Maximising Throughput in a Complex Coal Export System
Authors:
Mateus Rocha de Paula,
Natashia Boland,
Andreas Ernst,
Alexandre Mendes,
Martin Savelsbergh
Abstract:
The Port of Newcastle features three coal export terminals, operating primarily in cargo assembly mode, that share a rail network on their inbound side, and a channel on their outbound side. Maximising throughput at a single coal terminal, taking into account its layout, its equipment, and its operating policies, is already challenging, but maximising throughput of the Hunter Valley coal export sy…
▽ More
The Port of Newcastle features three coal export terminals, operating primarily in cargo assembly mode, that share a rail network on their inbound side, and a channel on their outbound side. Maximising throughput at a single coal terminal, taking into account its layout, its equipment, and its operating policies, is already challenging, but maximising throughput of the Hunter Valley coal export system as a whole requires that terminals and inbound and outbound shared resources be considered simultaneously. Existing approaches to do so either lack realism or are too computationally demanding to be useful as an everyday planning tool. We present a parallel genetic algorithm to optimise the integrated system. The algorithm models activities in continuous time, can handle practical planning horizons efficiently, and generates solutions that match or improve solutions obtained with the state-of-the-art solvers, whilst vastly outperforming them both in memory usage and running time.
△ Less
Submitted 22 August, 2018; v1 submitted 18 August, 2018;
originally announced August 2018.
-
A polynomially solvable case of the pooling problem
Authors:
Natashia Boland,
Thomas Kalinowski,
Fabian Rigterink
Abstract:
Answering a question of Haugland, we show that the pooling problem with one pool and a bounded number of inputs can be solved in polynomial time by solving a polynomial number of linear programs of polynomial size. We also give an overview of known complexity results and remaining open problems to further characterize the border between (strongly) NP-hard and polynomially solvable cases of the poo…
▽ More
Answering a question of Haugland, we show that the pooling problem with one pool and a bounded number of inputs can be solved in polynomial time by solving a polynomial number of linear programs of polynomial size. We also give an overview of known complexity results and remaining open problems to further characterize the border between (strongly) NP-hard and polynomially solvable cases of the pooling problem.
△ Less
Submitted 5 April, 2016; v1 submitted 13 August, 2015;
originally announced August 2015.
-
Scheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time period
Authors:
Natashia Boland,
Thomas Kalinowski,
Simranjit Kaur
Abstract:
We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning peri…
▽ More
We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning period, which will require each to be shut down for exactly one time period. In general this problem is known to be NP-hard, and several special instance classes have been studied. Here we propose an additional constraint which limits the number of maintenance jobs per time period, and we study the impact of this on the complexity.
△ Less
Submitted 19 January, 2015; v1 submitted 13 July, 2013;
originally announced July 2013.
-
Scheduling unit processing time arc shutdown jobs to maximize network flow over time: complexity results
Authors:
Natashia Boland,
Thomas Kalinowski,
Reena Kapoor,
Simranjit Kaur
Abstract:
We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning peri…
▽ More
We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning period, which will require each to be shut down for exactly one time period. In general this problem is known to be NP-hard. Here we identify a number of characteristics that are relevant for the complexity of instance classes. In particular, we discuss instances with restrictions on the set of arcs that have maintenance to be scheduled; series parallel networks; capacities that are balanced, in the sense that the total capacity of arcs entering a (non-terminal) node equals the total capacity of arcs leaving the node; and identical capacities on all arcs.
△ Less
Submitted 20 June, 2013;
originally announced June 2013.