Maintenance Duration Estimate for a DEMO Fusion Power Plant, based on the EFDA WP12 pre-conceptual studies
Authors:
O. Crofts,
J. Harman
Abstract:
The erosion and high neutron flux in a fusion power plant results in the need for frequent remote replacement of the plasma facing components. This is a complex and time consuming remote handling operation and its duration directly affects the availability and therefore the commercial viability of the power plant. A tool is needed to allow the maintenance duration to be determined so that developm…
▽ More
The erosion and high neutron flux in a fusion power plant results in the need for frequent remote replacement of the plasma facing components. This is a complex and time consuming remote handling operation and its duration directly affects the availability and therefore the commercial viability of the power plant. A tool is needed to allow the maintenance duration to be determined so that developments in component design can be assessed in terms of their effect on the maintenance duration. This allows the correct balance to be drawn between component cost and performance on the one hand and the remote handling cost and plant availability on the other.
△ Less
Submitted 12 December, 2014;
originally announced December 2014.
-
Status of ITER neutral beam cell remote handling system
Authors:
N Sykes,
C Belcher,
C-H Choi,
O Crofts,
R Crowe,
C Damiani,
S Delavalle,
L Meredith,
T Mindham,
J Raimbach,
A Tesini,
M Van Uffelen
Abstract:
The ITER neutral beam cell will contain up to three heating neutral beams and one diagnostic neutral beam, and four upper ports. Though manual maintenance work is envisaged within the cell, when containment is breached, or the radiological protection is removed the maintenance must be conducted remotely. This maintenance constitutes the removal and replacement of line replaceable units, and their…
▽ More
The ITER neutral beam cell will contain up to three heating neutral beams and one diagnostic neutral beam, and four upper ports. Though manual maintenance work is envisaged within the cell, when containment is breached, or the radiological protection is removed the maintenance must be conducted remotely. This maintenance constitutes the removal and replacement of line replaceable units, and their transport to and from a cask docked to the cell. A design of the remote handling system has been prepared to concept level which this paper describes including the development of a beam line transporter, beam source remote handling equipment, upper port remote handling equipment and equipment for the maintenance of the neutral shield. This equipment has been developed complete the planned maintenance tasks for the components of the neutral beam cell and to have inherent flexibility to enable as yet unforeseen tasks and recovery operations to be performed.
△ Less
Submitted 15 November, 2013;
originally announced November 2013.
-
Applying Remote Handling Attributes to the ITER Neutral Beam Cell Monorail Crane
Authors:
O Crofts,
P Allan,
J Raimbach,
A Tesini,
C-H Choi,
C Damiani,
M Van Uffelen
Abstract:
The maintenance requirements for the equipment in the ITER Neutral Beam Cell requires components to be lifted and transported within the cell by remote means. To meet this requirement, the provision of an overhead crane with remote handling capabilities has been initiated. The layout of the cell has driven the design to consist of a monorail crane that travels on a branched monorail track attached…
▽ More
The maintenance requirements for the equipment in the ITER Neutral Beam Cell requires components to be lifted and transported within the cell by remote means. To meet this requirement, the provision of an overhead crane with remote handling capabilities has been initiated. The layout of the cell has driven the design to consist of a monorail crane that travels on a branched monorail track attached to the cell ceiling. This paper describes the principle design constraints and how the remote handling attributes were applied to the concept design of the monorail crane, concentrating on areas where novel design solutions have been required and on the remote recovery requirements and solutions.
△ Less
Submitted 15 November, 2013;
originally announced November 2013.
-
Pre-conceptual Design Assessment of DEMO Remote Maintenance
Authors:
A. Loving,
O. Crofts,
N. Sykes,
D. Iglesias,
M. Coleman,
J. Thomas,
J. Harman,
U. Fischer,
J. Sanz,
M. Siuko,
M. Mittwollen,
others
Abstract:
EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that,…
▽ More
EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/13, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally valuable in communicating the complexity and scale of the required operations. Through these simulations, estimates of the maintenance task durations have been possible demonstrating that a full replacement of the blankets within 6 months could be achieved. The design of the first wall, including the need to use sacrificial limiters must still be investigated. In support of the maintenance operations, a first indication of the requirements of an Active Maintenance Facility (AMF) has been elaborated.
△ Less
Submitted 27 September, 2013;
originally announced September 2013.