-
Muon Collider Higgs Factory for Snowmass 2013
Abstract: We propose the construction of, and describe in detail, a compact Muon Collider s-channel Higgs Factory.
Submitted 9 August, 2013; originally announced August 2013.
Comments: 43 pages, 20 figures, 10 tables
Report number: FERMILAB-CONF-13-245-T
-
The Case for a Muon Collider Higgs Factory
Abstract: We propose the construction of a compact Muon Collider Higgs Factory. Such a machine can produce up to \sim 14,000 at 8\times 10^{31} cm^-2 sec^-1 clean Higgs events per year, enabling the most precise possible measurement of the mass, width and Higgs-Yukawa coupling constants.
Submitted 23 July, 2013; originally announced July 2013.
Comments: Supporting letter for the document: "Muon Collider Higgs Factory for Smowmass 2013", A White Paper submitted to the 2013 U.S. Community Summer Study of the Division of Particles and Fields of the American Physical Society, Y. Alexahin, et. al, FERMILAB-CONF-13-245-T (July, 2013)
-
Interim Design Report
Abstract: The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires a… ▽ More
Submitted 13 December, 2011; originally announced December 2011.
Report number: IDS-NF-020; BNL-96453-2011; CERN-ATS-2011-216; EUROnu-WP1-05; FERMILAB-PUB-11-581-APC; RAL-TR-2011-018
-
Progress in Absorber R&D 2: Windows
Abstract: A program is underway to develop liquid-hydrogen energy absorbers for ionization cooling of muon-beam transverse emittance. Minimization of multiple-scattering-induced beam heating requires thin windows. The first window prototype has been destructively tested, validating the finite-element-analysis model and the design approach.
Submitted 17 August, 2001; originally announced August 2001.
Comments: 3 pages, 3 figures, presented at the 2001 Particle Accelerator Conference (PAC 2001), June 18-22, 2001, Chicago, Illinois
Report number: IIT-HEP-01/3
Journal ref: Conf.Proc.C0106181:3888-3890,2001
-
Progress in Absorber R&D for Muon Cooling
Abstract: A stored-muon-beam neutrino factory may require transverse ionization cooling of the muon beam. We describe recent progress in research and development on energy absorbers for muon-beam cooling carried out by a collaboration of university and laboratory groups.
Submitted 17 August, 2001; v1 submitted 15 August, 2001; originally announced August 2001.
Comments: 7 pages, 1 figure, presented at the 3rd International Workshop on Neutrino Factory Based on Muon Storage Rings (NuFACT'01), May 24-30, 2001, Tsukuba, Japan
Report number: IIT-HEP-01/2
Journal ref: Nucl.Instrum.Meth.A503:392-395,2003