Skip to main content

Showing 1–5 of 5 results for author: van der Ster, S

Searching in archive cs. Search in all archives.
.
  1. arXiv:1811.05916  [pdf, other

    cs.DS

    A Duality Based 2-Approximation Algorithm for Maximum Agreement Forest

    Authors: Neil Olver, Frans Schalekamp, Suzanne van der Ster, Leen Stougie, Anke van Zuylen

    Abstract: We give a 2-approximation algorithm for the Maximum Agreement Forest problem on two rooted binary trees. This NP-hard problem has been studied extensively in the past two decades, since it can be used to compute the rooted Subtree Prune-and-Regraft (rSPR) distance between two phylogenetic trees. Our algorithm is combinatorial and its running time is quadratic in the input size. To prove the approx… ▽ More

    Submitted 14 November, 2018; originally announced November 2018.

    MSC Class: 68W25; 90C27; 92D15

  2. arXiv:1511.06000  [pdf, ps, other

    cs.DS

    A Duality Based 2-Approximation Algorithm for Maximum Agreement Forest

    Authors: Frans Schalekamp, Anke van Zuylen, Suzanne van der Ster

    Abstract: We give a 2-approximation algorithm for the Maximum Agreement Forest problem on two rooted binary trees. This NP-hard problem has been studied extensively in the past two decades, since it can be used to compute the Subtree Prune-and-Regraft (SPR) distance between two phylogenetic trees. Our result improves on the very recent 2.5-approximation algorithm due to Shi, Feng, You and Wang (2015). Our a… ▽ More

    Submitted 27 April, 2016; v1 submitted 18 November, 2015; originally announced November 2015.

  3. arXiv:1404.4766  [pdf, ps, other

    cs.DS

    Scheduling over Scenarios on Two Machines

    Authors: Esteban Feuerstein, Alberto Marchetti-Spaccamela, Frans Schalekamp, Rene Sitters, Suzanne van der Ster, Leen Stougie, Anke van Zuylen

    Abstract: We consider scheduling problems over scenarios where the goal is to find a single assignment of the jobs to the machines which performs well over all possible scenarios. Each scenario is a subset of jobs that must be executed in that scenario and all scenarios are given explicitly. The two objectives that we consider are minimizing the maximum makespan over all scenarios and minimizing the sum of… ▽ More

    Submitted 18 April, 2014; originally announced April 2014.

    Comments: To appear in COCOON 2014. The final publication is available at link.springer.com

  4. arXiv:1212.1754  [pdf, ps, other

    cs.DS

    Split Scheduling with Uniform Setup Times

    Authors: Frans Schalekamp, Rene Sitters, Suzanne van der Ster, Leen Stougie, Victor Verdugo, Anke van Zuylen

    Abstract: We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup a machine cannot process or set up any other job. We concentrate on the basic case in which setup times are job-, machine-, and se… ▽ More

    Submitted 7 December, 2012; originally announced December 2012.

  5. arXiv:1107.1052  [pdf, ps, other

    cs.DS cs.CC cs.DM

    The traveling salesman problem on cubic and subcubic graphs

    Authors: Sylvia Boyd, René Sitters, Suzanne van der Ster, Leen Stougie

    Abstract: We study the Travelling Salesman Problem (TSP) on the metric completion of cubic and subcubic graphs, which is known to be NP-hard. The problem is of interest because of its relation to the famous 4/3 conjecture for metric TSP, which says that the integrality gap, i.e., the worst case ratio between the optimal values of the TSP and its linear programming relaxation (the subtour elimination relaxat… ▽ More

    Submitted 6 July, 2011; originally announced July 2011.