Skip to main content

Showing 1–2 of 2 results for author: Bogenschuetz, J

Searching in archive hep-ph. Search in all archives.
.
  1. arXiv:2504.00245  [pdf, other

    hep-ex hep-ph nucl-th

    The Short-Baseline Near Detector at Fermilab

    Authors: SBND Collaboration, R. Acciarri, L. Aliaga-Soplin, O. Alterkait, R. Alvarez-Garrote, D. Andrade Aldana, C. Andreopoulos, A. Antonakis, L. Arellano, W. Badgett, S. Balasubramanian, A. Barnard, V. Basque, J. Bateman, A. Beever, E. Belchior, M. Betancourt, A. Bhat, M. Bishai, A. Blake, B. Bogart, J. Bogenschuetz, D. Brailsford, A. Brandt, S. Brickner , et al. (173 additional authors not shown)

    Abstract: SBND is a 112 ton liquid argon time projection chamber (LArTPC) neutrino detector located 110 meters from the Booster Neutrino Beam (BNB) target at Fermilab. Its main goals include searches for eV-scale sterile neutrinos as part of the Short-Baseline Neutrino (SBN) program, other searches for physics beyond the Standard Model, and precision studies of neutrino-argon interactions. In addition, SBND… ▽ More

    Submitted 4 April, 2025; v1 submitted 31 March, 2025; originally announced April 2025.

    Comments: Input to the European Strategy for Particle Physics 2026 Update

    Report number: FERMILAB-PUB-25-0154-PPD

  2. arXiv:2311.09915  [pdf, other

    hep-ex hep-ph physics.ins-det

    Physics Opportunities at a Beam Dump Facility at PIP-II at Fermilab and Beyond

    Authors: A. A. Aguilar-Arevalo, J. L. Barrow, C. Bhat, J. Bogenschuetz, C. Bonifazi, A. Bross, B. Cervantes, J. D'Olivo, A. De Roeck, B. Dutta, M. Eads, J. Eldred, J. Estrada, A. Fava, C. Fernandes Vilela, G. Fernandez Moroni, B. Flaugher, S. Gardiner, G. Gurung, P. Gutierrez, W. Y. Jang, K. J. Kelly, D. Kim, T. Kobilarcik, Z. Liu , et al. (23 additional authors not shown)

    Abstract: The Fermilab Proton-Improvement-Plan-II (PIP-II) is being implemented in order to support the precision neutrino oscillation measurements at the Deep Underground Neutrino Experiment, the U.S. flagship neutrino experiment. The PIP-II LINAC is presently under construction and is expected to provide 800~MeV protons with 2~mA current. This white paper summarizes the outcome of the first workshop on Ma… ▽ More

    Submitted 16 November, 2023; originally announced November 2023.

    Report number: FERMILAB-FN-1242-AD-ND-PPD