The spiral1 charge breeder: key points for a performant 1+ beam injection
Authors:
L. Maunoury,
O. Kamalou,
J. F. Cam,
S. Damoy,
P. Delahaye,
M. Dubois,
R. Frigot,
S. Hormigos,
C. Vandamme
Abstract:
The SPIRAL1 charge breeder is now under operation. Radioactive beam has already been delivered [1] to Physicist for performing experiment. Although charge breeding efficiencies demonstrated high performances for stable ion beams, those efficiencies regarding radioactive ion beams were found, in the first experiments, lower than expected. The beam optics, prior to the injection of the 1+ ions into…
▽ More
The SPIRAL1 charge breeder is now under operation. Radioactive beam has already been delivered [1] to Physicist for performing experiment. Although charge breeding efficiencies demonstrated high performances for stable ion beams, those efficiencies regarding radioactive ion beams were found, in the first experiments, lower than expected. The beam optics, prior to the injection of the 1+ ions into the SPIRAL1 charge breeder, is of prime importance [2] for getting such high efficiencies. Moreover, the intensities of the radioactive ion beams are so low, that it is really difficult to tune the charge breeder. The tuning of the charge breeder for radioactive ion beams requires a particular procedure often referred as blind tuning. A stable beam hav-ing a close Brho (few percent) is required to find out the set of optic parameters preceding the tuning of the radioactive beam. Hence, it has been decided to focus our effort on that procedure as to get control of the 1+ beam optics leading to high charge breeding efficiencies whatever the 1+ mass, energy and Target Ion Source System (TISS) used. Being aware that each TISS provide ion beams with a specific energy spread DeltaE, and given that the acceptance energy win-dow of the charge breeder is rather narrow; that parameter must play also an important role in the whole charge breed-ing efficiency.
△ Less
Submitted 17 December, 2020;
originally announced December 2020.
New exotic beams from the SPIRAL 1 upgrade
Authors:
P. Delahaye,
M. Dubois,
L. Maunoury,
J. Angot,
O. Bajeat,
B. Blank,
J. C. Cam,
P. Chauveau,
R. Frigot,
B. Jacquot,
P. Jardin,
P. Lecomte,
S. Hormigos,
O. Kamalou,
V. Kuchi,
B. Osmond,
B. M. Retailleau,
A. Savalle,
T. Stora,
V. Toivanen,
J. C. Thomas,
E. Traykov,
P. Ujic,
R. Vondrasek
Abstract:
Since 2001, the SPIRAL 1 facility has been one of the pioneering facilities in ISOL techniques for reaccelerating radioactive ion beams: the fragmentation of the heavy ion beams of GANIL on graphite targets and subsequent ionization in the Nanogan ECR ion source has permitted to deliver beams of gaseous elements (He, N, O, F, Ne, Ar, Kr) to numerous experiments. Thanks to the CIME cyclotron, energ…
▽ More
Since 2001, the SPIRAL 1 facility has been one of the pioneering facilities in ISOL techniques for reaccelerating radioactive ion beams: the fragmentation of the heavy ion beams of GANIL on graphite targets and subsequent ionization in the Nanogan ECR ion source has permitted to deliver beams of gaseous elements (He, N, O, F, Ne, Ar, Kr) to numerous experiments. Thanks to the CIME cyclotron, energies up to 20 AMeV could be obtained. In 2014, the facility was stopped to undertake a major upgrade, with the aim to extend the production capabilities of SPIRAL 1 to a number of new elements. This upgrade, which is presently under commissioning, consists in the integration of an ECR booster in the SPIRAL 1 beam line to charge breed the beam of different 1+ sources. A FEBIAD source (the so-called VADIS from ISOLDE) was chosen to be the future workhorse for producing many metallic ion beams. The charge breeder is an upgraded version of the Phoenix booster which was previously tested in ISOLDE. The performances of the aforementioned ingredients of the upgrade (targets, 1+ source and charge breeder) have been and are still being optimized in the frame of different European projects (EMILIE, ENSAR and ENSAR2). The upgraded SPIRAL 1 facility will provide soon its first new beams for physics and further beam development are undertaken to prepare for the next AGATA campaign. The results obtained during the on-line commissioning period permit to evaluate intensities for new beams from the upgraded facility.
△ Less
Submitted 6 March, 2019;
originally announced March 2019.