-
First Demonstration of Field-Deployable Low Latency Hollow-core Cable Capable of Supporting >1000km, 400Gb/s WDM Transmission
Abstract: We report order-of-magnitude improvements in performance of field-deployable hollow-core fiber cables evidenced by a 38.4Tb/s (800Gb/s-x-48WDM-channels) 20.5km lab-trial using commercial terminal equipment and the demonstration of 1128km/126km reach in full-fill 400/800Gb/s WDM recirculating-loop experiments.
Submitted 9 June, 2021; originally announced June 2021.
Comments: 4 pages, 2 figures, sbmitted to but not accepted by OFC 2021 Post deadline subcommittee D1
-
Islanding microgrid with solar and fuel cell for providing load
Abstract: Solar and Fuel cell energy resources are two major of Renewable Energy Resources (RES) which is using to power electrical grids. They can provide clean energy and help to reduce greenhouse emissions. RES is changing the structure of electrical systems day by day. They have provided to supply the loads and have distributed systems. The concept of Microgrid has been defined by connecting distributed… ▽ More
Submitted 7 October, 2020; originally announced October 2020.
Comments: International Journal of Engineering Science and Computing 2020 IJESC