-
Future Circular Collider Feasibility Study Report: Volume 2, Accelerators, Technical Infrastructure and Safety
Authors:
M. Benedikt,
F. Zimmermann,
B. Auchmann,
W. Bartmann,
J. P. Burnet,
C. Carli,
A. Chancé,
P. Craievich,
M. Giovannozzi,
C. Grojean,
J. Gutleber,
K. Hanke,
A. Henriques,
P. Janot,
C. Lourenço,
M. Mangano,
T. Otto,
J. Poole,
S. Rajagopalan,
T. Raubenheimer,
E. Todesco,
L. Ulrici,
T. Watson,
G. Wilkinson,
A. Abada
, et al. (1439 additional authors not shown)
Abstract:
In response to the 2020 Update of the European Strategy for Particle Physics, the Future Circular Collider (FCC) Feasibility Study was launched as an international collaboration hosted by CERN. This report describes the FCC integrated programme, which consists of two stages: an electron-positron collider (FCC-ee) in the first phase, serving as a high-luminosity Higgs, top, and electroweak factory;…
▽ More
In response to the 2020 Update of the European Strategy for Particle Physics, the Future Circular Collider (FCC) Feasibility Study was launched as an international collaboration hosted by CERN. This report describes the FCC integrated programme, which consists of two stages: an electron-positron collider (FCC-ee) in the first phase, serving as a high-luminosity Higgs, top, and electroweak factory; followed by a proton-proton collider (FCC-hh) at the energy frontier in the second phase.
FCC-ee is designed to operate at four key centre-of-mass energies: the Z pole, the WW production threshold, the ZH production peak, and the top/anti-top production threshold - delivering the highest possible luminosities to four experiments. Over 15 years of operation, FCC-ee will produce more than 6 trillion Z bosons, 200 million WW pairs, nearly 3 million Higgs bosons, and 2 million top anti-top pairs. Precise energy calibration at the Z pole and WW threshold will be achieved through frequent resonant depolarisation of pilot bunches. The sequence of operation modes remains flexible.
FCC-hh will operate at a centre-of-mass energy of approximately 85 TeV - nearly an order of magnitude higher than the LHC - and is designed to deliver 5 to 10 times the integrated luminosity of the HL-LHC. Its mass reach for direct discovery extends to several tens of TeV. In addition to proton-proton collisions, FCC-hh is capable of supporting ion-ion, ion-proton, and lepton-hadron collision modes.
This second volume of the Feasibility Study Report presents the complete design of the FCC-ee collider, its operation and staging strategy, the full-energy booster and injector complex, required accelerator technologies, safety concepts, and technical infrastructure. It also includes the design of the FCC-hh hadron collider, development of high-field magnets, hadron injector options, and key technical systems for FCC-hh.
△ Less
Submitted 25 April, 2025;
originally announced May 2025.
-
Future Circular Collider Feasibility Study Report: Volume 3, Civil Engineering, Implementation and Sustainability
Authors:
M. Benedikt,
F. Zimmermann,
B. Auchmann,
W. Bartmann,
J. P. Burnet,
C. Carli,
A. Chancé,
P. Craievich,
M. Giovannozzi,
C. Grojean,
J. Gutleber,
K. Hanke,
A. Henriques,
P. Janot,
C. Lourenço,
M. Mangano,
T. Otto,
J. Poole,
S. Rajagopalan,
T. Raubenheimer,
E. Todesco,
L. Ulrici,
T. Watson,
G. Wilkinson,
P. Azzi
, et al. (1439 additional authors not shown)
Abstract:
Volume 3 of the FCC Feasibility Report presents studies related to civil engineering, the development of a project implementation scenario, and environmental and sustainability aspects. The report details the iterative improvements made to the civil engineering concepts since 2018, taking into account subsurface conditions, accelerator and experiment requirements, and territorial considerations. I…
▽ More
Volume 3 of the FCC Feasibility Report presents studies related to civil engineering, the development of a project implementation scenario, and environmental and sustainability aspects. The report details the iterative improvements made to the civil engineering concepts since 2018, taking into account subsurface conditions, accelerator and experiment requirements, and territorial considerations. It outlines a technically feasible and economically viable civil engineering configuration that serves as the baseline for detailed subsurface investigations, construction design, cost estimation, and project implementation planning. Additionally, the report highlights ongoing subsurface investigations in key areas to support the development of an improved 3D subsurface model of the region.
The report describes development of the project scenario based on the 'avoid-reduce-compensate' iterative optimisation approach. The reference scenario balances optimal physics performance with territorial compatibility, implementation risks, and costs. Environmental field investigations covering almost 600 hectares of terrain - including numerous urban, economic, social, and technical aspects - confirmed the project's technical feasibility and contributed to the preparation of essential input documents for the formal project authorisation phase. The summary also highlights the initiation of public dialogue as part of the authorisation process. The results of a comprehensive socio-economic impact assessment, which included significant environmental effects, are presented. Even under the most conservative and stringent conditions, a positive benefit-cost ratio for the FCC-ee is obtained. Finally, the report provides a concise summary of the studies conducted to document the current state of the environment.
△ Less
Submitted 25 April, 2025;
originally announced May 2025.
-
Future Circular Collider Feasibility Study Report: Volume 1, Physics, Experiments, Detectors
Authors:
M. Benedikt,
F. Zimmermann,
B. Auchmann,
W. Bartmann,
J. P. Burnet,
C. Carli,
A. Chancé,
P. Craievich,
M. Giovannozzi,
C. Grojean,
J. Gutleber,
K. Hanke,
A. Henriques,
P. Janot,
C. Lourenço,
M. Mangano,
T. Otto,
J. Poole,
S. Rajagopalan,
T. Raubenheimer,
E. Todesco,
L. Ulrici,
T. Watson,
G. Wilkinson,
P. Azzi
, et al. (1439 additional authors not shown)
Abstract:
Volume 1 of the FCC Feasibility Report presents an overview of the physics case, experimental programme, and detector concepts for the Future Circular Collider (FCC). This volume outlines how FCC would address some of the most profound open questions in particle physics, from precision studies of the Higgs and EW bosons and of the top quark, to the exploration of physics beyond the Standard Model.…
▽ More
Volume 1 of the FCC Feasibility Report presents an overview of the physics case, experimental programme, and detector concepts for the Future Circular Collider (FCC). This volume outlines how FCC would address some of the most profound open questions in particle physics, from precision studies of the Higgs and EW bosons and of the top quark, to the exploration of physics beyond the Standard Model. The report reviews the experimental opportunities offered by the staged implementation of FCC, beginning with an electron-positron collider (FCC-ee), operating at several centre-of-mass energies, followed by a hadron collider (FCC-hh). Benchmark examples are given of the expected physics performance, in terms of precision and sensitivity to new phenomena, of each collider stage. Detector requirements and conceptual designs for FCC-ee experiments are discussed, as are the specific demands that the physics programme imposes on the accelerator in the domains of the calibration of the collision energy, and the interface region between the accelerator and the detector. The report also highlights advances in detector, software and computing technologies, as well as the theoretical tools /reconstruction techniques that will enable the precision measurements and discovery potential of the FCC experimental programme. This volume reflects the outcome of a global collaborative effort involving hundreds of scientists and institutions, aided by a dedicated community-building coordination, and provides a targeted assessment of the scientific opportunities and experimental foundations of the FCC programme.
△ Less
Submitted 25 April, 2025;
originally announced May 2025.
-
Design of a new SPS injection system via numerical optimisation
Authors:
E. Waagaard,
M. J. Barnes,
W. Bartmann,
J. Borburgh,
L. S. Ducimetière,
T. Kramer,
T. Stadlbauer,
P. Trubacova,
F. M. Velotti
Abstract:
The Super Proton Synchrotron (SPS) injection system plays a fundamental role to preserve the quality of injected high-brightness beams for the Large Hadron Collider (LHC) physics program and to maintain the maximum storable intensity. The present system is the result of years of upgrades and patches of a system not conceived for such intensities and beam qualities. In this study, we propose the de…
▽ More
The Super Proton Synchrotron (SPS) injection system plays a fundamental role to preserve the quality of injected high-brightness beams for the Large Hadron Collider (LHC) physics program and to maintain the maximum storable intensity. The present system is the result of years of upgrades and patches of a system not conceived for such intensities and beam qualities. In this study, we propose the design of a completely new injection system for the SPS using multi-level numerical optimisation, including realistic hardware assumptions. We also present how this hierarchical optimisation framework can be adapted to other situations for optimal accelerator system design.
△ Less
Submitted 29 June, 2022; v1 submitted 23 June, 2022;
originally announced June 2022.
-
Progress with the Upgrade of the SPS for the HL-LHC Era
Authors:
B. Goddard,
T. Argyropoulos,
H. Bartosik,
W. Bartmann,
T. Bohl,
F. Caspers,
K. Cornelis,
H. Damerau,
L. Drøsdal,
L. Ducimetière,
R. Garoby,
M. Gourber-Pace,
W. Höfle,
G. Iadarola,
L. Jensen,
V. Kain,
R. Losito,
M. Meddahi,
A. Mereghetti,
V. Mertens,
Ö. Mete,
E. Montesinos,
J. E. Müller,
Y. Papaphilippou,
G. Rumolo
, et al. (6 additional authors not shown)
Abstract:
The demanding beam performance requirements of the High Luminosity (HL-) LHC project translate into a set of requirements and upgrade paths for the LHC injector complex. In this paper the performance requirements for the SPS and the known limitations are reviewed in the light of the 2012 operational experience. The various SPS upgrades in progress and still under consideration are described, in ad…
▽ More
The demanding beam performance requirements of the High Luminosity (HL-) LHC project translate into a set of requirements and upgrade paths for the LHC injector complex. In this paper the performance requirements for the SPS and the known limitations are reviewed in the light of the 2012 operational experience. The various SPS upgrades in progress and still under consideration are described, in addition to the machine studies and simulations performed in 2012. The expected machine performance reach is estimated on the basis of the present knowledge, and the remaining decisions that still need to be made concerning upgrade options are detailed.
△ Less
Submitted 19 September, 2014;
originally announced September 2014.
-
Injection and dump considerations for a 16.5 TeV HE-LHC
Authors:
B. Goddard,
M. Barnes,
W. Bartmann,
J. Borburgh,
C. Bracco,
L. Ducimetière,
V. Kain,
M. Meddahi,
V. Mertens,
V. Senaj,
J. Uythoven
Abstract:
Injection and beam dumping is considered for a 16.5 TeV hadron accelerator in the current LHC tunnel, with an injection energy in the range 1 - 1.3 TeV. The present systems are described and the possible upgrade scenarios investigated for higher beam rigidity. In addition to the required equipment performance, the machine protection related aspects are explored. The expected constraints on the mac…
▽ More
Injection and beam dumping is considered for a 16.5 TeV hadron accelerator in the current LHC tunnel, with an injection energy in the range 1 - 1.3 TeV. The present systems are described and the possible upgrade scenarios investigated for higher beam rigidity. In addition to the required equipment performance, the machine protection related aspects are explored. The expected constraints on the machine layout are also given. The technological challenges for the different equipment subsystems are detailed, and areas where R&D is necessary are highlighted.
△ Less
Submitted 8 August, 2011;
originally announced August 2011.