Skip to main content

Showing 1–2 of 2 results for author: Goverde, R M

Searching in archive math. Search in all archives.
.
  1. arXiv:2103.00454  [pdf, other

    math.OC cs.DM

    The Maintenance Scheduling and Location Choice Problem for Railway Rolling Stock

    Authors: Jordi Zomer, Nikola Bešinović, Mathijs M. de Weerdt, Rob M. P. Goverde

    Abstract: Due to increasing railway use, the capacity at railway yards and maintenance locations is becoming limiting. Therefore, the scheduling of rolling stock maintenance and the choice regarding optimal locations to perform maintenance is increasingly complicated. This research introduces a Maintenance Scheduling and Location Choice Problem (MSLCP). It simultaneously determines maintenance locations and… ▽ More

    Submitted 28 February, 2021; originally announced March 2021.

    Comments: 27 pages, 10 figures, MSCLP code available at github

  2. arXiv:2012.04565  [pdf, other

    math.OC cs.DM eess.SY

    The Maintenance Location Choice Problem for Railway Rolling Stock

    Authors: Jordi Zomer, Nikola Bešinović, Mathijs M. de Weerdt, Rob M. P. Goverde

    Abstract: Due to increasing railway use, the capacity at railway yards and maintenance locations is becoming limiting to accommodate existing rolling stock. To reduce capacity issues at maintenance locations during nighttime, railway undertakings consider performing more daytime maintenance, but the choice at which locations personnel needs to be stationed for daytime maintenance is not straightforward. Amo… ▽ More

    Submitted 8 December, 2020; originally announced December 2020.

    Comments: 16 pages, 5 figures

    MSC Class: 90-10