Showing 1–4 of 4 results for author: Boland, N

Searching in archive cs. Search in all archives.
.
  1. arXiv:1808.06044  [pdf, ps, other

    cs.CE

    Maximising Throughput in a Complex Coal Export System

    Authors: Mateus Rocha de Paula, Natashia Boland, Andreas Ernst, Alexandre Mendes, Martin Savelsbergh

    Abstract: The Port of Newcastle features three coal export terminals, operating primarily in cargo assembly mode, that share a rail network on their inbound side, and a channel on their outbound side. Maximising throughput at a single coal terminal, taking into account its layout, its equipment, and its operating policies, is already challenging, but maximising throughput of the Hunter Valley coal export sy… ▽ More

    Submitted 22 August, 2018; v1 submitted 18 August, 2018; originally announced August 2018.

  2. arXiv:1508.03181  [pdf, ps, other

    math.OC cs.DM math.CO

    A polynomially solvable case of the pooling problem

    Authors: Natashia Boland, Thomas Kalinowski, Fabian Rigterink

    Abstract: Answering a question of Haugland, we show that the pooling problem with one pool and a bounded number of inputs can be solved in polynomial time by solving a polynomial number of linear programs of polynomial size. We also give an overview of known complexity results and remaining open problems to further characterize the border between (strongly) NP-hard and polynomially solvable cases of the poo… ▽ More

    Submitted 5 April, 2016; v1 submitted 13 August, 2015; originally announced August 2015.

    Comments: updated references

    Journal ref: Journal of Global Optimization, Volume 67, Issue 3, pp 621-630, 2017

  3. Scheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time period

    Authors: Natashia Boland, Thomas Kalinowski, Simranjit Kaur

    Abstract: We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning peri… ▽ More

    Submitted 19 January, 2015; v1 submitted 13 July, 2013; originally announced July 2013.

    MSC Class: 90C10; 90B10; 68Q25

    Journal ref: Journal of Combinatorial Optimization, Volume 32, Issue 3, pp 885-905, 2016

  4. Scheduling unit processing time arc shutdown jobs to maximize network flow over time: complexity results

    Authors: Natashia Boland, Thomas Kalinowski, Reena Kapoor, Simranjit Kaur

    Abstract: We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning peri… ▽ More

    Submitted 20 June, 2013; originally announced June 2013.

    MSC Class: 90C10; 90B10; 68Q25

    Journal ref: Networks 63(2):196-202, 2014