Showing 1–3 of 3 results for author: Mengiste, E
-
Automating lookahead planning using site appearance and space utilization
Authors:
Eyob Mengiste,
Borja Garcia de Soto,
Timo Hartmann
Abstract:
This study proposes a method to automate the development of lookahead planning. The proposed method uses construction material conditions (i.e., appearances) and site space utilization to predict task completion rates. A Gated Recurrent Unit (GRU) based Recurrent Neural Network (RNN) model was trained using a segment of a construction project timeline to estimate completion rates of tasks and prop…
▽ More
This study proposes a method to automate the development of lookahead planning. The proposed method uses construction material conditions (i.e., appearances) and site space utilization to predict task completion rates. A Gated Recurrent Unit (GRU) based Recurrent Neural Network (RNN) model was trained using a segment of a construction project timeline to estimate completion rates of tasks and propose data-aware lookahead plans. The proposed method was evaluated in a sample construction project involving finishing works such as plastering, painting, and installing electrical fixtures. The results show that the proposed method can assist with developing automated lookahead plans. In doing so, this study links construction planning with actual events at the construction site. It extends the traditional scheduling techniques and integrates a broader spectrum of site spatial constraints into lookahead planning.
△ Less
Submitted 30 November, 2023;
originally announced November 2023.
-
Automated spacing measurement of formwork system members with 3D point cloud data
Authors:
Keyi Wu,
Samuel A. Prieto,
Eyob Mengiste,
Borja García de Soto
Abstract:
The formwork system belonging to the temporary structure plays an important role in the smooth progress and successful completion of a construction project. Ensuring that the formwork system is installed as designed is essential for construction safety and quality. The current way to measure the spacing between formwork system members is mostly done using manual measuring tools. This research prop…
▽ More
The formwork system belonging to the temporary structure plays an important role in the smooth progress and successful completion of a construction project. Ensuring that the formwork system is installed as designed is essential for construction safety and quality. The current way to measure the spacing between formwork system members is mostly done using manual measuring tools. This research proposes a framework to measure the spacing of formwork system members using 3D point cloud data to enhance the automation of this quality inspection. The novelty is not only in the integration of the different techniques used but in the detection and measurement of key members in the formwork system without human intervention. The proposed framework was tested on a real construction site. Five cases were investigated to compare the 3D point cloud data approach to the manual approach with traditional measuring tools. The results indicate that the 3D point cloud data approach is a promising solution and can potentially be an effective alternative to the manual approach.
△ Less
Submitted 23 May, 2023;
originally announced May 2023.
-
Investigating the use of ChatGPT for the scheduling of construction projects
Authors:
Samuel A. Prieto,
Eyob T. Mengiste,
Borja García de Soto
Abstract:
Large language models such as ChatGPT have the potential to revolutionize the construction industry by automating repetitive and time-consuming tasks. This paper presents a study in which ChatGPT was used to generate a construction schedule for a simple construction project. The output from ChatGPT was evaluated by a pool of participants that provided feedback regarding their overall interaction e…
▽ More
Large language models such as ChatGPT have the potential to revolutionize the construction industry by automating repetitive and time-consuming tasks. This paper presents a study in which ChatGPT was used to generate a construction schedule for a simple construction project. The output from ChatGPT was evaluated by a pool of participants that provided feedback regarding their overall interaction experience and the quality of the output. The results show that ChatGPT can generate a coherent schedule that follows a logical approach to fulfill the requirements of the scope indicated. The participants had an overall positive interaction experience and indicated the great potential of such a tool to automate many preliminary and time-consuming tasks. However, the technology still has limitations, and further development is needed before it can be widely adopted in the industry. Overall, this study highlights the potential of using large language models in the construction industry and the need for further research.
△ Less
Submitted 27 January, 2023;
originally announced February 2023.