-
Positron Beams At Ce$^+$BAF
Authors:
J. Grames,
J. Benesch,
M. Bruker,
L. Cardman,
S. Covrig,
P. Ghoshal,
S. Gopinath,
J. Gubeli,
S. Habet,
C. Hernandez-Garcia,
A. Hofler,
R. Kazimi,
F. Lin,
S. Nagaitsev,
M. Poelker,
B. Rimmer,
Y. Roblin,
V. Lizarraga-Rubio,
A. Seryi,
M. Spata,
A. Sy,
D. Turner,
A. Ushakov,
C. A. Valerio-Lizarraga,
E. Voutier
Abstract:
We present a scheme for the generation of a high polarization positron beam with continous wave (CW) bunch structure for the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab). The positrons are created in a high average power conversion target and collected by a CW capture linac and DC solenoid.
We present a scheme for the generation of a high polarization positron beam with continous wave (CW) bunch structure for the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab). The positrons are created in a high average power conversion target and collected by a CW capture linac and DC solenoid.
△ Less
Submitted 27 September, 2023;
originally announced September 2023.
-
Report of the 2021 U.S. Community Study on the Future of Particle Physics (Snowmass 2021) Summary Chapter
Authors:
Joel N. Butler,
R. Sekhar Chivukula,
André de Gouvêa,
Tao Han,
Young-Kee Kim,
Priscilla Cushman,
Glennys R. Farrar,
Yury G. Kolomensky,
Sergei Nagaitsev,
Nicolás Yunes,
Stephen Gourlay,
Tor Raubenheimer,
Vladimir Shiltsev,
Kétévi A. Assamagan,
Breese Quinn,
V. Daniel Elvira,
Steven Gottlieb,
Benjamin Nachman,
Aaron S. Chou,
Marcelle Soares-Santos,
Tim M. P. Tait,
Meenakshi Narain,
Laura Reina,
Alessandro Tricoli,
Phillip S. Barbeau
, et al. (18 additional authors not shown)
Abstract:
The 2021-22 High-Energy Physics Community Planning Exercise (a.k.a. ``Snowmass 2021'') was organized by the Division of Particles and Fields of the American Physical Society. Snowmass 2021 was a scientific study that provided an opportunity for the entire U.S. particle physics community, along with its international partners, to identify the most important scientific questions in High Energy Physi…
▽ More
The 2021-22 High-Energy Physics Community Planning Exercise (a.k.a. ``Snowmass 2021'') was organized by the Division of Particles and Fields of the American Physical Society. Snowmass 2021 was a scientific study that provided an opportunity for the entire U.S. particle physics community, along with its international partners, to identify the most important scientific questions in High Energy Physics for the following decade, with an eye to the decade after that, and the experiments, facilities, infrastructure, and R&D needed to pursue them. This Snowmass summary report synthesizes the lessons learned and the main conclusions of the Community Planning Exercise as a whole and presents a community-informed synopsis of U.S. particle physics at the beginning of 2023. This document, along with the Snowmass reports from the various subfields, will provide input to the 2023 Particle Physics Project Prioritization Panel (P5) subpanel of the U.S. High-Energy Physics Advisory Panel (HEPAP), and will help to guide and inform the activity of the U.S. particle physics community during the next decade and beyond.
△ Less
Submitted 3 December, 2023; v1 submitted 16 January, 2023;
originally announced January 2023.
-
Ring-Based Electron Cooling System for the EIC
Authors:
V. Lebedev,
S. Nagaitsev,
A. Burov,
V. Yakovlev,
I. Gonin,
I. Terechkine,
A. Saini,
N. Solyak
Abstract:
This report describes a concept of an EIC cooling system, based on a proven induction linac technology with a dc electron beam. The system would operate in a full energy range of proton beams (100 - 270 GeV) and would provide 50-100 A electron beams, circulating in a cooler ring for 5 ms. Every 5 ms a new electron pulse would be injected into the cooler ring to provide continuous cooling at collis…
▽ More
This report describes a concept of an EIC cooling system, based on a proven induction linac technology with a dc electron beam. The system would operate in a full energy range of proton beams (100 - 270 GeV) and would provide 50-100 A electron beams, circulating in a cooler ring for 5 ms. Every 5 ms a new electron pulse would be injected into the cooler ring to provide continuous cooling at collisions. Operations with a 10-ms cycle is possible but it will reduce the cooling rates by ~30$\%$. The system is capable of delivering the required performance in the entire EIC energy range with emittance cooling times of less than 1-2 hours.
△ Less
Submitted 10 January, 2021; v1 submitted 1 October, 2020;
originally announced October 2020.