Showing 1–2 of 2 results for author: Heuberger, C F
-
Sector coupling via hydrogen to lower the cost of energy system decarbonization
Authors:
Guannan He,
Dharik S. Mallapragada,
Abhishek Bose,
Clara F. Heuberger,
Emre Gençer
Abstract:
There is growing interest in hydrogen (H$_2$) use for long-duration energy storage in a future electric grid dominated by variable renewable energy (VRE) resources. Modelling the role of H$_2$ as grid-scale energy storage, often referred as "power-to-gas-to-power (P2G2P)" overlooks the cost-sharing and emission benefits from using the deployed H$_2$ production and storage assets to also supply H…
▽ More
There is growing interest in hydrogen (H$_2$) use for long-duration energy storage in a future electric grid dominated by variable renewable energy (VRE) resources. Modelling the role of H$_2$ as grid-scale energy storage, often referred as "power-to-gas-to-power (P2G2P)" overlooks the cost-sharing and emission benefits from using the deployed H$_2$ production and storage assets to also supply H$_2$ for decarbonizing other end-use sectors where direct electrification may be challenged. Here, we develop a generalized modelling framework for co-optimizing energy infrastructure investment and operation across power and transportation sectors and the supply chains of electricity and H$_2$, while accounting for spatio-temporal variations in energy demand and supply. Applying this sector-coupling framework to the U.S. Northeast under a range of technology cost and carbon price scenarios, we find a greater value of power-to-H$_2$ (P2G) versus P2G2P routes. P2G provides flexible demand response, while the extra cost and efficiency penalties of P2G2P routes make the solution less attractive for grid balancing. The effects of sector-coupling are significant, boosting VRE generation by 12-55% with both increased capacities and reduced curtailments and reducing the total system cost (or levelized costs of energy) by 6-14% under 96% decarbonization scenarios. Both the cost savings and emission reductions from sector coupling increase with H$_2$ demand for other end-uses, more than doubling for a 96% decarbonization scenario as H$_2$ demand quadraples. Moreover, we found that the deployment of carbon capture and storage is more cost-effective in the H$_2$ sector because of the lower cost and higher utilization rate. These findings highlight the importance of using an integrated multi-sector energy system framework with multiple energy vectors in planning energy system decarbonization pathways.
△ Less
Submitted 4 March, 2021;
originally announced March 2021.
-
Hydrogen Supply Chain Planning with Flexible Transmission and Storage Scheduling
Authors:
Guannan He,
Dharik S. Mallapragada,
Abhishek Bose,
Clara F. Heuberger,
Emre Gençer
Abstract:
Hydrogen is becoming an increasingly appealing energy carrier, as the costs of renewable energy generation and water electrolysis continue to decline. Developing modelling and decision tools for the H$_{2}$ supply chain that fully capture the flexibility of various resources is essential to understanding the overall cost-competitiveness of H$_{2}$ use. To address this need, we have developed a H…
▽ More
Hydrogen is becoming an increasingly appealing energy carrier, as the costs of renewable energy generation and water electrolysis continue to decline. Developing modelling and decision tools for the H$_{2}$ supply chain that fully capture the flexibility of various resources is essential to understanding the overall cost-competitiveness of H$_{2}$ use. To address this need, we have developed a H$_{2}$ supply chain planning model that determines the least-cost mix of H$_{2}$ generation, storage, transmission, and compression facilities to meet H$_{2}$ demands and is coupled with power systems through electricity prices. We incorporate flexible scheduling for H$_{2}$ trucks and pipeline, allowing them to serve as both H$_{2}$ transmission and storage resources to shift H$_{2}$ demand/production across space and time. The case study results in the U.S. Northeast indicate that the proposed framework for flexible scheduling of H$_{2}$ transmission and storage resources is critical not only to cost minimization but also to the choice of H$_{2}$ production pathways between electrolyzer and centralized natural-gas-based production facilities. Trucks as mobile storage could make electrolyzer more competitive by providing extra spatiotemporal flexibility to respond to the electricity price variability while meeting H$_{2}$ demands. The proposed model also provides a reasonable trade-off between modeling accuracy and solution times.
△ Less
Submitted 17 August, 2020;
originally announced August 2020.