuss what can be improved in the next 10 years in target modeling to support high power (MW class) targets.
△ Less
Submitted 9 March, 2022;
originally announced March 2022.
-
Design development and implementation of an irradiation station at the neutron time-of-flight facility at CERN
Authors:
M. Ferrari,
D. Senajova,
O. Aberle,
Y. Aguiar,
D. Baillard,
M. Barbagallo,
A. -P. Bernardes,
L. Buonocore,
M. Cecchetto,
V. Clerc,
M. Di Castro,
R. Garcia Alia,
S. Girod,
J. -L. Grenard,
K. Kershaw,
G. Lerner,
M. Maeder,
A. Makovec,
A. Mengoni,
M. Perez Ornedo,
F. Pozzi,
C. V. Almagro,
M. Calviani
Abstract:
A new parasitic, mixed-field, neutron-dominated irradiation station has been recently commissioned at the European Laboratory for Particle Physics (CERN). The station is installed in the Neutron Time-Of-Flight (n\_TOF) facility, taking advantage of the secondary radiation produced by the neutron spallation target. The new station allows radiation damage studies to be performed in irradiation condi…
▽ More
A new parasitic, mixed-field, neutron-dominated irradiation station has been recently commissioned at the European Laboratory for Particle Physics (CERN). The station is installed in the Neutron Time-Of-Flight (n\_TOF) facility, taking advantage of the secondary radiation produced by the neutron spallation target. The new station allows radiation damage studies to be performed in irradiation conditions that are closer to the ones encountered during the operation of particle accelerators; the irradiation tests carried out in the station will be complementary to the standard tests on materials, usually performed with gamma sources. Samples will be exposed to neutron doses in the MGy range per year, with minimal impact on the n TOF facility operation. The station has twenty-four irradiation positions, each hosting up to 100 cm3 of sample material. In view of its proximity to the n\_TOF target, inside protective shielding, the irradiation station and its operating procedures have been carefully developed taking into account the safety of personnel and to avoid any unwanted impact on the operation of the n\_TOF facility and experiments. Due to the residual radioactivity of the whole area around the n\_TOF target and of the irradiated samples, access to the irradiation station is forbidden to human operators even when the n\_TOF facility is not in operation. Robots are used for the remote installation and retrieval of the samples, and other optimizations of the handling procedures were developed in compliance with radiation protection regulations and the aim of minimizing doses to personnel.
△ Less
Submitted 18 June, 2022; v1 submitted 25 February, 2022;
originally announced February 2022.
-
High intensity proton beam impact at 440 GeV/c on Mo and Cu coated CfC/graphite and SiC/SiC absorbers for beam intercepting devices
Authors:
Jorge Maestre,
Cristina Bahamonde,
Inigo Lamas Garcia,
Keith Kershaw,
Nicolo Biancacci,
Josep Busom,
Matthias Frankl,
Anton Lechner,
Adnan Kurtulus,
Shunsuke Makimura,
Naofumi Nakazato,
Ana Teresa Perez,
Antonio Perillo-Marcone,
Benoit Salvant,
Regis Seidenbinder,
Lorenzo Teofili,
Marco Calviani
Abstract:
Beam Intercepting Devices (BIDs) are essential protection elements for the operation of the Large Hadron Collider (LHC) complex. The LHC internal beam dump (LHC Target Dump Injection or LHC TDI) is the main protection BID of the LHC injection system; its main function is to protect LHC equipment in the event of a malfunction of the injection kicker magnets during beam transfer from the SPS to the…
▽ More
Beam Intercepting Devices (BIDs) are essential protection elements for the operation of the Large Hadron Collider (LHC) complex. The LHC internal beam dump (LHC Target Dump Injection or LHC TDI) is the main protection BID of the LHC injection system; its main function is to protect LHC equipment in the event of a malfunction of the injection kicker magnets during beam transfer from the SPS to the LHC. Several issues with the TDI were encountered during LHC operation, most of them due to outgassing from its core components induced by electron cloud effects, which led to limitations of the injector intensity and hence had an impact on LHC availability. The absorbing cores of the TDIs, and of beam intercepting devices in general, need to deal with high thermo-mechanical loads induced by the high intensity particle beams. In addition, devices such as the TDI - where the absorbing materials are installed close to the beam, are important contributors to the accelerator impedance budget. To reduce impedance, the absorbing materials that make up the core must be typically coated with high electrical conductivity metals. Beam impact testing of the coated absorbers is a crucial element of development work to ensure their correct operation. The behaviour of several metal-coated absorber materials was investigated when exposed to high intensity and high energy proton beams in the HiRadMat facility at CERN. Different coating configurations based on copper and molybdenum, and absorbing materials such as isostatic graphite, Carbon Fibre Composite (CfC) and Silicon Carbide reinforced with Silicon Carbide fibres (SiC-SiC), were tested in the facility to assess the TDI's performance and to extract information for other BIDs using these materials. In addition to beam impact tests and an extensive Post Irradiation Examination (PIE) campaign, extensive numerical simulations were carried out.
△ Less
Submitted 22 December, 2021; v1 submitted 9 December, 2021;
originally announced December 2021.
-
Design and behaviour of the Large Hadron Collider external beam dumps capable of receiving 539 MJ/dump
Authors:
J. Maestre,
C. Torregrosa,
K. Kershaw,
C. Bracco,
T. Coiffet,
M. Ferrari,
R. Franqueira Ximenes,
S. Gilardoni,
D. Grenier,
A. Lechner,
V. Maire,
J. M. Martin Ruiz,
E. Matheson,
N. Solieri,
A. Perillo Marcone,
T. Polzin,
V. Rizzoglio,
D. Senajova,
C. Sharp,
M. Timmins,
M. Calviani
Abstract:
Two 6-t beam dumps, made of a graphite core encapsulated in a stainless steel vessel, are used to absorb the energy of the two Large Hadron Collider (LHC) intense proton beams during operation of the accelerator. Operational issues started to appear in 2015 during LHC Run 2 (2014-2018) as a consequence of the progressive increase of the LHC beam kinetic energy, necessitating technical intervention…
▽ More
Two 6-t beam dumps, made of a graphite core encapsulated in a stainless steel vessel, are used to absorb the energy of the two Large Hadron Collider (LHC) intense proton beams during operation of the accelerator. Operational issues started to appear in 2015 during LHC Run 2 (2014-2018) as a consequence of the progressive increase of the LHC beam kinetic energy, necessitating technical interventions in the highly radioactive areas around the dumps. Nitrogen gas leaks appeared after highly energetic beam impacts and instrumentation measurements indicated an initially unforeseen movement of the dumps. A computer modelling analysis campaign was launched to understand the origin of these issues, including both Monte Carlo simulations to model the proton beam interaction as well as advanced thermo-mechanical analyses. The main findings were that the amount of instantaneous energy deposited in the dump vessel leads to a strong dynamic response of the whole dump and high accelerations (above 2000g). Based on these findings, an upgraded design, including a new support system and beam windows, was implemented to ensure the dumps' compatibility with the more intense beams foreseen during LHC Run 3 (2022-2025) of 539 MJ per beam. In this paper an integral overview of the operational behaviour of the dumps and the upgraded configurations are discussed.
△ Less
Submitted 27 October, 2021; v1 submitted 17 October, 2021;
originally announced October 2021.
-
Design of the third-generation lead-based neutron spallation target for the neutron time-of-flight facility at CERN
Authors:
Raffaele Esposito,
Marco Calviani,
Oliver Aberle,
Massimo Barbagallo,
Daniel Cano-Ott,
Nicola Colonna,
Thibaut Coiffet,
César Domingo-Pardo,
Francesco Dragoni,
Rui Franqueira Ximenes,
Laurene Giordanino,
Damien Grenier,
Frank Gunsing,
Keith Kershaw,
Roland Logé,
Vincent Maire,
Pierre Moyret,
Ana Teresa Perez Fontenla,
Antonio Perillo-Marcone,
Fabio Pozzi,
Stefano Sgobba,
Marc Timmins,
Vasilis Vlachoudis
Abstract:
The neutron time-of-flight (n_TOF) facility at the European Laboratory for Particle Physics (CERN) is a pulsed white-spectrum neutron spallation source producing neutrons for two experimental areas: the Experimental Area 1 (EAR1), located 185 m horizontally from the target, and the Experimental Area 2 (EAR2), located 20 m above the target. The target, based on pure lead, is impacted by a high-inte…
▽ More
The neutron time-of-flight (n_TOF) facility at the European Laboratory for Particle Physics (CERN) is a pulsed white-spectrum neutron spallation source producing neutrons for two experimental areas: the Experimental Area 1 (EAR1), located 185 m horizontally from the target, and the Experimental Area 2 (EAR2), located 20 m above the target. The target, based on pure lead, is impacted by a high-intensity 20-GeV/c pulsed proton beam. The facility was conceived to study neutron-nucleus interactions for neutron kinetic energies between a few meV to several GeV, with applications of interest for nuclear astrophysics, nuclear technology, and medical research. After the second-generation target reached the end of its lifetime, the facility underwent a major upgrade during CERN's Long Shutdown 2 (LS2, 2019-2021), which included the installation of the new third-generation neutron target. The first and second-generation targets were based on water-cooled massive lead blocks and were designed focusing on EAR1, since EAR2 was built later. The new target is cooled by nitrogen gas to avoid erosion-corrosion and contamination of cooling water with radioactive lead spallation products. Moreover, the new design is optimized also for the vertical flight path and EAR2. This paper presents an overview of the target design focused on both physics and thermo-mechanical performance, and includes a description of the nitrogen cooling circuit and radiation protection studies.
△ Less
Submitted 14 August, 2021; v1 submitted 21 June, 2021;
originally announced June 2021.
-
Imaging neutron capture cross sections: i-TED proof-of-concept and future prospects based on Machine-Learning techniques
Authors:
V. Babiano-Suárez,
J. Lerendegui-Marco,
J. Balibrea-Correa,
L. Caballero,
D. Calvo,
I. Ladarescu,
C. Domingo-Pardo,
F. Calviño,
A. Casanovas,
A. Tarifeño-Saldivia,
V. Alcayne,
C. Guerrero,
M. A. Millán-Callado,
M. T. Rodríguez González,
M. Barbagallo,
O. Aberle,
S. Amaducci,
J. Andrzejewski,
L. Audouin,
M. Bacak,
S. Bennett,
E. Berthoumieux,
J. Billowes,
D. Bosnar,
A. Brown
, et al. (110 additional authors not shown)
Abstract:
i-TED is an innovative detection system which exploits Compton imaging techniques to achieve a superior signal-to-background ratio in ($n,γ$) cross-section measurements using time-of-flight technique. This work presents the first experimental validation of the i-TED apparatus for high-resolution time-of-flight experiments and demonstrates for the first time the concept proposed for background reje…
▽ More
i-TED is an innovative detection system which exploits Compton imaging techniques to achieve a superior signal-to-background ratio in ($n,γ$) cross-section measurements using time-of-flight technique. This work presents the first experimental validation of the i-TED apparatus for high-resolution time-of-flight experiments and demonstrates for the first time the concept proposed for background rejection. To this aim both $^{197}$Au($n,γ$) and $^{56}$Fe($n, γ$) reactions were measured at CERN n\_TOF using an i-TED demonstrator based on only three position-sensitive detectors. Two \cds detectors were also used to benchmark the performance of i-TED. The i-TED prototype built for this study shows a factor of $\sim$3 higher detection sensitivity than state-of-the-art \cds detectors in the $\sim$10~keV neutron energy range of astrophysical interest. This paper explores also the perspectives of further enhancement in performance attainable with the final i-TED array consisting of twenty position-sensitive detectors and new analysis methodologies based on Machine-Learning techniques.
△ Less
Submitted 18 December, 2020;
originally announced December 2020.
-
Hot Isostatic Pressing (HIP) assisted diffusion bonding between CuCr1Zr and AISI 316L for application to the Super Proton Synchrotron (SPS) internal beam dump at CERN
Authors:
Stefano Pianese,
Antonio Perillo-Marcone,
François-Xavier Nuiry,
Marco Calviani,
Krzysztof Adam Szczurek,
Gonzalo Arnau Izquierdo,
Pietro Avigni,
Simon Bonnin,
Josep Busom Descarrega,
Thierry Feniet,
Keith Kershaw,
Jerome Lendaro,
Ana Teresa Perez Fontenla,
Thomas Schubert,
Thomas Weissgärber
Abstract:
The new generation internal beam dump of the Super Proton Synchrotron (SPS) at CERN will have to dissipate approximately 270 kW of thermal power, deposited by the primary proton beam. For this purpose, it is essential that the cooling system features a very efficient heat evacuation. Diffusion bonding assisted by Hot Isostatic Pressing (HIP) was identified as a promising method of joining the cool…
▽ More
The new generation internal beam dump of the Super Proton Synchrotron (SPS) at CERN will have to dissipate approximately 270 kW of thermal power, deposited by the primary proton beam. For this purpose, it is essential that the cooling system features a very efficient heat evacuation. Diffusion bonding assisted by Hot Isostatic Pressing (HIP) was identified as a promising method of joining the cooling circuits and the materials of the dump's core in order to maximise the heat transfer efficiency. This paper presents the investigation of HIP assisted diffusion bonding between two CuCr1Zr blanks enclosing SS 316L tubes and the realisation of a real size prototype of one of the dump's cooling plate, as well as the assessments of its cooling performance under the dumps most critical operational scenarios. Energy-dispersive X-ray (EDX) spectroscopy, microstructural analyses, measurements of thermal conductivity and mechanical strength were performed to characterize the HIP diffusion bonded interfaces (CuCr1Zr-CuCr1Zr and CuCr1Zr-SS316L). A test bench allowed to assess the cooling performance of the real size prototype. At the bonded interface, the presence of typical diffusional phenomena was observed. Moreover, measured tensile strength and thermal conductivity were at least equivalent to the lowest ones of the materials assembled and comparable to its bulk properties, meaning that a good bonding quality was achieved. Finally, the real size prototype was successfully tested with an ad-hoc thermal test bench and with the highest operational thermal power expected in the new generation SPS internal beam dump.
△ Less
Submitted 16 November, 2020;
originally announced November 2020.
-
The hadronic beamline of the ENUBET neutrino beam
Authors:
ENUBET collaboration,
C. Delogu,
F. Acerbi,
A. Berra,
M. Bonesini,
A. Branca,
C. Brizzolari,
G. Brunetti,
M. Calviani,
S. Capelli,
S. Carturan,
M. G. Catanesi,
S. Cecchini,
N. Charitonidis,
F. Cindolo,
G. Collazuol,
E. Conti,
F. Dal Corso,
G. De Rosa,
A. Falcone,
A. Gola,
C. Jollet,
V. Kain,
B. Klicek,
Y. Kudenko
, et al. (35 additional authors not shown)
Abstract:
The ENUBET ERC project (2016-2021) is studying a facility based on a narrow band beam capable of constraining the neutrino fluxes normalization through the monitoring of the associated charged leptons in an instrumented decay tunnel. A key element of the project is the design and optimization of the hadronic beamline. In this proceeding we present progress on the studies of the proton extraction s…
▽ More
The ENUBET ERC project (2016-2021) is studying a facility based on a narrow band beam capable of constraining the neutrino fluxes normalization through the monitoring of the associated charged leptons in an instrumented decay tunnel. A key element of the project is the design and optimization of the hadronic beamline. In this proceeding we present progress on the studies of the proton extraction schemes. We also show a realistic implementation and simulation of the beamline.
△ Less
Submitted 26 November, 2020; v1 submitted 7 April, 2020;
originally announced April 2020.
-
Decay tunnel instrumentation for the ENUBET neutrino beam
Authors:
F. Acerbi,
A. Berra,
M. Bonesini,
A. Branca,
C. Brizzolari,
G. Brunetti,
M. Calviani,
S. Capelli,
S. Carturan,
M. G. Catanesi,
S. Cecchini,
N. Charitonidis,
F. Cindolo,
G. Collazuol,
E. Conti,
F. Dal Corso,
C. Delogu,
G. De Rosa,
A. Falcone,
A. Gola,
C. Jollet,
V. Kain,
B. Klicek,
Y. Kudenko,
M. Laveder
, et al. (34 additional authors not shown)
Abstract:
The uncertainty in the initial neutrino flux is the main limitation for a precise determination of the absolute neutrino cross section. The ERC funded ENUBET project (2016-2021) is studying a facility based on a narrow band beam to produce an intense source of electron neutrinos with a ten-fold improvement in accuracy. Since March 2019 ENUBET is also a Neutrino Platform experiment at CERN: NP06/EN…
▽ More
The uncertainty in the initial neutrino flux is the main limitation for a precise determination of the absolute neutrino cross section. The ERC funded ENUBET project (2016-2021) is studying a facility based on a narrow band beam to produce an intense source of electron neutrinos with a ten-fold improvement in accuracy. Since March 2019 ENUBET is also a Neutrino Platform experiment at CERN: NP06/ENUBET. A key element of the project is the instrumentation of the decay tunnel to monitor large angle positrons produced together with $ν_e$ in the three body decays of kaons ($K_{e3}$) and to discriminate them from neutral and charged pions. The need for an efficient and high purity e/$π$ separation over a length of several meters, and the requirements for fast response and radiation hardness imposed by the harsh beam environment, suggested the implementation of a longitudinally segmented Fe/scintillator calorimeter with a readout based on WLS fibers and SiPM detectors. An extensive experimental program through several test beam campaigns at the CERN-PS T9 beam line has been pursued on calorimeter prototypes, both with a shashlik and a lateral readout configuration. The latter, in which fibers collect the light from the side of the scintillator tiles, allows to place the light sensors away from the core of the calorimeter, thus reducing possible irradiation damages with respect to the shashlik design. This contribution will present the achievements of the prototyping activities carried out, together with irradiation tests made on the Silicon Photo-Multipliers. The results achieved so far pin down the technology of choice for the construction of the 3 m long demonstrator that will take data in 2021.
△ Less
Submitted 6 April, 2020;
originally announced April 2020.
-
SND@LHC
Authors:
SHiP Collaboration,
C. Ahdida,
A. Akmete,
R. Albanese,
A. Alexandrov,
M. Andreini,
A. Anokhina,
S. Aoki,
G. Arduini,
E. Atkin,
N. Azorskiy,
J. J. Back,
A. Bagulya,
F. Baaltasar Dos Santos,
A. Baranov,
F. Bardou,
G. J. Barker,
M. Battistin,
J. Bauche,
A. Bay,
V. Bayliss,
G. Bencivenni,
A. Y. Berdnikov,
Y. A. Berdnikov,
M. Bertani
, et al. (319 additional authors not shown)
Abstract:
We propose to build and operate a detector that, for the first time, will measure the process $pp\toνX$ at the LHC and search for feebly interacting particles (FIPs) in an unexplored domain. The TI18 tunnel has been identified as a suitable site to perform these measurements due to very low machine-induced background. The detector will be off-axis with respect to the ATLAS interaction point (IP1)…
▽ More
We propose to build and operate a detector that, for the first time, will measure the process $pp\toνX$ at the LHC and search for feebly interacting particles (FIPs) in an unexplored domain. The TI18 tunnel has been identified as a suitable site to perform these measurements due to very low machine-induced background. The detector will be off-axis with respect to the ATLAS interaction point (IP1) and, given the pseudo-rapidity range accessible, the corresponding neutrinos will mostly come from charm decays: the proposed experiment will thus make the first test of the heavy flavour production in a pseudo-rapidity range that is not accessible by the current LHC detectors. In order to efficiently reconstruct neutrino interactions and identify their flavour, the detector will combine in the target region nuclear emulsion technology with scintillating fibre tracking layers and it will adopt a muon identification system based on scintillating bars that will also play the role of a hadronic calorimeter. The time of flight measurement will be achieved thanks to a dedicated timing detector. The detector will be a small-scale prototype of the scattering and neutrino detector (SND) of the SHiP experiment: the operation of this detector will provide an important test of the neutrino reconstruction in a high occupancy environment.
△ Less
Submitted 20 February, 2020;
originally announced February 2020.
-
SPS Beam Dump Facility -- Comprehensive Design Study
Authors:
C. Ahdida,
R. G. Alia,
G. Arduini,
A. Arnalich,
P. Avigni,
F. Bardou,
M. Battistin,
J. Bauche,
M. Brugger,
J. Busom,
M. Calviani,
M. Casolino,
N. Colonna,
L. Dougherty,
Y. Dutheil,
E. Fornasiere,
M. A. Fraser,
L. Gatignon,
J. Gall,
S. Gilardoni,
B. Goddard,
J-L. Grenard,
D. Grenier,
C. Hessler,
R. Jacobsson
, et al. (23 additional authors not shown)
Abstract:
The proposed Beam Dump Facility (BDF) is foreseen to be located at the North Area of the SPS. It is designed to be able to serve both beam dump like and fixed target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector…
▽ More
The proposed Beam Dump Facility (BDF) is foreseen to be located at the North Area of the SPS. It is designed to be able to serve both beam dump like and fixed target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector models, and flavour physics measurements. In the first instance, exploitation of the facility, in beam dump mode, is envisaged to be for the Search for Hidden Particle (SHiP) experiment.
Following the first evaluation of the BDF in 2014-2016, CERN management launched a Comprehensive Design Study over three years for the facility. The BDF study team has since executed an in-depth feasibility study of proton delivery to target, the target complex, and the underground experimental area, including prototyping of key sub-systems and evaluations of the radiological aspects and safety. A first iteration of detailed integration and civil engineering studies have been performed in order to produce a realistic schedule and cost. This document gives a detailed overview of the proposed facility together with the results of the studies, and draws up a possible road map for a three-year Technical Design Report phase, followed by a 5 to 6 year construction phase.
△ Less
Submitted 13 December, 2019;
originally announced December 2019.
-
Radiation Damage Studies on Titanium Alloys as High Intensity Proton Accelerator Beam Window Materials
Authors:
Taku Ishida,
Eiichi Wakai,
Shunsuke Makimura,
Patrick G. Hurh,
Kavin Ammigan,
Andrew M. Casella,
Danny J. Edwards,
David J. Senor,
Christopher J. Densham,
Michael Fitton,
Joe Bennett,
Dohyun Kim,
Nikolaos Simos,
Marco Calviani,
Claudio Torregrosa Martin
Abstract:
A high-strength dual alpha+beta phase titanium alloy Ti-6Al-4V is utilized as a material for beam windows in several accelerator target facilities. However, relatively little is known about how material properties of this alloy are affected by high-intensity proton beam irradiation. With plans to upgrade neutrino facilities at J-PARC and Fermilab to over 1 MW beam power, the radiation damage in th…
▽ More
A high-strength dual alpha+beta phase titanium alloy Ti-6Al-4V is utilized as a material for beam windows in several accelerator target facilities. However, relatively little is known about how material properties of this alloy are affected by high-intensity proton beam irradiation. With plans to upgrade neutrino facilities at J-PARC and Fermilab to over 1 MW beam power, the radiation damage in the window material will reach a few displacements per atom (dpa) per year, significantly above the ~0.3 dpa level of existing data. The RaDIATE collaboration has conducted a high intensity proton beam irradiation of various target and window material specimens at BLIP facility, including a variety of titanium alloys. Post-Irradiation Examination of the specimens in the 1st capsule, irradiated at up to 0.25 dpa, is in progress. Tensile tests in a hot cell at PNNL exhibited a clear signature of radiation hardening and loss of ductility for Ti-6Al-4V, while Ti-3Al-2.5V, with less beta phase, exhibited less severe hardening. Microstructural investigations will follow to study the cause of the difference in tensile behavior between these alloys. High-cycle fatigue (HCF) performance is critical to the lifetime estimation of beam windows exposed to a periodic thermal stress from a pulsed proton beam. The 1st HCF data on irradiated titanium alloys are to be obtained by a conventional bend fatigue test at Fermilab and by an ultrasonic mesoscale fatigue test at Culham Laboratory. Specimens in the 2nd capsule, irradiated at up to ~1 dpa, cover typical titanium alloy grades, including possible radiation-resistant candidates. These systematic studies on the effects of radiation damage of titanium alloys are intended to enable us to predict realistic lifetimes of current beam windows made of Ti-6Al-4V and to extend the lifetime by choosing a more radiation and thermal shock tolerant alloy.
△ Less
Submitted 22 November, 2019;
originally announced November 2019.
-
Review and new concepts for neutron-capture measurements of astrophysical interest
Authors:
C. Domingo-Pardo,
V. Babiano-Suarez,
J. Balibrea-Correa,
L. Caballero,
I. Ladarescu,
J. Lerendegui-Marco,
J. L. Tain,
F. Calviño,
A. Casanovas,
A. Segarra,
A. E. Tarifeño-Saldivia,
C. Guerrero,
M. A. Millán-Callado,
J. M. Quesada,
M. T. Rodríguez-González,
O. Aberle,
V. Alcayne,
S. Amaducci,
J. Andrzejewski,
L. Audouin,
M. Bacak,
M. Barbagallo,
S. Bennett,
E. Berthoumieux,
D. Bosnar
, et al. (106 additional authors not shown)
Abstract:
The idea of slow-neutron capture nucleosynthesis formulated in 1957 triggered a tremendous experimental effort in different laboratories worldwide to measure the relevant nuclear physics input quantities, namely ($n,γ$) cross sections over the stellar temperature range (from few eV up to several hundred keV) for most of the isotopes involved from Fe up to Bi. A brief historical review focused on t…
▽ More
The idea of slow-neutron capture nucleosynthesis formulated in 1957 triggered a tremendous experimental effort in different laboratories worldwide to measure the relevant nuclear physics input quantities, namely ($n,γ$) cross sections over the stellar temperature range (from few eV up to several hundred keV) for most of the isotopes involved from Fe up to Bi. A brief historical review focused on total energy detectors will be presented to illustrate how, advances in instrumentation have led, over the years, to the assessment and discovery of many new aspects of $s$-process nucleosynthesis and to the progressive refinement of theoretical models of stellar evolution. A summary will be presented on current efforts to develop new detection concepts, such as the Total-Energy Detector with $γ$-ray imaging capability (i-TED). The latter is based on the simultaneous combination of Compton imaging with neutron time-of-flight (TOF) techniques, in order to achieve a superior level of sensitivity and selectivity in the measurement of stellar neutron capture rates.
△ Less
Submitted 16 November, 2019;
originally announced November 2019.
-
Design and operation of the air-cooled beam dump for the extraction line of CERN's Proton Synchrotron Booster (PSB)
Authors:
Antonio Perillo-Marcone,
Marco Calviani,
Nicola Solieri,
Alessia Ciccotelli,
Paul Kaiser,
Alba Sarrio,
Valentina Venturi,
Vasilis Vlachoudis
Abstract:
A new beam dump has been designed, built, installed and operated to withstand the future proton beam extracted from the Proton Synchrotron Booster (PSB) in the framework of the LHC Injector Upgrade (LIU) Project at CERN, consisting of up to 1E14 protons per pulse at 2 GeV, foreseen after the machine upgrades planned for CERN's Long Shutdown 2 (2019-2020). In order to be able to efficiently dissipa…
▽ More
A new beam dump has been designed, built, installed and operated to withstand the future proton beam extracted from the Proton Synchrotron Booster (PSB) in the framework of the LHC Injector Upgrade (LIU) Project at CERN, consisting of up to 1E14 protons per pulse at 2 GeV, foreseen after the machine upgrades planned for CERN's Long Shutdown 2 (2019-2020). In order to be able to efficiently dissipate the heat deposited by the primary beam, the new dump was designed as a cylindrical block assembly, made out of a copper alloy and cooled by forced airflow. In order to determine the energy density distribution deposited by the beam in the dump, Monte Carlo simulations were performed using the FLUKA code, and thermo-mechanical analyses were carried out by importing the energy density into ANSYS. In addition, Computational Fluid Dynamics (CFD) simulations of the airflow were performed in order to accurately estimate the heat transfer convection coefficient on the surface of the dump. This paper describes the design process, highlights the constraints and challenges of integrating a new dump for increased beam power into the existing facility and provides data on the operation of the dump.
△ Less
Submitted 20 May, 2020; v1 submitted 18 October, 2019;
originally announced October 2019.
-
Design of a Helium Passivation System for the Target Vessel of the Beam Dump Facility at CERN
Authors:
P. Avigni,
M. Battistin,
M. Calviani,
P. Dalakov,
K. Kershaw,
J. Klier,
M. Lamont,
E. Lopez Sola,
J. M. Martin Ruiz
Abstract:
The Beam Dump Facility (BDF) is a proposed general-purpose facility at CERN, dedicated to fixed target and beam dump experiments, currently being developed in the context of the Physics Beyond Colliders program. The design of the facility will allow to host different types of experiments, of which SHiP is planned to be the initial one. The core of the facility is a high-density target/dump absorbi…
▽ More
The Beam Dump Facility (BDF) is a proposed general-purpose facility at CERN, dedicated to fixed target and beam dump experiments, currently being developed in the context of the Physics Beyond Colliders program. The design of the facility will allow to host different types of experiments, of which SHiP is planned to be the initial one. The core of the facility is a high-density target/dump absorbing the full intensity of the SPS beam and generating a cascade of particles that are detected downstream the target complex. The target and its shielding blocks are positioned inside a vessel, which is planned to be passivized with helium, in order to reduce the activation of the gas surrounding the target and to extend the operational life of materials and equipment. The passivation system that will be in charge of purifying and circulating the helium is a critical component for the operation of the facility. Fluid dynamics simulations have been performed to study the circulation of the helium through the vessel. A detailed design of the helium passivation system and its main components has been developed.
△ Less
Submitted 18 November, 2019; v1 submitted 1 October, 2019;
originally announced October 2019.
-
Beam impact tests of a prototype target for the Beam Dump Facility at CERN: experimental setup and preliminary analysis of the online results
Authors:
E. Lopez Sola,
M. Calviani,
O. Aberle,
C. Ahdida,
P. Avigni,
M. Battistin,
L. Bianchi,
S. Burger,
J. Busom Descarrega,
J. Canhoto Espadanal,
E. Cano-Pleite,
M. Casolino,
M. A. Fraser,
S. Gilardoni,
S. Girod,
J-L. Grenard,
D. Grenier,
M. Guinchard,
C. Hessler,
R. Jacobsson,
M. Lamont,
A. Ortega Rolo,
M. Pandey,
A. Perillo-Marcone,
B. Riffaud
, et al. (2 additional authors not shown)
Abstract:
The Beam Dump Facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first aim of the facility is to search for Light Dark Matter and Hidden Sector models with the Search for Hidden Particles (SHiP) experiment. At the core of the facility sits a dense target/dump, whose function is to absorb safe…
▽ More
The Beam Dump Facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first aim of the facility is to search for Light Dark Matter and Hidden Sector models with the Search for Hidden Particles (SHiP) experiment. At the core of the facility sits a dense target/dump, whose function is to absorb safely the 400 GeV/c Super Proton Synchrotron (SPS) beam and to maximize the production of charm and beauty mesons. An average power of 300 kW will be deposited on the target, which will be subjected to unprecedented conditions in terms of temperature, structural loads and irradiation. In order to provide a representative validation of the target design, a prototype target has been designed, manufactured and tested under the SPS fixed-target proton beam during 2018, up to an average beam power of 50 kW, corresponding to 350 kJ per pulse. The present contribution details the target prototype design and experimental setup, as well as a first evaluation of the measurements performed during beam irradiation. The analysis of the collected data suggests that a representative reproduction of the operational conditions of the Beam Dump Facility target was achieved during the prototype tests, which will be complemented by a Post Irradiation Examination campaign during 2020.
△ Less
Submitted 20 November, 2019; v1 submitted 16 September, 2019;
originally announced September 2019.
-
Development of a neutron imaging station at the n\_TOF facility of CERN and applications to beam intercepting devices
Authors:
Federica Mingrone,
Marco Calviani,
Claudio Torregrosa Martin,
Oliver Aberle,
Michael Bacak,
Enrico Chiaveri,
Elvis Fornasiere,
Antonio Perillo-Marcone,
Vasilis Vlachoudis
Abstract:
A neutron radiography testing station has been developed exploiting the neutron beam of CERN's n\_TOF Experimental Area 2, located at the shortest distance to the neutron producing-target. The characteristics of the n\_TOF neutron beam for the imaging setup are presented in this paper, together with the obtained experimental results. The possible developments of neutron imaging capabilities of the…
▽ More
A neutron radiography testing station has been developed exploiting the neutron beam of CERN's n\_TOF Experimental Area 2, located at the shortest distance to the neutron producing-target. The characteristics of the n\_TOF neutron beam for the imaging setup are presented in this paper, together with the obtained experimental results. The possible developments of neutron imaging capabilities of the n\_TOF facility in terms of detection-systems and beam-line upgrades are as well outlined.
△ Less
Submitted 30 April, 2019;
originally announced May 2019.
-
Full Scale Proton Beam Impact Testing of new CERN Collimators and Validation of a Numerical Approach for Future Operation
Authors:
M. Bergeret,
F-X. Nuiry,
M. Calviani,
M. A. Fraser,
M. Butcher,
L-M. Grec,
L. Gentini,
A. Lechner,
M. Frankl,
V. Rizzoglio,
S. Burger,
A. Cherif
Abstract:
New collimators are being produced at CERN in the framework of a large particle accelerator upgrade project to protect beam lines against stray particles. Their movable jaws hold low density absorbers with tight geometric requirements, while being able to withstand direct proton beam impacts. Such events induce considerable thermo-mechanical loads, leading to complex structural responses, which ma…
▽ More
New collimators are being produced at CERN in the framework of a large particle accelerator upgrade project to protect beam lines against stray particles. Their movable jaws hold low density absorbers with tight geometric requirements, while being able to withstand direct proton beam impacts. Such events induce considerable thermo-mechanical loads, leading to complex structural responses, which make the numerical analysis challenging. Hence, an experiment has been developed to validate the jaw design under representative conditions and to acquire online results to enhance the numerical models. Two jaws have been impacted by high-intensity proton beams in a dedicated facility at CERN and have recreated the worst possible scenario in future operation. The analysis of online results coupled to post-irradiation examinations have demonstrated that the jaw response remains in the elastic domain. However, they have also highlighted how sensitive the jaw geometry is to its mounting support inside the collimator. Proton beam impacts, as well as handling activities, may alter the jaw flatness tolerance value by $\pm$ 70 $μ$m, whereas the flatness tolerance requirement is 200 $μ$m. In spite of having validated the jaw design for this application, the study points out numerical limitations caused by the difficulties in describing complex geometries and boundary conditions with such unprecedented requirements.
△ Less
Submitted 26 April, 2019;
originally announced April 2019.
-
Design of a high power production target for the Beam Dump Facility at CERN
Authors:
E. Lopez Sola,
M. Calviani,
P. Avigni,
M. Battistin,
J. Busom Descarrega,
J. Canhoto Espadanal,
M. A. Fraser,
S. Gilardoni,
B. Goddard,
D. Grenier,
R. Jacobsson,
K. Kershaw,
M. Lamont,
A. Perillo-Marcone,
M. Pandey,
B. Riffaud,
S. Sgobba,
V. Vlachoudis,
L. Zuccalli
Abstract:
The Beam Dump Facility (BDF) project is a proposed general-purpose facility at CERN, dedicated to beam dump and fixed target experiments. In its initial phase, the facility is foreseen to be exploited by the Search for Hidden Particles (SHiP) experiment. Physics requirements call for a pulsed 400 GeV/c proton beam as well as the highest possible number of protons on target (POT) each year of opera…
▽ More
The Beam Dump Facility (BDF) project is a proposed general-purpose facility at CERN, dedicated to beam dump and fixed target experiments. In its initial phase, the facility is foreseen to be exploited by the Search for Hidden Particles (SHiP) experiment. Physics requirements call for a pulsed 400 GeV/c proton beam as well as the highest possible number of protons on target (POT) each year of operation, in order to search for feebly interacting particles. The target/dump assembly lies at the heart of the facility, with the aim of safely absorbing the full high intensity Super Proton Synchrotron (SPS) beam, while maximizing the production of charmed and beauty mesons. High-Z materials are required for the target/dump, in order to have the shortest possible absorber and reduce muon background for the downstream experiment. The high average power deposited on target (305 kW) creates a challenge for heat removal. During the BDF facility Comprehensive Design Study (CDS), launched by CERN in 2016, extensive studies have been carried out in order to define and assess the target assembly design. These studies are described in the present contribution, which details the proposed design of the BDF production target, as well as the material selection process and the optimization of the target configuration and beam dilution. One of the specific challenges and novelty of this work is the need to consider new target materials, such as a molybdenum alloy (TZM) as core absorbing material and Ta2.5W as cladding. Thermo-structural and fluid dynamics calculations have been performed to evaluate the reliability of the target and its cooling system under beam operation. In the framework of the target comprehensive design, a preliminary mechanical design of the full target assembly has also been carried out, assessing the feasibility of the whole target system.
△ Less
Submitted 30 October, 2019; v1 submitted 5 April, 2019;
originally announced April 2019.
-
The ENUBET narrow band neutrino beam
Authors:
ENUBET Collaboration,
M. Tenti,
F. Acerbi,
G. Ballerini,
M. Bonesini,
C. Brizzolari,
G. Brunetti M. Calviani,
S. Carturan,
M. G. Catanesi,
S. Cecchini,
F. Cindolo,
G. Collazuol,
E. Conti F. Dal Corso,
G. De Rosa,
C. Delogu,
A. Falcone,
B. Goddard,
A. Gola,
R. A. Intonti,
C. Jollet,
V. Kain,
B. Klicek,
Y. Kudenko,
M. Laveder,
A. Longhin
, et al. (32 additional authors not shown)
Abstract:
The narrow band beam of ENUBET is the first implementation of the "monitored neutrino beam" technique proposed in 2015. ENUBET has been designed to monitor lepton production in the decay tunnel of neutrino beams and to provide a 1% measurement of the neutrino flux at source. In particular, the three body semi-leptonic decay of kaons monitored by large angle positron production offers a fully contr…
▽ More
The narrow band beam of ENUBET is the first implementation of the "monitored neutrino beam" technique proposed in 2015. ENUBET has been designed to monitor lepton production in the decay tunnel of neutrino beams and to provide a 1% measurement of the neutrino flux at source. In particular, the three body semi-leptonic decay of kaons monitored by large angle positron production offers a fully controlled $ν_{e}$ source at the GeV scale for a new generation of short baseline experiments. In this contribution the performances of the positron tagger prototypes tested at CERN beamlines in 2016-2018 are presented.
△ Less
Submitted 27 March, 2019;
originally announced March 2019.
-
The ENUBET Beamline
Authors:
ENUBET Collaboration,
G. Brunetti,
F. Acerbi,
G. Ballerini,
M. Bonesini,
A. Branca,
C. Brizzolari,
M. Calviani,
S. Carturan,
M. G. Catanesi,
S. Cecchini,
F. Cindolo,
G. Collazuol,
E. Conti,
F. Dal Corso,
G. De Rosa,
C. Delogu,
A. Falcone,
B. Goddard,
A. Gola,
R. A. Intonti,
C. Jollet,
V. Kain,
B. Klicek,
Y. Kudenko
, et al. (34 additional authors not shown)
Abstract:
The ENUBET ERC project (2016-2021) is studying a narrow band neutrino beam where lepton production can be monitored at single particle level in an instrumented decay tunnel. This would allow to measure $ν_μ$ and $ν_{e}$ cross sections with a precision improved by about one order of magnitude compared to present results. In this proceeding we describe a first realistic design of the hadron beamline…
▽ More
The ENUBET ERC project (2016-2021) is studying a narrow band neutrino beam where lepton production can be monitored at single particle level in an instrumented decay tunnel. This would allow to measure $ν_μ$ and $ν_{e}$ cross sections with a precision improved by about one order of magnitude compared to present results. In this proceeding we describe a first realistic design of the hadron beamline based on a dipole coupled to a pair of quadrupole triplets along with the optimisation guidelines and the results of a simulation based on G4beamline. A static focusing design, though less efficient than a horn-based solution, results several times more efficient than originally expected. It works with slow proton extractions reducing drastically pile-up effects in the decay tunnel and it paves the way towards a time-tagged neutrino beam. On the other hand a horn-based transferline would ensure higher yields at the tunnel entrance. The first studies conducted at CERN to implement the synchronization between a few ms proton extraction and a horn pulse of 2-10 ms are also described.
△ Less
Submitted 26 November, 2020; v1 submitted 21 March, 2019;
originally announced March 2019.
-
Summary Report of Physics Beyond Colliders at CERN
Authors:
R. Alemany,
C. Burrage,
H. Bartosik,
J. Bernhard,
J. Boyd,
M. Brugger,
M. Calviani,
C. Carli,
N. Charitonidis,
D. Curtin,
A. Dainese,
A. de Roeck,
M. Diehl,
B. Döbrich,
L. Evans,
J. L. Feng,
M. Ferro-Luzzi,
L. Gatignon,
S. Gilardoni,
S. Gninenko,
G. Graziani,
E. Gschwendtner,
B. Goddard,
A. Hartin,
I. Irastorza
, et al. (39 additional authors not shown)
Abstract:
Physics Beyond Colliders is an exploratory study aimed at exploiting the full scientific potential of CERN's accelerator complex and its scientific infrastructure in the next two decades through projects complementary to the LHC, HL-LHC and other possible future colliders. These projects should target fundamental physics questions that are similar in spirit to those addressed by high-energy collid…
▽ More
Physics Beyond Colliders is an exploratory study aimed at exploiting the full scientific potential of CERN's accelerator complex and its scientific infrastructure in the next two decades through projects complementary to the LHC, HL-LHC and other possible future colliders. These projects should target fundamental physics questions that are similar in spirit to those addressed by high-energy colliders, but that require different types of beams and experiments. A kick-off workshop held in September 2016 identified a number of areas of interest and working groups have been set-up to study and develop these directions. All projects currently under consideration are presented including physics motivation, a brief outline of the experimental set-up and the status of the corresponding beam and detector technological studies. The proposals are also put in context of the worldwide landscape and their implementation issues are discussed.
△ Less
Submitted 1 February, 2019;
originally announced February 2019.
-
Shashlik calorimeters: novel compact prototypes for the ENUBET experiment
Authors:
M. Pari,
G. Ballerini,
A. Berra,
R. Boanta,
M. Bonesini,
C. Brizzolari,
G. Brunetti,
M. Calviani,
S. Carturan,
M. G. Catanesi,
S. Cecchini,
A. Coffani,
F. Cindolo,
G. Collazuol,
E. Conti,
F. Dal Corso,
G. De Rosa,
C. Delogu,
A. Gola,
R. A. Intonti,
C. Jollet,
Y. Kudenko,
M. Laveder,
A. Longhin,
P. F. Loverre
, et al. (28 additional authors not shown)
Abstract:
We summarize in this paper the detector R&D performed in the framework of the ERC ENUBET Project. We discuss in particular the latest results on longitudinally segmented shashlik calorimeters and the first HEP application of polysiloxane-based scintillators.
We summarize in this paper the detector R&D performed in the framework of the ERC ENUBET Project. We discuss in particular the latest results on longitudinally segmented shashlik calorimeters and the first HEP application of polysiloxane-based scintillators.
△ Less
Submitted 3 December, 2018;
originally announced December 2018.
-
Design Development for the Beam Dump Facility Target Complex at CERN
Authors:
K. Kershaw,
J. -L. Grenard,
M. Calviani,
C. Ahdida,
M. Casolino,
S. Delavalle,
D. Hounsome,
R. Jacobsson,
M. Lamont,
E. Lopez Sola,
R. Scott,
V. Vlachoudis,
H. Vincke
Abstract:
CERN has launched a study phase to evaluate the feasibility of a new high-intensity beam dump facility at the CERN Super Proton Synchrotron accelerator with the primary goal of exploring Hidden Sector models and searching for Light Dark Matter, but which also offers opportunities for other fixed target flavour physics programs such as rare tau lepton decays and tau neutrino studies. The new facili…
▽ More
CERN has launched a study phase to evaluate the feasibility of a new high-intensity beam dump facility at the CERN Super Proton Synchrotron accelerator with the primary goal of exploring Hidden Sector models and searching for Light Dark Matter, but which also offers opportunities for other fixed target flavour physics programs such as rare tau lepton decays and tau neutrino studies. The new facility will require - among other infrastructure - a target complex in which a dense target/dump will be installed, capable of absorbing the entire energy of the beam extracted from the SPS accelerator. In theory, the target/dump could produce very weakly interacting particles, to be investigated by a suite of particle detectors to be located downstream of the target complex. As part of the study, a development design of the target complex has been produced, taking into account the handling and remote handling operations needed through the lifetime of the facility. Two different handling concepts have been studied and both resulting designs are presented.
△ Less
Submitted 5 April, 2019; v1 submitted 15 June, 2018;
originally announced June 2018.
-
A narrow band neutrino beam with high precision flux measurements
Authors:
A. Coffani,
G. Ballerini,
A. Berra,
R. Boanta,
M. Bonesini,
C. Brizzolari,
G. Brunetti,
M. Calviani,
S. Carturan,
M. G. Catanesi,
S. Cecchini,
F. Cindolo,
G. Collazuol,
E. Conti,
F. Dal Corso,
G. De Rosa,
A. Gola,
R. A. Intonti,
C. Jollet,
Y. Kudenko,
M. Laveder,
A. Longhin,
P. F. Loverre,
L. Ludovici,
L. Magaletti
, et al. (27 additional authors not shown)
Abstract:
The ENUBET facility is a proposed narrow band neutrino beam where lepton production is monitored at single particle level in the instrumented decay tunnel. This facility addresses simultaneously the two most important challenges for the next generation of cross section experiments: a superior control of the flux and flavor composition at source and a high level of tunability and precision in the s…
▽ More
The ENUBET facility is a proposed narrow band neutrino beam where lepton production is monitored at single particle level in the instrumented decay tunnel. This facility addresses simultaneously the two most important challenges for the next generation of cross section experiments: a superior control of the flux and flavor composition at source and a high level of tunability and precision in the selection of the energy of the outcoming neutrinos. We report here the latest results in the development and test of the instrumentation for the decay tunnel. Special emphasis is given to irradiation tests of the photo-sensors performed at INFN-LNL and CERN in 2017 and to the first application of polysiloxane-based scintillators in high energy physics.
△ Less
Submitted 9 April, 2018;
originally announced April 2018.
-
Scaled Prototype of a Tantalum Target Embedded in Expanded Graphite for Antiproton Production: Design, Manufacturing and Testing under Proton Beam Impacts
Authors:
Claudio Torregrosa Martin,
Marco Calviani,
Antonio Perillo-Marcone,
Romain Ferriere,
Nicola Solieri,
Mark Butcher,
Lucian-Mircea Grec,
Joao Canhoto Espadanal
Abstract:
This study presents a further step within the ongoing R&D activities for the redesign of the CERN's Antiproton Decelerator Production Target (AD-Target). A first scaled target prototype, constituted of a sliced core made of ten Ta rods -8 mm diameter, 16 mm length- embedded in a compressed expanded graphite (EG) matrix, inserted in a 44 mm diameter Ti-6Al-4V container, has been built and tested un…
▽ More
This study presents a further step within the ongoing R&D activities for the redesign of the CERN's Antiproton Decelerator Production Target (AD-Target). A first scaled target prototype, constituted of a sliced core made of ten Ta rods -8 mm diameter, 16 mm length- embedded in a compressed expanded graphite (EG) matrix, inserted in a 44 mm diameter Ti-6Al-4V container, has been built and tested under proton beam impacts at the CERN's HiRadMat facility, in the so called HRMT-42 experiment. This prototype has been designed following the lessons learned from previous numerical and experimental works (HRMT-27 experiment) aiming at answering the open questions left in these studies. Velocity data recorded on-line at the target periphery during the HRMT-42 experiment is presented, showing features of its dynamic response to proton beam impacts. Furthermore, x-ray and neutron tomographies of the target prototype after irradiation have been performed. These non-destructive techniques show the extensive plastic deformation of the Ta core, but suggest that the EG matrix can adapt to such deformation, which is a positive result. The neutron tomography successfully revealed the internal state of the tantalum core, showing the appearance of voids of several hundreds of micrometers, in particular in the downstream rods of the core. The possible origin of such voids is discussed while future microstructure analysis after the target opening will try to clarify their nature.
△ Less
Submitted 13 August, 2018; v1 submitted 26 March, 2018;
originally announced March 2018.
-
Experimental setup and procedure for the measurement of the 7Be(n,p)7Li reaction at n_TOF
Authors:
M. Barbagallo,
J. Andrzejewski,
M. Mastromarco,
J. Perkowski,
L. A. Damone,
A. Gawlik,
L. Cosentino,
P. Finocchiaro,
E. A. Maugeri,
A. Mazzone,
R. Dressler,
S. Heinitz,
N. Kivel,
D. Schumann,
N. Colonna,
O. Aberle,
S. Amaducci,
L. Audouin,
M. Bacak,
J. Balibrea,
F. Bečvář,
G. Bellia,
E. Berthoumieux,
J. Billowes,
D. Bosnar
, et al. (103 additional authors not shown)
Abstract:
Following the completion of the second neutron beam line and the related experimental area (EAR2) at the n_TOF spallation neutron source at CERN, several experiments were planned and performed. The high instantaneous neutron flux available in EAR2 allows to investigate neutron indiced reactions with charged particles in the exit channel even employing targets made out of small amounts of short-liv…
▽ More
Following the completion of the second neutron beam line and the related experimental area (EAR2) at the n_TOF spallation neutron source at CERN, several experiments were planned and performed. The high instantaneous neutron flux available in EAR2 allows to investigate neutron indiced reactions with charged particles in the exit channel even employing targets made out of small amounts of short-lived radioactive isotopes. After the successful measurement of the 7Be(n,α)α cross section, the 7Be(n,p)7Li reaction was studied in order to provide still missing cross section data of relevance for Big Bang Nucleosynthesis (BBN), in an attempt to find a solution to the cosmological Lithium abundance problem. This paper describes the experimental setup employed in such a measurement and its characterization.
△ Less
Submitted 3 August, 2017;
originally announced August 2017.
-
Experimental setup and procedure for the measurement of the 7Be(n,α)α reaction at n_TOF
Authors:
L. Cosentino,
A. Musumarra,
M. Barbagallo,
A. Pappalardo,
N. Colonna,
L. Damone,
M. Piscopo,
P. Finocchiaro,
E. Maugeri,
S. Heinitz,
D. Schumann,
R. Dressler,
N. Kivel,
O. Aberle,
J. Andrzejewski,
L. Audouin,
M. Ayranov,
M. Bacak,
S. Barros,
J. Balibrea-Correa,
V. Beecares,
F. Becvar,
C. Beinrucker,
E. Berthoumieux,
J. Billowes
, et al. (107 additional authors not shown)
Abstract:
The newly built second experimental area EAR2 of the n_TOF spallation neutron source at CERN allows to perform (n, charged particles) experiments on short-lived highly radioactive targets. This paper describes a detection apparatus and the experimental procedure for the determination of the cross-section of the 7Be(n,α) reaction, which represents one of the focal points toward the solution of the…
▽ More
The newly built second experimental area EAR2 of the n_TOF spallation neutron source at CERN allows to perform (n, charged particles) experiments on short-lived highly radioactive targets. This paper describes a detection apparatus and the experimental procedure for the determination of the cross-section of the 7Be(n,α) reaction, which represents one of the focal points toward the solution of the cosmological Lithium abundance problem, and whose only measurement, at thermal energy, dates back to 1963. The apparently unsurmountable experimental difficulties stemming from the huge 7Be γ-activity, along with the lack of a suitable neutron beam facility, had so far prevented further measurements. The detection system is subject to considerable radiation damage, but is capable of disentangling the rare reaction signals from the very high background. This newly developed setup could likely be useful also to study other challenging reactions requiring the detectors to be installed directly in the neutron beam.
△ Less
Submitted 1 April, 2016;
originally announced April 2016.