Showing 1–1 of 1 results for author: Beebe, E N
-
High Performance Charge Breeder for HIE-ISOLDE and TSR@ISOLDE Applications
Authors:
Andrey Shornikov,
Edward N. Beebe,
Robert C. Mertzig,
Alexander Pikin,
Fredrik J. C. Wenander
Abstract:
We report on the development of the HEC2 (High Energy Compression and Current) charge breeder, a possible high performance successor to REXEBIS at ISOLDE. The new breeder would match the performance of the HIE-ISOLDE linac upgrade and make full use of the possible installation of a storage ring at ISOLDE (the TSR@ISOLDE initiative [1]). Dictated by ion beam acceptance and capacity requirements, th…
▽ More
We report on the development of the HEC2 (High Energy Compression and Current) charge breeder, a possible high performance successor to REXEBIS at ISOLDE. The new breeder would match the performance of the HIE-ISOLDE linac upgrade and make full use of the possible installation of a storage ring at ISOLDE (the TSR@ISOLDE initiative [1]). Dictated by ion beam acceptance and capacity requirements, the breeder features a 2-3.5 A electron beam. In many cases very high charge states, including bare ions up to Z=70 and Li/Na-like up to Z=92 could be requested for experiments in the storage ring, therefore, electron beam energies up to 150 keV are required. The electron-beam current density needed for producing ions with such high charge states at an injection rate into TSR of 0.5-1 Hz is between 10 and 20 kA/cm2, which agrees with the current density needed to produce A/q<4.5 ions for the HIE-ISOLDE linac with a maximum repetition rate of 100 Hz. The first operation of a prototype electron gun with a pulsed electron beam of 1.5 A and 30 keV was demonstrated in a joint experiment with BNL [2]. In addition, we report on further development aiming to achieve CW operation of an electron beam having a geometrical transverse ion-acceptance matching the injection of 1+ ions (11.5 μm), and an emittance/energy spread of the extracted ion beam matching the downstream mass separator and RFQ (0.08 μm normalized / +/- 1% ).
△ Less
Submitted 9 September, 2014;
originally announced September 2014.